Company base: Sugar Land, Texas · Nationwide sales · Tommy Marco

346-276-9540 tommy@jjtransformers.com

NEW FACTORY SUPPLY / OEM EQUIPMENT

Eaton OEM
power equipmentBuilt for your project.

ALL LISTED OEM EQUIPMENT9–11 weeks total

Delivered to your site. Delivery fully included.

J&J Transformers supplies new Eaton transformer and electrical distribution equipment for data centers, utilities, EPC contractors and industrial projects. Our 9–11 week total delivery window to your site covers all listed OEM equipment: transformers up to 10 MVA / 10,000 kVA, switchgear, switchboards, circuit breakers, busway, substation packages and UPS systems. Delivery to your site is included: freight, import clearance and applicable import duties are covered by the confirmed quotation.

NEW MANUFACTURINGExplore all available equipment options

Equipment supplied through J&J Transformers LLC.

View all options
Transformer requirements500–10,000 kVA
Total time to your site9–11 weeks total
Delivery coverageAll listed equipment
Freight and import dutiesDelivery included

9–11 weeks total to your site — including manufacturing, testing and shipping. This delivery window covers all listed OEM equipment, including transformers up to 10 MVA. Freight, import clearance and applicable import duties are included in the confirmed delivered quotation. Timing starts after PO, approved drawings and commercial production release; your quotation confirms the arrival date. Review the schedule details.

THE EQUIPMENT RANGE

New equipment.
One coordinated supply plan.

Order individual transformers or a defined electrical package through J&J. Equipment is manufactured to the agreed specification; OEM supply is separate from our existing new, unused and pre-owned inventory.

Eaton manufacturer logoOEM EQUIPMENT
Pad-mounted transformer shown in the supplied Eaton Jiangsu factory brochure
01 / FACTORY SUPPLY500–10,000 kVA

Pad-mounted transformers

9–11 weeks totalDelivered to your site · Delivery included

New-build padmount transformers for campus distribution, commercial facilities, utility interfaces and industrial projects. Send the required kVA, primary and secondary voltage, and quantity for an Eaton transformer quotation.

  • Three-phase pad-mounted transformer requirements
  • Dead-front or live-front; loop-feed or radial configuration
  • Fluid, taps, impedance, protection and enclosure to specification
Factory brochure image; configuration and branding confirmed in the quote.
Eaton manufacturer logoOEM EQUIPMENT
Three-phase cast-resin dry-type transformer from the supplied Eaton Jiangsu factory brochure
02 / FACTORY SUPPLY500–10,000 kVA

Dry-type transformers

9–11 weeks totalDelivered to your site · Delivery included

Medium-voltage dry-type transformers, cast-resin transformers and vacuum-impregnated designs for data centers and industrial power. Discuss copper windings, insulation class, temperature rise, cooling and indoor or outdoor enclosure requirements.

  • 500 kVA through 10 MVA / 10,000 kVA project requirements
  • 2 MVA / 2000 kVA packages and bulk orders
  • 12.47 kV to 415 V or 480 V requirements; other ratios by review
Factory brochure image; configuration and branding confirmed in the quote.
Eaton manufacturer logoOEM EQUIPMENT
Eaton Power Xpert XGIS gas-insulated medium-voltage switchgear from the supplied Eaton brochure
03 / FACTORY SUPPLYEaton Power Xpert XGIS

Medium-voltage switchgear

9–11 weeks totalDelivered to your site · Delivery included

Eaton switchgear supply for distribution, data center, utility and industrial lineups. Power Xpert XGIS gas-insulated switchgear is an option where the required voltage, fault rating, protection and space constraints fit the factory design.

  • XGIS configurations up to 38 kV and 2500A
  • Incomer, feeder, bus tie and protection requirements
  • Gas-insulated or other specified construction, quoted by lineup
Factory brochure image; configuration and branding confirmed in the quote.
Eaton manufacturer logoOEM EQUIPMENT
Eaton Pow-R-Line Xpert integrated facility systems switchboard lineup
04 / FACTORY SUPPLYRequirements up to 4000A

Switchboards & circuit breakers

9–11 weeks totalDelivered to your site · Delivery included

Low-voltage switchboards, power circuit breakers and main-tie-main distribution packages. Send the board rating and breaker schedule together, including draw-out requirements, electronic trip units, controls and interrupting capacity.

  • 4000 amp boards and main / tie breakers
  • ATS and control equipment requirements
  • Lineup, breaker model, voltage and listing confirmed in the quote
Eaton product illustration. The quotation confirms your lineup, ratings and configuration. Eaton switchboard reference
Eaton manufacturer logoOEM EQUIPMENT
05 / FACTORY SUPPLY800A distribution and project ratings

Busway & bus duct

9–11 weeks totalDelivered to your site · Delivery included

Electrical busway, bus duct and distribution bus systems for IT halls, mechanical loads and industrial facilities. We can quote 800 amp busway and review Eaton busway requirements against the complete route and load schedule.

  • Copper or aluminum conductor requirements
  • 3-phase, neutral and ground arrangement
  • Price per linear foot plus defined fittings and tap-off scope
Eaton manufacturer logoOEM EQUIPMENT
06 / FACTORY SUPPLYIntegrated project packages

Unit & prefabricated substations

9–11 weeks totalDelivered to your site · Delivery included

New unit substations, compact substations and skid-mounted transformer packages. Define the transformer, medium-voltage section, low-voltage distribution, protection and shipping interfaces as one coordinated equipment scope.

  • Transformer and switchgear package requirements
  • Compact or skid-mounted arrangements
  • Renewable, BESS, industrial and data center applications
Eaton manufacturer logoOEM EQUIPMENT
07 / FACTORY SUPPLYModel and runtime by quotation

UPS systems & critical power

9–11 weeks totalDelivered to your site · Delivery included

Uninterruptible power supply systems for data centers and critical facilities, including Eaton UPS requirements. Send the required kW or kVA, voltage, runtime, battery technology, bypass arrangement and redundancy plan for a project-specific supply quotation.

  • UPS system, batteries and bypass scope
  • N, N+1 or other required system architecture
  • Included in the 9–11 week OEM delivery target; model and scope confirmed in the quote

THE DELIVERY PLAN

9–11 weeks total. Delivered to your site.

The 9–11 week delivery target applies to all listed OEM equipment, including transformers 10 MVA and under, switchgear, switchboards, circuit breakers, busway, substations and UPS systems. Delivery to your site is included: freight, import clearance and applicable import duties are covered by the confirmed quotation.

01 / APPROVE

Drawings & production release

Confirm the specification, initial drawings, PO and commercial release conditions.

02 / BUILD

Manufacturing & factory testing

Manufacturing and factory testing are included in the total delivery window.

03 / DELIVER

Delivered to your site

Shipping and site delivery are included in the 9–11 week total. Freight, import clearance and applicable duties are included in the confirmed quotation.

The 9–11 week total window includes manufacturing, factory testing and shipping through delivery at your site. Timing runs from PO, approved drawings and the agreed commercial production release. Configuration, quantity, factory allocation and destination are confirmed before an order is accepted.

The current dry-type production reference allows 5–6 weeks for manufacture and factory testing after drawing approval, followed by approximately four weeks of shipping. The written quotation confirms the arrival commitment for every item in your package. Equipment above 10 MVA requires a separate delivery review.

Ask us to coordinate priority deliveries and staged releases. Site delivery, offloading, installation and readiness for energization are separate milestones.

9–11 weeks total to your site — delivery included across the listed equipment
EquipmentDelivery planningConfirm before order
Pad-mounted and dry-type transformers up to 10 MVA / 10,000 kVA9–11 weeks total; site delivery includedApproved drawings, quantity, production release and destination
Switchgear, switchboards, circuit breakers and busway9–11 weeks total; site delivery includedComplete lineup, ratings, controls, factory slot and freight
Substation packages and UPS systems within the programme scope9–11 weeks total; site delivery includedModel, transformer rating up to 10 MVA, batteries and complete package scope
Equipment above 10 MVASeparately quoted delivery scheduleFull specification, testing, transport and site interfaces

DELIVERED DUTY PAID

Site delivery included. Freight and duties covered.

J&J’s confirmed DDP quotation includes the agreed equipment, freight to the named destination, import customs clearance and applicable import duties. We define the delivery point and the receiving responsibilities in writing.

Manufacturer & delivery referencesICC: DDP and DAP delivery responsibilities
WHAT THE QUOTE DEFINES
  • Factory drawings and the agreed test and operating-document package
  • International freight and inland transport to the named delivery point
  • Import clearance and import duties included in the DDP supply price
  • Offloading, crane work, installation, field testing and commissioning quoted separately unless expressly included

DDP means Delivered Duty Paid. Site delivery does not by itself include unloading, installation or energization. The signed quotation identifies the exact inclusions, exclusions and responsibility for taxes.

BEYOND STANDARD CONFIGURATIONS

More factory configurations. Reviewed for your project.

The supplied transformer factory brochure also covers oil-immersed distribution and power transformers, cast-resin and vacuum-impregnated dry types, compact substations and integrated renewable-energy packages. Send specialty requirements for technical review. Equipment above 10 MVA has a separately confirmed delivery schedule.

  • Cast-resin, amorphous-alloy and vacuum-impregnated isolation transformers
  • Three-winding and double-split transformer configurations
  • Wind-turbine nacelle and phase-shifting transformer requirements
  • Oil-immersed distribution and larger power-transformer configurations
  • Compact, prefabricated and skid-mounted transformer substations
  • BESS / PCS and step-up transformer package requirements

The Eaton Jiangsu transformer supply route and Eaton’s wider electrical equipment portfolio cover different product families. A UPS, breaker, busway or switchgear request does not mean that product is manufactured at the Jiangsu transformer plant. The quotation identifies the OEM, model and manufacturing entity for each part of your package.

A QUOTE YOUR TEAM CAN USE

Give the factory a complete specification.

A useful OEM quotation pairs the required equipment with the site interfaces, acceptance criteria and delivery milestones. We can start with your single-line diagram, load schedule or preliminary specification.

UL/cUL listing, CE requirements, IEEE/ANSI/IEC design and test requirements, and applicable efficiency rules are checked for the quoted model and destination. Manufacturer literature or a vendor letter does not establish that every configuration has every certification.

BEFORE YOU ORDER

OEM supply questions.

Can J&J supply new Eaton transformers and electrical equipment?

Yes. J&J accepts new Eaton transformer and OEM electrical equipment orders, including pad-mounted and dry-type transformers, switchgear, switchboards, circuit breakers, busway, substation packages and UPS requirements. The written quotation confirms the manufacturer, model, specification, included scope and delivery schedule.

What is the Eaton–Ryan factory relationship?

Eaton announced a 49% investment in Jiangsu Ryan Electrical in April 2023. For the Jiangsu transformer supply route, the quoted manufacturing entity is Eaton Transformer (Jiangsu) Co., Ltd. J&J is your independent equipment supplier; the Eaton name identifies the requested equipment and manufacturer, not ownership of J&J.

Can you quote transformers up to 10 MVA / 10,000 kVA?

Yes. J&J accepts pad-mounted and dry-type transformer requirements up to 10 MVA / 10,000 kVA, including 500, 750, 1000, 1500, 2000, 2500, 3000, 5000, 7500 and 10000 kVA. These are new-build quotation sizes, not a claim of stocked units at every rating. Voltage ratio, design, quantity and factory allocation are confirmed for each order.

Does the 9–11 week delivery target cover all OEM equipment?

Yes. The 9–11 week total delivery window includes manufacturing, testing and shipping to your site for all listed OEM equipment: transformers 10 MVA and under, switchgear, switchboards, circuit breakers, busway, substation packages and UPS systems. The target starts after PO, approved drawings and the agreed commercial production release. Freight, import clearance and applicable import duties are included; the firm site arrival date is confirmed in the written quotation.

Are switchgear, breakers, busway, substations and UPS included in the same delivery programme?

Yes. All of these equipment categories are included in the 9–11 week total delivery window to your site, with freight, import clearance and applicable import duties included in the confirmed quotation. Send the complete lineup, ratings, controls, quantities, busway route, UPS runtime and battery scope, and substation arrangement. The factory confirms the full package and delivery date before the order is accepted.

Is DDP delivery included in the OEM equipment price?

Yes, when specified in J&J’s confirmed DDP quotation. The delivered price includes the agreed freight, import clearance and applicable import duties to the named destination. Unloading, crane work, installation, field testing and commissioning are separate unless the quotation expressly includes them.

Can J&J supply 4000A switchboards, breakers and 800A busway?

Yes. J&J can quote 4,000A board and main/tie breaker requirements, control equipment and 800A distribution busway. Send the single-line diagram, fault rating, protection requirements, conductor and neutral/ground arrangement, route lengths, fittings and quantities so the equipment can be quoted as a coordinated package.

Does every product come from the Eaton Jiangsu transformer factory?

No. The Jiangsu route covers specified transformer and factory package requirements. Eaton switchgear, circuit breakers, busway and UPS are separate product families and may have different manufacturers or production facilities. Your quotation identifies each manufacturing entity and model.

Are all Eaton OEM products UL listed or certified to the same standards?

Certification and listing depend on the exact product, model and configuration. Request the required UL/cUL listing and supporting records, or the applicable IEEE, ANSI, IEC, CE and efficiency requirements, with your specification. J&J confirms the compliance evidence before the order is released.

Is this new-build offer separate from J&J’s current inventory?

Yes. J&J’s inventory remains the place to review existing new, unused, pre-owned and surplus equipment. This OEM page covers new manufacturing and coordinated electrical supply against an agreed specification and factory schedule.

WORK DIRECTLY WITH J&J

Send the specification.
Let’s confirm the supply plan.

Tell Tommy what you need, where it needs to arrive and when. Attach your specification or single-line diagram if you have one. A short message is enough to begin.

Call Email Sales