Buying several transformers or reviewing an exact ratio?
For a multi-unit order, specify each electrical configuration, accepted condition and delivery phase. Start with the current equipment records, then request the identity, documents, allocation and quote scope for each proposed unit.
ABB and high-voltage autotransformer offers
The equipment links retain the complete published ratings and stated condition. A reconnectable common winding is not a simultaneous 115 kV and 69 kV load claim, and a tertiary voltage does not establish the main-winding load capacity.
Buying a 230/115 kV or 230/69 kV autotransformer
Send the one-line, required MVA, selected common-winding connection, tertiary duty, grounding, insulation, impedance and its rating basis, tap range, fault requirements and protection scheme. The responsible project engineer reviews the unit-specific nameplate, drawings and tests against the intended operating direction.
Request equipment price and delivery
Email tommy@jjtransformers.com or call Tommy Marco at 346-276-9540 for the exact equipment record, price and written availability.
- Include the equipment reference, quantity, ratings, acceptable condition, destination and required date.
- Ask for current photos, unit identity, technical records, inspection terms and included accessories.
- Confirm allocation, loading, freight, warranty, payment and delivery milestones in the quotation.
Review a proposed step-down operating direction
Some units can be considered for step-down service, but suitability depends on the actual winding arrangement, permitted operating direction and MVA, cooling, grounding, taps, impedance, insulation, protection and project interfaces. Request the unit's nameplate, drawings, test records and any manufacturer restrictions before accepting a candidate.
The Royal SMIT 525/69 kV record lists 240/320/400 MVA cooling stages and a separate 250 MVA maximum for step-down duty. The 400 MVA step-up rating is not a 400 MVA step-down rating. Its 13.7 kV buried-delta tertiary is not presented as an accessible external load supply.
Autotransformer quotations and winding identification
An autotransformer purchase request needs the actual high/low winding voltages, MVA, power-flow duty and required tertiary arrangement. Shared winding construction differs from an isolating two-winding transformer, so voltage ratio alone does not establish an acceptable replacement.
- Identify common and series winding information, grounding, taps, insulation requirements, impedance and permitted operating directions from the unit records.
- Specify any tertiary's intended function and permitted loading; a buried tertiary must not be presented as a usable load output without supporting records.
Common questions
Written quotes and supporting records control unit-specific ratings, availability, condition, price, and delivery.
Does J&J have an ABB autotransformer offer?
The public ABB record describes 230 kV autotransformer equipment with a common winding reconnectable for 69 or 115 kV service and a 13.5 kV tertiary. Use the exact rating and duty in that record; current allocation and delivery require written confirmation.
Is an autotransformer the same as a two-winding step-down transformer?
No. Its winding construction and electrical connection differ. A matching ratio does not establish interchangeability; review grounding, currents, protection, tertiary duty and the project specification.
Is any autotransformer with the correct voltage ratio suitable for my project?
No. Check actual winding construction, isolation requirements, MVA, grounding, taps, insulation, impedance, tertiary function and operating duty with the project engineer. A ratio match is only one screening input.
Can I request several transformers with different voltage ratios or MVA ratings?
Yes. Send quantity per configuration, winding voltages, continuous MVA, accepted condition and required delivery phase to Tommy. The quotation identifies the actual unit, documents, allocation and included scope for every position. Identical-unit and parallel-operation requirements need explicit review.