Equipment summary
Specifications and scope
| Unit ID | JJ-GEN-CAT3520K |
|---|---|
| Manufacturer | Caterpillar |
| Manufacturer basis | Current J&J G3520K package specification |
| Rating | 2,500 ekW / 3,125 kVA at 0.8 PF per unit; 250 MW total nameplate output |
| Voltage / output | 480 V |
| Frequency | 60 Hz |
| Fuel | Natural gas |
| Manufacture / history dates | 2026 |
| Included package scope | 100 skid-mounted gensets, 100 SCR systems, two GE step-up transformers, one load bank, 12 switchgear lineups, controls and protection, 20 cooling units and five equipment buildings; EPC scope per written agreement |
| Received offer date | |
| Quantity | 100 units |
| Shipping | Equipment readiness within 90 days of deposit received in escrow; transit and EPC schedule agreed separately |
| Availability | Available; equipment ready within 90 days of deposit received in escrow; subject to prior sale |
| Condition basis | Brand new, unused; 2026 production |
| Current location | Release location and logistics confirmed through J&J |
| Listing information reviewed |
Technical values and record basis
Current J&J G3520K package specification
The reviewed offer does not establish additional unit-specific technical values. Request the matching nameplate and complete technical package through J&J.
Details to confirm for this listing
- Matching technical records, current condition, complete equipment scope and transport details
Technical highlights
- Caterpillar G3520K K-Series, 20-cylinder natural gas engines; 2,500 ekW / 3,125 kVA each at 0.8 power factor, 60 Hz, 480 V.
- Skid-mounted generator sets supplied without individual enclosures. Five equipment buildings are specified, each housing 20 generator sets.
- One Safety Power ecoCUBE SCR system per generator set. Emissions configuration and permit suitability are reviewed for the specific project location.
- Balance of plant: two GE 13/115/230 kV step-up transformers, one 3,200 A load bank, two main switchgear lineups and ten sub-line lineups, plant controls and protection, and 20 chiller-cooler units.
- The intermediate step-up from 480 V, medium-voltage collection, transformer MVA ratings and final one-line are established in the project engineering scope.
- Installation, commissioning, testing and documentation are included within the agreed EPC scope. Site responsibilities, exclusions and warranty terms are set out in the definitive written agreement.
- All 100 generator sets and supplied balance-of-plant equipment are specified for readiness within 90 days of deposit received in escrow. This is the equipment readiness milestone; the installation schedule follows site review.
- Contact Tommy Marco for the technical package, inspection arrangements, project scope and commercial terms.
Evidence reviewed
Current J&J G3520K package specification
Records apply only to the stated unit or design basis.
Availability and terms
Available; equipment ready within 90 days of deposit received in escrow; subject to prior sale
Ask for the current technical package, price, included accessories and delivery terms.
Confirm the purchase and delivery scope
Ask J&J to confirm the proposed unit’s allocation, price, inspection access, included accessories, loading and freight boundary, receiving arrangements, release schedule, deposit or reservation terms and any applicable warranty. Photos, matching records and inspection arrangements are coordinated through J&J.
Request written termsCheck this package against your project
Compare electrical output, duty, frequency, fuel, site conditions, operating history and included equipment. Request matching nameplates, maintenance/overhaul records and test reports for the specific package.
- Match the generator, GSU transformer and circuit breaker
- Review 50 Hz and 60 Hz package compatibility
- Compare turbine cores, engines and complete package scope
- Review multi-unit allocations and generator supply packages
- Compare generator step-up transformer requirements
What quantity and condition are offered for Caterpillar reference JJ-GEN-CAT3520K?
100 units. Brand new, unused; 2026 production. Ask J&J for the current unit schedule and matching records before selecting an allocation.
When can this Caterpillar equipment be released or delivered?
Available; equipment ready within 90 days of deposit received in escrow; subject to prior sale. Equipment readiness within 90 days of deposit received in escrow; transit and EPC schedule agreed separately. The last published J&J availability confirmation is 2026-10-23. Ask J&J to reconfirm the allocation against your required schedule. Inspection, preparation, loading, transit and site arrival are confirmed separately in the written quotation.
What is included with reference JJ-GEN-CAT3520K?
100 skid-mounted gensets, 100 SCR systems, two GE step-up transformers, one load bank, 12 switchgear lineups, controls and protection, 20 cooling units and five equipment buildings; EPC scope per written agreement. Confirm the generator or core/engine scope, controls, auxiliaries, electrical interfaces, loading and delivery responsibilities in the offer.
How do I request a quotation and technical package for JJ-GEN-CAT3520K?
Email tommy@jjtransformers.com with reference JJ-GEN-CAT3520K, the required quantity, MW and rating basis, fuel, output voltage, frequency and package scope, destination and needed-on-site date. Call Tommy at 346-276-9540 for specifications, pricing and current written availability. Subject to prior sale.
