Your equipment shortlist
Compare equipment before you request it.
Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.
| Compare | 100 CAT G3520K 2.5 MW Gas GeneratorsJJ-GEN-CAT3520K | CAT 3516E 3000 kW Standby Diesel GeneratorsJJ-GEN-CAT3516E-8 |
|---|---|---|
| Manufacturer | Caterpillar | Caterpillar |
| Rating / output | 2,500 ekW / 3,125 kVA at 0.8 PF per unit; 250 MW total nameplate output | 3,000 kW / 3,333 kVA standby at 0.9 power factor on reviewed nameplate |
| Voltage / winding arrangement | 480 V | 480 V, three-phase |
| Vector group | Not applicable; generator connection per technical package | Wye series, six leads on reviewed nameplate |
| Frequency | 60 Hz | 60 Hz |
| Cooling | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Impedance and base | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Tap changer | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Insulation / BIL | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Quantity represented | 100 units | 8 identified units in the technical package |
| Technical details / open items | Caterpillar G3520K K-Series, 20-cylinder natural gas engines; 2,500 ekW / 3,125 kVA each at 0.8 power factor, 60 Hz, 480 V.; Skid-mounted generator sets supplied without individual enclosures. Five equipment buildings are specified, each housing 20 generator sets.; One Safety Power ecoCUBE SCR system per generator set. Emissions configuration and permit suitability are reviewed for the specific project location.; Balance of plant: two GE 13/115/230 kV step-up transformers, one 3,200 A load bank, two main switchgear lineups and ten sub-line lineups, plant controls and protection, and 20 chiller-cooler units.; The intermediate step-up from 480 V, medium-voltage collection, transformer MVA ratings and final one-line are established in the project engineering scope.; Installation, commissioning, testing and documentation are included within the agreed EPC scope. Site responsibilities, exclusions and warranty terms are set out in the definitive written agreement.; All 100 generator sets and supplied balance-of-plant equipment are specified for readiness within 90 days of deposit received in escrow. This is the equipment readiness milestone; the installation schedule follows site review.; Contact Tommy Marco for the technical package, inspection arrangements, project scope and commercial terms. | Eight 3516E engine/product identities appear in the technical package, with machine-build dates from October through December 2024. The reviewed generator-set nameplate is dated February 2025.; Reviewed nameplate: 3,000 kW / 3,333 kVA, 0.9 PF, 480 V, three-phase, 60 Hz, 4,009 A and 1,800 RPM; wye series, six leads, Class H insulation.; Reviewed factory-order example: 3516E HPD, 3,000 ekW standby with fan, EMCP 4.2B controller, 5,000 A IEC busbar with top cable entry, AF81AVS radiator and dual electric starting.; That factory-order example specifies two 35 A battery chargers, no batteries ordered, no factory circuit breaker, non-UL-2200-listed package, no CSA selection and no seismic certification selection. Panel and decal selection is Portuguese. Match the actual order record to each selected unit.; Emissions records identify the 2024 engine family as EPA Emergency Stationary, constant speed. This is not a claim of prime/continuous duty or of suitability for a particular site's emissions permit.; The documented 3 MW rating is standby. A proposed lower output or duty change, including 2.75 MW operation, needs the selected-unit OEM/dealer rating and emissions review; no continuous rating or automatic conversion is promised. |
| Evidence reviewed | Current J&J G3520K package specification | J&J technical package dated November 3, 2026: eight-unit build schedule, one reviewed factory-order record and one reviewed generator-set nameplate |
| Technical value basis | Current J&J G3520K package specification | Reviewed factory-order example and nameplate in the November 3, 2026 J&J technical package; match selected-unit records |
| Details to confirm | Matching technical records, current condition, complete equipment scope and transport details | Selected-unit condition, hours, service records and allocation; Per-unit factory options and certification selections; Any proposed lower-output or duty change and site emissions-permit acceptance |
| Represented condition | Brand new, unused; 2026 production | Factory configuration documented; selected-unit condition, hours and service history supplied with the quotation |
| Technical records reviewed | 2026-10-23 | 2026-11-05 |
| Availability | Available; equipment ready within 90 days of deposit received in escrow; subject to prior sale | Eight-unit package documented November 3, 2026; current allocation and release schedule confirmed by quotation |
| Availability last confirmed | 2026-10-23 | Request current confirmation |
| Shipping estimate | Equipment readiness within 90 days of deposit received in escrow; transit and EPC schedule agreed separately | Preparation, loading, transit and site delivery scheduled for the selected units |
| Nameplate reviewed | Not recorded as reviewed; request it | Yes — request the unit package |
| Drawings reviewed | Not recorded as reviewed; request them | Not recorded as reviewed; request them |
| Factory test report reviewed | Not recorded as reviewed; request test records | Not recorded as reviewed; request test records |
| This unit only | Request more info | Request more info |
One request
Request Availability for Your Shortlist.
Email Tommy to discuss these options. The listing IDs will already be in the email subject.
What still needs to be checked?
Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.
Match the nameplate to the specification · Review surplus equipment records · Procurement checklist
