Mobile and aeroderivative gas turbine offers
Review each GE position separately. TM2500 and LM2500 packages differ in output, hours, combustion configuration, generator scope and frequency. The LM6000 PC refurbishment fleet is targeted for 2027 readiness, while the LM6000 PD SPRINT position is a used cogeneration plant requiring dismantling.
Siemens gas turbines and combined-cycle offers
The SGT-600 offers include separate unused, overhauled and 35 MW combined-cycle positions. The SGT-200 record is a used 2010 turbine position with approximately 45,000 reported hours. Larger SGT800, SGT5-4000F and SGT5-2000E offers have their own plant scope and evidence requirements.
What should a gas turbine quotation include?
Specify simple-cycle or combined-cycle duty, gross/net MW basis, frequency, fuel, emissions configuration, site conditions, hours and starts, overhaul history, generator, controls, auxiliaries and the package boundary. Separate equipment release from dismantling, transport, installation and commissioning dates.
Common questions
Written quotes and supporting records control unit-specific ratings, availability, condition, price, and delivery.
Are all listed gas turbines ready for immediate shipment?
No. Some positions require refurbishment, completion or dismantling. Each listing identifies its quoted schedule or open status; current allocation and delivery require a written quotation.
Does a 50 Hz turbine package automatically work at 60 Hz?
No. Confirm the exact turbine, gearbox, generator, controls and auxiliaries, and define any proposed conversion with the responsible engineering team. The offer must state the resulting output and acceptance-test basis.