Equipment summary
Specifications and scope
| Unit ID | JJ-TUR-001 |
|---|---|
| Manufacturer | GE |
| Manufacturer basis | Written equipment offer; unit-specific technical records and identity to confirm |
| Rating | 29 MW reported output |
| Voltage / output | Generator voltage to confirm |
| Frequency | Frequency to confirm |
| Fuel | Gas turbine fuel configuration to confirm |
| Manufacture / history dates | 2012 |
| Included package scope | Mobile gas-turbine package; trailer and auxiliary scope to confirm |
| Received offer date | |
| Quantity | 1 offered package |
| Availability | Offered subject to prior sale; current availability and release schedule to confirm |
| Condition basis | 2012 package; operating and maintenance history to confirm |
| Current location | Location confirmed with quotation |
| Written offer reviewed |
Technical highlights
- Two supplier-provided equipment photos from the October 2, 2026 offer are shown. Matching nameplates, service records and current condition are requested with the quotation.
- Confirm generator frequency, fuel system, controls, transport scope and hours before technical acceptance.
- Availability has not been independently reconfirmed; this is separate from the 33.9 MW TM2500+ listing.
Evidence reviewed
Written equipment offer; unit-specific technical records and identity to confirm
Records apply only to the stated unit or design basis.
Availability and terms
Offered subject to prior sale; current availability and release schedule to confirm
Ask for the current technical package, price, included accessories and delivery terms.
Confirm the purchase and delivery scope
Ask J&J to confirm the proposed unit’s allocation, price, inspection access, included accessories, loading and freight boundary, receiving arrangements, release schedule, deposit or reservation terms and any applicable warranty. Photos, matching records and inspection arrangements are coordinated through J&J.
Request written termsCheck this package against your project
Compare electrical output, duty, frequency, fuel, site conditions, operating history and included equipment. Request matching nameplates, maintenance/overhaul records and test reports for the specific package.
- Match the generator, GSU transformer and circuit breaker
- Review 50 Hz and 60 Hz package compatibility
- Compare generator step-up transformer requirements
How is availability confirmed for this package?
Offered subject to prior sale; current availability and release schedule to confirm. The received offer date and record review are not a current reservation. Ask J&J for written allocation, price and release timing.
What equipment is included?
Mobile gas-turbine package; trailer and auxiliary scope to confirm. Confirm the complete equipment schedule, accessories, controls, loading, dismantling where applicable and shipment scope in the quotation.
How do I request the technical package?
Email tommy@jjtransformers.com with reference JJ-TUR-001, required MW, voltage, frequency, fuel, quantity and needed-on-site date, or call 346-276-9540.


