Company base: Sugar Land, Texas · Nationwide sales · Tommy Marco

346-276-9540 tommy@jjtransformers.com

Turbine opportunity · JJ-TUR-002

GE TM2500+ 33.9 MW Mobile Gas Turbine — 60 Hz

Equipment location: Location confirmed with quotation. J&J is based in Sugar Land, Texas and serves projects nationwide.

Condition: Zero time since reported GE overhaul; previously operated equipment. J&J offers this GE turbine position for project screening. Engine and mobile trailer package; reassembly and shipping scope to confirm. The received offer is dated 2026-10-05; current allocation, price and delivery require written reconfirmation. Email Tommy with reference JJ-TUR-002 for specifications, price and current release timing. Listing information reviewed .

Availability & record date
Written equipment offerOffer received Approximately two months quoted; current schedule to confirmRequest current allocation and release terms · subject to prior sale
Photos on requestAsk Tommy for photos & specs
Photo availability

Public photos are not shown for this listing. Ask J&J for a current photo set and the matching technical records.

Equipment summary

Specifications and scope

Unit IDJJ-TUR-002
ManufacturerGE
Manufacturer basisWritten equipment offer; unit-specific technical records and identity to confirm
Rating33.9 MW reported output
Voltage / outputGenerator voltage to confirm
Frequency60 Hz
FuelGas turbine fuel specification to confirm
Operating historyApproximately 49,000 total hours and 750 starts reported before overhaul
Included package scopeEngine and mobile trailer package; reassembly and shipping scope to confirm
Received offer date
Quantity1 offered package
ShippingApproximately two months quoted; current schedule to confirm
AvailabilityOffered subject to prior sale; Approximately two months quoted; current schedule to confirm
Condition basisZero time since reported GE overhaul; previously operated equipment
Current locationLocation confirmed with quotation
Listing information reviewed

Technical values and record basis

Received equipment offer; ratings, history and scope are representations until matched to the selected package.

CombustionSAC, not DLE, represented
Overhaul basisZero time since GE overhaul; approximately 49,000 lifetime hours and 750 starts before overhaul

Details to confirm for this listing

  • Matching engine/turbine and generator nameplates, individual hours/starts, maintenance/overhaul records and current tests
  • Electrical duty, site-output basis, fuel/emissions, complete auxiliaries and loading/dismantling/transport scope

Technical highlights

  • SAC combustion configuration reported; this is not represented as DLE.
  • Zero time since overhaul does not mean new manufacture or zero lifetime operating hours.
  • Allocation, reassembly scope and release require current written confirmation.

Evidence reviewed

Written equipment offer; unit-specific technical records and identity to confirm

Records apply only to the stated unit or design basis.

Availability and terms

Offered subject to prior sale; Approximately two months quoted; current schedule to confirm

Ask for the current technical package, price, included accessories and delivery terms.

Confirm the purchase and delivery scope

Ask J&J to confirm the proposed unit’s allocation, price, inspection access, included accessories, loading and freight boundary, receiving arrangements, release schedule, deposit or reservation terms and any applicable warranty. Photos, matching records and inspection arrangements are coordinated through J&J.

Request written terms

Check this package against your project

Compare electrical output, duty, frequency, fuel, site conditions, operating history and included equipment. Request matching nameplates, maintenance/overhaul records and test reports for the specific package.

How is availability confirmed for this package?

Offered subject to prior sale; Approximately two months quoted; current schedule to confirm. The received offer date and record review are not a current reservation. Ask J&J for written allocation, price and release timing.

What equipment is included?

Engine and mobile trailer package; reassembly and shipping scope to confirm. Confirm the complete equipment schedule, accessories, controls, loading, dismantling where applicable and shipment scope in the quotation.

How do I request the technical package?

Email tommy@jjtransformers.com with reference JJ-TUR-002, required MW, voltage, frequency, fuel, quantity and needed-on-site date, or call 346-276-9540.

Compare related equipment

Review gas and steam turbines

Need a different unit?

Send the exact requirement.

Include MVA or MW, voltage, quantity, site, and need-by date for a private match.

Email for Availability
Call Email Sales