Equipment summary
Specifications and scope
| Unit ID | JJ-TUR-W501B-70 |
|---|---|
| Manufacturer | Westinghouse |
| Manufacturer basis | Equipment availability supplied by J&J on October 26, 2026; matching technical records provided with the unit quotation |
| Rating | 70 MW per unit; 140 MW aggregate stated unit capacity for both units |
| Voltage / output | Generator voltage confirmed for the selected unit and package |
| Frequency | Installed frequency confirmed for the selected unit |
| Included package scope | Turbine and included auxiliaries per unit quotation; generator, controls and balance of plant itemized separately |
| Received offer date | |
| Quantity | 2 units |
| Shipping | Ready to go; loading, transport and arrival dates agreed with the buyer |
| Availability | 2 units available and ready to go, as advised by J&J October 26, 2026; subject to prior sale and written allocation |
| Condition basis | Unit condition, operating hours and maintenance history confirmed with the technical package |
| Current location | Inspection and dispatch details provided through J&J |
| Listing information reviewed |
Technical values and record basis
Equipment availability supplied by J&J on October 26, 2026; matching technical records provided with the unit quotation
The reviewed offer does not establish additional unit-specific technical values. Request the matching nameplate and complete technical package through J&J.
Details to confirm for this listing
- Matching technical records, current condition, complete equipment scope and transport details
Technical highlights
- Two Westinghouse 501B industrial gas turbine units, 70 MW each, available and ready to go through J&J.
- 140 MW aggregate stated unit capacity across both units; confirm the rating basis and expected site output with the technical records.
- Request installed frequency, generator voltage and scope, fuel and combustion configuration, controls, hours, starts, maintenance and inspection records.
- Equipment readiness is separate from transport, installation and commissioning. Inspection access, loading, shipping and site responsibilities are agreed in the written offer.
Equipment availability and buyer questions
Does J&J have Westinghouse 501B 70 MW turbines for sale?
Two Westinghouse 501B gas turbine units are available and ready to go through J&J, rated 70 MW each. Together the two units represent 140 MW of stated aggregate capacity. Contact Tommy Marco for the technical package, inspection, pricing and written release arrangements.
Are the two Westinghouse 501B units ready to go?
Yes. J&J advises that both 70 MW units are available and ready to go as of October 26, 2026. The combined stated unit capacity is 140 MW. Written allocation, inspection, loading and transport arrangements are confirmed before purchase; subject to prior sale.
Evidence reviewed
Equipment availability supplied by J&J on October 26, 2026; matching technical records provided with the unit quotation
Records apply only to the stated unit or design basis.
Availability and terms
2 units available and ready to go, as advised by J&J October 26, 2026; subject to prior sale and written allocation
Ask for the current technical package, price, included accessories and delivery terms.
Confirm the purchase and delivery scope
Ask J&J to confirm the proposed unit’s allocation, price, inspection access, included accessories, loading and freight boundary, receiving arrangements, release schedule, deposit or reservation terms and any applicable warranty. Photos, matching records and inspection arrangements are coordinated through J&J.
Request written termsCheck this package against your project
Compare electrical output, duty, frequency, fuel, site conditions, operating history and included equipment. Request matching nameplates, maintenance/overhaul records and test reports for the specific package.
- Match the generator, GSU transformer and circuit breaker
- Review 50 Hz and 60 Hz package compatibility
- Compare turbine cores, engines and complete package scope
- Review multi-unit allocations and generator supply packages
- Compare generator step-up transformer requirements
What quantity and condition are offered for Westinghouse reference JJ-TUR-W501B-70?
2 units. Unit condition, operating hours and maintenance history confirmed with the technical package. Ask J&J for the current unit schedule and matching records before selecting an allocation.
When can this Westinghouse equipment be released or delivered?
2 units available and ready to go, as advised by J&J October 26, 2026; subject to prior sale and written allocation. Ready to go; loading, transport and arrival dates agreed with the buyer. The last published J&J availability confirmation is 2026-10-26. Ask J&J to reconfirm the allocation against your required schedule. Inspection, preparation, loading, transit and site arrival are confirmed separately in the written quotation.
What is included with reference JJ-TUR-W501B-70?
Turbine and included auxiliaries per unit quotation; generator, controls and balance of plant itemized separately. Confirm the generator or core/engine scope, controls, auxiliaries, electrical interfaces, loading and delivery responsibilities in the offer.
How do I request a quotation and technical package for JJ-TUR-W501B-70?
Email tommy@jjtransformers.com with reference JJ-TUR-W501B-70, the required quantity, MW and rating basis, fuel, output voltage, frequency and package scope, destination and needed-on-site date. Call Tommy at 346-276-9540 for specifications, pricing and current written availability. Subject to prior sale.
