Your equipment shortlist
Compare equipment before you request it.
Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.
| Compare | 2 Westinghouse 501B 70 MW Gas TurbinesJJ-TUR-W501B-70 | GE Frame 5 Gas Turbine UnitsJJ-TUR-FRAME5 |
|---|---|---|
| Manufacturer | Westinghouse | GE |
| Rating / output | 70 MW per unit; 140 MW aggregate stated unit capacity for both units | Unit-specific MW rating supplied with quotation |
| Voltage / winding arrangement | Generator voltage confirmed for the selected unit and package | Generator voltage confirmed for the selected unit and package |
| Vector group | Not applicable; generator and transformer connections reviewed separately | Not applicable; generator and transformer connections reviewed separately |
| Frequency | Installed frequency confirmed for the selected unit | Installed frequency confirmed for the selected unit |
| Cooling | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Impedance and base | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Tap changer | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Insulation / BIL | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Quantity represented | 2 units | Units available; request current quantity |
| Technical details / open items | Two Westinghouse 501B industrial gas turbine units, 70 MW each, available and ready to go through J&J.; 140 MW aggregate stated unit capacity across both units; confirm the rating basis and expected site output with the technical records.; Request installed frequency, generator voltage and scope, fuel and combustion configuration, controls, hours, starts, maintenance and inspection records.; Equipment readiness is separate from transport, installation and commissioning. Inspection access, loading, shipping and site responsibilities are agreed in the written offer. | GE Frame 5 gas turbines available through J&J for equipment purchase and project review.; For a replacement Frame 5 turbine, compare the exact model, output, generator frequency, shaft arrangement, combustion system and controls with the existing plant.; Request the installed fuel configuration, hours, starts, inspection findings, overhaul history and preservation records for the selected unit.; Specify a turbine-only requirement or the desired turbine-generator package; included auxiliaries, removal, loading and delivery are itemized in the offer. |
| Evidence reviewed | Equipment availability supplied by J&J on October 26, 2026; matching technical records provided with the unit quotation | Equipment availability supplied by J&J on October 26, 2026; matching technical records provided with the unit quotation |
| Technical value basis | Equipment availability supplied by J&J on October 26, 2026; matching technical records provided with the unit quotation | Equipment availability supplied by J&J on October 26, 2026; matching technical records provided with the unit quotation |
| Details to confirm | Matching technical records, current condition, complete equipment scope and transport details | Matching technical records, current condition, complete equipment scope and transport details |
| Represented condition | Unit condition, operating hours and maintenance history confirmed with the technical package | Unit condition, operating hours and maintenance history confirmed with the technical package |
| Technical records reviewed | 2026-10-26 | 2026-10-26 |
| Availability | 2 units available and ready to go, as advised by J&J October 26, 2026; subject to prior sale and written allocation | Available through J&J; subject to prior sale and written allocation |
| Availability last confirmed | 2026-10-26 | 2026-10-26 |
| Shipping estimate | Ready to go; loading, transport and arrival dates agreed with the buyer | Request a written dispatch and delivery schedule |
| Nameplate reviewed | Not recorded as reviewed; request it | Not recorded as reviewed; request it |
| Drawings reviewed | Not recorded as reviewed; request them | Not recorded as reviewed; request them |
| Factory test report reviewed | Not recorded as reviewed; request test records | Not recorded as reviewed; request test records |
| This unit only | Request more info | Request more info |
One request
Request Availability for Your Shortlist.
Email Tommy to discuss these options. The listing IDs will already be in the email subject.
What still needs to be checked?
Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.
Match the nameplate to the specification · Review surplus equipment records · Procurement checklist
