Your equipment shortlist
Compare equipment before you request it.
Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.
| Compare | GE TM2500+ 33.9 MW Mobile Gas Turbine — 60 HzJJ-TUR-002 | GE Frame 7 Gas Turbine UnitsJJ-TUR-FRAME7 |
|---|---|---|
| Manufacturer | GE | GE |
| Rating / output | 33.9 MW reported output | Unit-specific MW rating supplied with quotation |
| Voltage / winding arrangement | Generator voltage to confirm | Generator voltage confirmed for the selected unit and package |
| Vector group | Not applicable; generator connection to confirm | Not applicable; generator and transformer connections reviewed separately |
| Frequency | 60 Hz | Installed frequency confirmed for the selected unit |
| Cooling | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Impedance and base | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Tap changer | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Insulation / BIL | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Quantity represented | 1 offered package | Units available; request current quantity |
| Technical details / open items | SAC combustion configuration reported; this is not represented as DLE.; Zero time since overhaul does not mean new manufacture or zero lifetime operating hours.; Allocation, reassembly scope and release require current written confirmation. | GE Frame 7 industrial gas turbine units offered through J&J for power generation equipment buyers.; Frame 7 identifies a turbine family. The exact model and variant, rated output, combustion system and installed frequency are established per offered unit.; Send the required site output, fuel specification, emissions requirements, existing controls and needed-on-site date for a relevant equipment quotation.; Confirm turbine-only versus turbine-generator scope, maintenance records, generator and excitation equipment, auxiliaries, inspection access and shipment responsibilities. |
| Evidence reviewed | Written equipment offer; unit-specific technical records and identity to confirm | Equipment availability supplied by J&J on October 26, 2026; matching technical records provided with the unit quotation |
| Technical value basis | Received equipment offer; ratings, history and scope are representations until matched to the selected package. | Equipment availability supplied by J&J on October 26, 2026; matching technical records provided with the unit quotation |
| Details to confirm | Matching engine/turbine and generator nameplates, individual hours/starts, maintenance/overhaul records and current tests; Electrical duty, site-output basis, fuel/emissions, complete auxiliaries and loading/dismantling/transport scope | Matching technical records, current condition, complete equipment scope and transport details |
| Represented condition | Zero time since reported GE overhaul; previously operated equipment | Unit condition, operating hours and maintenance history confirmed with the technical package |
| Technical records reviewed | 2026-10-26 | 2026-10-26 |
| Availability | Offered subject to prior sale; current availability and release schedule to confirm | Available through J&J; subject to prior sale and written allocation |
| Availability last confirmed | Request current confirmation | 2026-10-26 |
| Shipping estimate | Approximately two months quoted; current schedule to confirm | Request a written dispatch and delivery schedule |
| Nameplate reviewed | Not recorded as reviewed; request it | Not recorded as reviewed; request it |
| Drawings reviewed | Not recorded as reviewed; request them | Not recorded as reviewed; request them |
| Factory test report reviewed | Not recorded as reviewed; request test records | Not recorded as reviewed; request test records |
| This unit only | Request more info | Request more info |
One request
Request Availability for Your Shortlist.
Email Tommy to discuss these options. The listing IDs will already be in the email subject.
What still needs to be checked?
Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.
Match the nameplate to the specification · Review surplus equipment records · Procurement checklist
