Your equipment shortlist
Compare equipment before you request it.
Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.
| Compare | GE TM2500 Gen 6 29 MW Mobile Gas TurbineJJ-TUR-001 | GE Frame 6B Gas Turbine UnitsJJ-TUR-FRAME6B |
|---|---|---|
| Manufacturer | GE | GE |
| Rating / output | 29 MW reported output; installed configuration and site output to confirm | Unit-specific MW rating supplied with quotation |
| Voltage / winding arrangement | 11.5 kV represented | Generator voltage confirmed for the selected unit and package |
| Vector group | Not applicable; generator connection to confirm | Not applicable; generator and transformer connections reviewed separately |
| Frequency | 50/60 Hz advertised; conflicting 50 Hz field — installed configuration to confirm | Installed frequency confirmed for the selected unit |
| Cooling | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Impedance and base | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Tap changer | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Insulation / BIL | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Quantity represented | 1 offered package | Units available; request current quantity |
| Technical details / open items | Two supplier-provided equipment photos from the October 2, 2026 offer are shown. Matching nameplates, service records and current condition are requested with the quotation.; Confirm generator frequency, fuel system, controls, transport scope and hours before technical acceptance.; Availability has not been independently reconfirmed; this is separate from the 33.9 MW TM2500+ listing. | GE Frame 6B / 6B heavy-duty gas turbine units available for sale through J&J.; For industrial power, refinery, cogeneration or mechanical-drive evaluation, confirm the actual shaft arrangement and supplied equipment against the intended duty.; Match the complete 6B nameplate and model designation; a family name alone does not establish the offered unit's MW rating or configuration.; Request current quantity, generator frequency and voltage where included, fuel configuration, controls, inspection history, price and release schedule. |
| Evidence reviewed | Written equipment offer; unit-specific technical records and identity to confirm | Equipment availability supplied by J&J on October 26, 2026; matching technical records provided with the unit quotation |
| Technical value basis | Received equipment offer; ratings, history and scope are representations until matched to the selected package. | Equipment availability supplied by J&J on October 26, 2026; matching technical records provided with the unit quotation |
| Details to confirm | Matching turbine/generator nameplates, actual installed frequency, maintenance records and final auxiliary/trailer scope | Matching technical records, current condition, complete equipment scope and transport details |
| Represented condition | Used; former standby service represented; current condition and maintenance history to confirm | Unit condition, operating hours and maintenance history confirmed with the technical package |
| Technical records reviewed | 2026-10-26 | 2026-10-26 |
| Availability | Offered subject to prior sale; current availability and release schedule to confirm | Available through J&J; subject to prior sale and written allocation |
| Availability last confirmed | Request current confirmation | 2026-10-26 |
| Shipping estimate | Request a written dispatch and delivery schedule | Request a written dispatch and delivery schedule |
| Nameplate reviewed | Not recorded as reviewed; request it | Not recorded as reviewed; request it |
| Drawings reviewed | Not recorded as reviewed; request them | Not recorded as reviewed; request them |
| Factory test report reviewed | Not recorded as reviewed; request test records | Not recorded as reviewed; request test records |
| This unit only | Request more info | Request more info |
One request
Request Availability for Your Shortlist.
Email Tommy to discuss these options. The listing IDs will already be in the email subject.
What still needs to be checked?
Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.
Match the nameplate to the specification · Review surplus equipment records · Procurement checklist