| Compare | 88 MVA 230/34.5 kV WEG Power TransformerJJ-WEG-230-88 | 167 MVA 230/34.5 kV Fortune Electric TransformerJJ-FORTUNE-230-167 |
|---|---|---|
| Manufacturer | WEG | Fortune Electric |
| Rating / output | 53/70.5/88 MVA; 18.55/24.675/30.8 MVA tertiary | 100/133/167 MVA; 35 MVA tertiary |
| Voltage / winding arrangement | 230/34.5 kV with 13.8 kV stabilizing delta tertiary | 230/34.5 kV with 13.3 kV buried-delta tertiary |
| Vector group | YNyn0d1 | YNyn0d1 |
| Frequency | 60 Hz | 60 Hz |
| Cooling | ONAN / ONAF1 / ONAF2 | ONAN / ONAF1 / ONAF2 |
| Impedance and base | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Tap changer | HV OLTC; 207–253 kV (±10%); 16 raise / 16 lower steps of 0.625% | HV OLTC; 207–253 kV (±10%), design basis |
| Insulation / BIL | Not documented; confirm with J&J | HV line 750 kV; HV neutral and LV 200 kV; tertiary 110 kV |
| Quantity represented | 1 nameplate-documented unit | 1 unit |
| Technical details / open items | Three-phase, 60 Hz, ONAN/ONAF1/ONAF2, vector group YNyn0d1; 230 kV grounded-wye primary, 34.5 kV grounded-wye secondary, and 13.8 kV stabilizing delta tertiary; HV LTC represented at plus/minus 10% with 16 raise and 16 lower steps; 2020 manufacture shown on the reviewed nameplate drawing | Three-phase, 60 Hz; ONAN/ONAF1/ONAF2 cooling; 65 C winding rise; Grounded-wye / grounded-wye / delta; vector group YNyn0d1; HV OLTC range 207-253 kV; 13.3 kV, 35 MVA buried-delta tertiary; Copper windings, Type II mineral oil; Nameplate drawing identifies suitability for step-up operation; final test results and impedance available subject to confirmation |
| Evidence reviewed | Serial-specific nameplate drawing reviewed | Nameplate drawing reviewed |
| Technical value basis | Supplied approval nameplate drawing; the impedance field is not completed. | Supplied design nameplate and outline drawings; blank final values remain unconfirmed. |
| Details to confirm | Final tested impedance/base, all winding/bushing BIL levels and oil quantity; Matching factory tests, current preservation, final dimensions and complete accessories | Final tested impedance and base, manufacture year and final tap-switch specification; Final oil quantity, dimensions, tests, current preservation and complete accessories |
| Represented condition | Brand new, never used and never energized; 2020 nameplate reviewed | Brand new, never used and never energized |
| Equipment location | USA | USA |
| Technical records reviewed | 2026-10-08 | 2026-10-08 |
| Availability | Available; nameplate drawing reviewed; subject to prior sale and written reconfirmation | Available; subject to prior sale and written confirmation |
| Availability last confirmed | 2026-09-24 | 2026-09-24 |
| Shipping estimate | Request a written dispatch and delivery schedule | Request a written dispatch and delivery schedule |
| Nameplate reviewed | Yes — request the unit package | Yes — request the unit package |
| Drawings reviewed | Yes — request matching unit drawings | Yes — request matching unit drawings |
| Factory test report reviewed | Not recorded as reviewed; request test records | Not recorded as reviewed; request test records |
| This unit only | Request more info | Request more info |
One request
Request Availability for Your Shortlist.
Email Tommy to discuss these options. The listing IDs will already be in the email subject.
What still needs to be checked?
Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.