Your equipment shortlist
Compare equipment before you request it.
Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.
| Compare | GE Frame 5 Gas Turbine UnitsJJ-TUR-FRAME5 | GE Frame 9 Gas Turbine UnitsJJ-TUR-FRAME9 |
|---|---|---|
| Manufacturer | GE | GE |
| Rating / output | Unit-specific MW rating supplied with quotation | Unit-specific MW rating supplied with quotation |
| Voltage / winding arrangement | Generator voltage confirmed for the selected unit and package | Generator voltage confirmed for the selected unit and package |
| Vector group | Not applicable; generator and transformer connections reviewed separately | Not applicable; generator and transformer connections reviewed separately |
| Frequency | Installed frequency confirmed for the selected unit | Installed frequency confirmed for the selected unit |
| Cooling | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Impedance and base | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Tap changer | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Insulation / BIL | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Quantity represented | Units available; request current quantity | Units available; request current quantity |
| Technical details / open items | GE Frame 5 gas turbines available through J&J for equipment purchase and project review.; For a replacement Frame 5 turbine, compare the exact model, output, generator frequency, shaft arrangement, combustion system and controls with the existing plant.; Request the installed fuel configuration, hours, starts, inspection findings, overhaul history and preservation records for the selected unit.; Specify a turbine-only requirement or the desired turbine-generator package; included auxiliaries, removal, loading and delivery are itemized in the offer. | GE Frame 9 heavy-duty gas turbine units available through J&J for power plant equipment inquiries.; Specify the required Frame 9 variant, installed frequency, site conditions and net output requirement; the family name is not a unit-specific performance rating.; For simple-cycle or combined-cycle project screening, confirm the generator, exhaust interface, heat-recovery equipment and balance of plant actually included.; Current quantity, fuel system, operating hours, inspection and overhaul history, condition, price and release milestones are supplied with the equipment schedule. |
| Evidence reviewed | Equipment availability supplied by J&J on October 26, 2026; matching technical records provided with the unit quotation | Equipment availability supplied by J&J on October 26, 2026; matching technical records provided with the unit quotation |
| Technical value basis | Equipment availability supplied by J&J on October 26, 2026; matching technical records provided with the unit quotation | Equipment availability supplied by J&J on October 26, 2026; matching technical records provided with the unit quotation |
| Details to confirm | Matching technical records, current condition, complete equipment scope and transport details | Matching technical records, current condition, complete equipment scope and transport details |
| Represented condition | Unit condition, operating hours and maintenance history confirmed with the technical package | Unit condition, operating hours and maintenance history confirmed with the technical package |
| Technical records reviewed | 2026-10-26 | 2026-10-26 |
| Availability | Available through J&J; subject to prior sale and written allocation | Available through J&J; subject to prior sale and written allocation |
| Availability last confirmed | 2026-10-26 | 2026-10-26 |
| Shipping estimate | Request a written dispatch and delivery schedule | Request a written dispatch and delivery schedule |
| Nameplate reviewed | Not recorded as reviewed; request it | Not recorded as reviewed; request it |
| Drawings reviewed | Not recorded as reviewed; request them | Not recorded as reviewed; request them |
| Factory test report reviewed | Not recorded as reviewed; request test records | Not recorded as reviewed; request test records |
| This unit only | Request more info | Request more info |
One request
Request Availability for Your Shortlist.
Email Tommy to discuss these options. The listing IDs will already be in the email subject.
What still needs to be checked?
Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.
Match the nameplate to the specification · Review surplus equipment records · Procurement checklist