Your equipment shortlist
Compare equipment before you request it.
Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.
| Compare | New 220 MVA 230/34.5 kV ABB/Hitachi TransformerJJ-230-220-1 | 167 MVA 230/34.5 kV Fortune Electric TransformerJJ-FORTUNE-230-167 |
|---|---|---|
| Manufacturer | ABB / Hitachi | Fortune Electric |
| Rating / output | 132/176/220 MVA | 100/133/167 MVA; 35 MVA tertiary |
| Voltage / winding arrangement | 230/34.5 kV with 13.8 kV buried-delta tertiary | 230/34.5 kV with 13.3 kV buried-delta tertiary |
| Vector group | YNyn0d1 — Wye–Wye / Delta | YNyn0d1 |
| Frequency | 60 Hz | 60 Hz |
| Cooling | ONAN / ONAF / ODAF | ONAN / ONAF1 / ONAF2 |
| Impedance and base | H–X: 10.47% at 132 MVA, 230/34.5 kV | Not documented; confirm with J&J |
| Tap changer | HV OLTC; nameplate tap table spans 205.8–254.2 kV; confirm the selected tap and final switch schedule | HV OLTC; 207–253 kV (±10%), design basis |
| Insulation / BIL | HV line 900 kV; HV neutral, LV and tertiary 200 kV | HV line 750 kV; HV neutral and LV 200 kV; tertiary 110 kV |
| Quantity represented | 1 unit | 1 unit |
| Technical details / open items | 132/176/220 MVA, 230 kV grounded-wye high side and 34.5 kV grounded-wye low side; YNyn0d1 connection documented in the manufacturer factory test report; 13.8 kV buried-delta tertiary; 2021 ABB rating-plate drawing; three-phase, 60 Hz, ONAN/ONAF/ODAF cooling; Contact Tommy Marco directly for the technical package, price, and delivery arrangements; Nameplate impedance: 10.47% on a 132 MVA, 230/34.5 kV base; final configuration confirmed with the technical package | Three-phase, 60 Hz; ONAN/ONAF1/ONAF2 cooling; 65 C winding rise; Grounded-wye / grounded-wye / delta; vector group YNyn0d1; HV OLTC range 207-253 kV; 13.3 kV, 35 MVA buried-delta tertiary; Copper windings, Type II mineral oil; Nameplate drawing identifies suitability for step-up operation; final test results and impedance available subject to confirmation |
| Evidence reviewed | Manufacturer nameplate and factory test report reviewed | Nameplate drawing reviewed |
| Technical value basis | Supplied unit nameplate and historical factory photograph; current inspection and matching factory records remain necessary. | Supplied design nameplate and outline drawings; blank final values remain unconfirmed. |
| Details to confirm | Current preservation, complete factory-test reports and included accessory schedule; Overall/shipping dimensions, shipping weight, oil quantity and loading arrangements | Final tested impedance and base, manufacture year and final tap-switch specification; Final oil quantity, dimensions, tests, current preservation and complete accessories |
| Represented condition | Brand new, never used and never energized | Brand new, never used and never energized |
| Equipment location | USA | USA |
| Technical records reviewed | 2026-10-08 | 2026-10-08 |
| Availability | Available; confirmed by J&J on September 24, 2026; subject to prior sale and written confirmation | Available; subject to prior sale and written confirmation |
| Availability last confirmed | 2026-09-24 | 2026-09-24 |
| Shipping estimate | Request a written dispatch and delivery schedule | Request a written dispatch and delivery schedule |
| Nameplate reviewed | Yes — request the unit package | Yes — request the unit package |
| Drawings reviewed | Yes — request matching unit drawings | Yes — request matching unit drawings |
| Factory test report reviewed | Report reviewed; confirm matching records for each unit | Not recorded as reviewed; request test records |
| This unit only | Request more info | Request more info |
One request
Request Availability for Your Shortlist.
Email Tommy to discuss these options. The listing IDs will already be in the email subject.
What still needs to be checked?
Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.
Match the nameplate to the specification · Review surplus equipment records · Procurement checklist
