Company base: Sugar Land, Texas · Nationwide sales · Tommy Marco

346-276-9540 tommy@jjtransformers.com

Your equipment shortlist

Compare equipment before you request it.

Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.

J&J Transformers LLC · 346-276-9540 · tommy@jjtransformers.com

Published specifications for 2 alternatives. Availability remains subject to prior sale and written reconfirmation.
Compare88 MVA 230/34.5 kV WEG Power TransformerJJ-WEG-230-88New 220 MVA 230/34.5 kV ABB/Hitachi TransformerJJ-230-220-1
ManufacturerWEGABB / Hitachi
Rating / output53/70.5/88 MVA; 18.55/24.675/30.8 MVA tertiary132/176/220 MVA
Voltage / winding arrangement230/34.5 kV with 13.8 kV stabilizing delta tertiary230/34.5 kV with 13.8 kV buried-delta tertiary
Vector groupYNyn0d1YNyn0d1 — Wye–Wye / Delta
Frequency60 Hz60 Hz
CoolingONAN / ONAF1 / ONAF2ONAN / ONAF / ODAF
Impedance and baseNot documented; confirm with J&JH–X: 10.47% at 132 MVA, 230/34.5 kV
Tap changerHV OLTC; 207–253 kV (±10%); 16 raise / 16 lower steps of 0.625%HV OLTC; nameplate tap table spans 205.8–254.2 kV; confirm the selected tap and final switch schedule
Insulation / BILNot documented; confirm with J&JHV line 900 kV; HV neutral, LV and tertiary 200 kV
Quantity represented1 nameplate-documented unit1 unit
Technical details / open itemsThree-phase, 60 Hz, ONAN/ONAF1/ONAF2, vector group YNyn0d1; 230 kV grounded-wye primary, 34.5 kV grounded-wye secondary, and 13.8 kV stabilizing delta tertiary; HV LTC represented at plus/minus 10% with 16 raise and 16 lower steps; 2020 manufacture shown on the reviewed nameplate drawing132/176/220 MVA, 230 kV grounded-wye high side and 34.5 kV grounded-wye low side; YNyn0d1 connection documented in the manufacturer factory test report; 13.8 kV buried-delta tertiary; 2021 ABB rating-plate drawing; three-phase, 60 Hz, ONAN/ONAF/ODAF cooling; Contact Tommy Marco directly for the technical package, price, and delivery arrangements; Nameplate impedance: 10.47% on a 132 MVA, 230/34.5 kV base; final configuration confirmed with the technical package
Evidence reviewedSerial-specific nameplate drawing reviewedManufacturer nameplate and factory test report reviewed
Technical value basisSupplied approval nameplate drawing; the impedance field is not completed.Supplied unit nameplate and historical factory photograph; current inspection and matching factory records remain necessary.
Details to confirmFinal tested impedance/base, all winding/bushing BIL levels and oil quantity; Matching factory tests, current preservation, final dimensions and complete accessoriesCurrent preservation, complete factory-test reports and included accessory schedule; Overall/shipping dimensions, shipping weight, oil quantity and loading arrangements
Represented conditionBrand new, never used and never energized; 2020 nameplate reviewedBrand new, never used and never energized
Equipment locationUSAUSA
Technical records reviewed2026-10-082026-10-08
AvailabilityAvailable; nameplate drawing reviewed; subject to prior sale and written reconfirmationAvailable; confirmed by J&J on September 24, 2026; subject to prior sale and written confirmation
Availability last confirmed2026-09-242026-09-24
Shipping estimateRequest a written dispatch and delivery scheduleRequest a written dispatch and delivery schedule
Nameplate reviewedYes — request the unit packageYes — request the unit package
Drawings reviewedYes — request matching unit drawingsYes — request matching unit drawings
Factory test report reviewedNot recorded as reviewed; request test recordsReport reviewed; confirm matching records for each unit
This unit only Request more info Request more info

One request

Request Availability for Your Shortlist.

Email Tommy to discuss these options. The listing IDs will already be in the email subject.

Email this shortlist

What still needs to be checked?

Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.

Match the nameplate to the specification · Review surplus equipment records · Procurement checklist

Call Email Sales