Your equipment shortlist
Compare equipment before you request it.
Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.
| Compare | 7 TSEA 266 MVA 345/34.5 kV TransformersJJ-TSEA-345-266-7 | 260 MVA 345/34.5 kV Siemens TransformerJJ-TX-114 |
|---|---|---|
| Manufacturer | TSEA energia | Siemens |
| Rating / output | 160/213/266 MVA | 260 MVA |
| Voltage / winding arrangement | 345/34.5 kV with 13.8 kV no-load delta tertiary | 345/34.5 kV |
| Vector group | YNyn(d1), as stated in the design package | Winding connections and phase shift to confirm |
| Frequency | 60 Hz | Not documented; confirm with J&J |
| Cooling | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Impedance and base | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Tap changer | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Insulation / BIL | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Quantity represented | 7 units | 1 schedule entry; individual identity to confirm |
| Technical details / open items | 7 units at 266 MVA maximum; the separate 226 MVA group contains 12 units, for 19 total 345 kV units.; Cooling ratings: ONAN 160 MVA / ONAF1 213 MVA / ONAF2 266 MVA.; Design impedance: 8.5% at a 160 MVA base. HV/LV BIL: 1,175/200 kV.; Three-phase, 60 Hz; copper windings, mineral oil and 65 °C temperature rise.; HV on-load tap changer: ±10% in 0.625% steps; grounded-wye high- and low-voltage windings.; 13.8 kV delta tertiary shown as no load in the design drawings; external load duty requires OEM approval.; Possible modifications are available for engineering review. Feasibility, approved configuration, cost and delivery impact require OEM confirmation before order acceptance.; Quantities reflect the current J&J portfolio allocation. Request individual unit schedules, approved drawings, final nameplates, factory tests and the included shipping, commissioning and warranty scope with your quotation. | Ratings and manufacturer are transcribed from the J&J-submitted schedule; verify them against the matching nameplate and current technical package.; Service history, present condition, frequency, winding arrangement, impedance, tap changer and accessories require unit-specific confirmation.; Historical schedule dates do not establish current dispatch timing, manufacture year or transferable warranty. Request present release terms and any applicable warranty in writing. |
| Evidence reviewed | Reviewed TSEA design drawings and performance data; portfolio quantities updated by J&J on October 16, 2026 | J&J-submitted inventory schedule; matching unit-specific technical records to confirm |
| Technical value basis | Reviewed TSEA design drawings and offered performance data. Values describe the documented design; final unit-specific nameplates and factory test results are supplied with the approved technical package. | Submitted inventory schedule; manufacturer and electrical rating are representations, not an individual nameplate match. |
| Details to confirm | Individual unit allocation, production and delivery schedule, approved drawings and final nameplate; OEM-approved modification scope and final winding/vector configuration; Final factory test reports, included accessories, warranty and certified transport dimensions/weights | Individual identity and quantity, current photos, condition/service history and preservation; Frequency, cooling/rise, winding connections and clock, impedance/base, BIL, conductor/fluid and tap schedule; Factory/current tests, included accessories, dimensions/weights and final release/transport scope |
| Represented condition | Factory manufacturing allocation; completion pending | Condition and service history require confirmation |
| Equipment location | Dispatch location confirmed with quotation | Location confirmed with quotation |
| Technical records reviewed | 2026-10-16 | 2026-10-08 |
| Availability | Production allocation offered through J&J; subject to prior sale and written release terms | Listed for inquiry by J&J; current allocation and release timing require written confirmation |
| Availability last confirmed | Request current confirmation | Request current confirmation |
| Shipping estimate | 2027 production; delivery schedule confirmed by unit and project | Request a written dispatch and delivery schedule |
| Nameplate reviewed | Not recorded as reviewed; request it | Not recorded as reviewed; request it |
| Drawings reviewed | Yes — request matching unit drawings | Not recorded as reviewed; request them |
| Factory test report reviewed | Not recorded as reviewed; request test records | Not recorded as reviewed; request test records |
| This unit only | Request more info | Request more info |
One request
Request Availability for Your Shortlist.
Email Tommy to discuss these options. The listing IDs will already be in the email subject.
What still needs to be checked?
Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.
Match the nameplate to the specification · Review surplus equipment records · Procurement checklist