Your equipment shortlist
Compare equipment before you request it.
Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.
| Compare | 7 TSEA 266 MVA 345/34.5 kV TransformersJJ-TSEA-345-266-7 | 180 MVA 345/34.5 kV Georgia TransformerJJ-TX-003 |
|---|---|---|
| Manufacturer | TSEA energia | Georgia Transformer |
| Rating / output | 160/213/266 MVA | 108/144/180 MVA; 37.8/50.4/63 MVA tertiary |
| Voltage / winding arrangement | 345/34.5 kV with 13.8 kV no-load delta tertiary | 345/34.5 kV with 12 kV buried-delta tertiary |
| Vector group | YNyn(d1), as stated in the design package | YNyn0+d1 |
| Frequency | 60 Hz | Not documented; confirm with J&J |
| Cooling | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Impedance and base | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Tap changer | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Insulation / BIL | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Quantity represented | 7 units | 1 documented unit |
| Technical details / open items | 7 units at 266 MVA maximum; the separate 226 MVA group contains 12 units, for 19 total 345 kV units.; Cooling ratings: ONAN 160 MVA / ONAF1 213 MVA / ONAF2 266 MVA.; Design impedance: 8.5% at a 160 MVA base. HV/LV BIL: 1,175/200 kV.; Three-phase, 60 Hz; copper windings, mineral oil and 65 °C temperature rise.; HV on-load tap changer: ±10% in 0.625% steps; grounded-wye high- and low-voltage windings.; 13.8 kV delta tertiary shown as no load in the design drawings; external load duty requires OEM approval.; Possible modifications are available for engineering review. Feasibility, approved configuration, cost and delivery impact require OEM confirmation before order acceptance.; Quantities reflect the current J&J portfolio allocation. Request individual unit schedules, approved drawings, final nameplates, factory tests and the included shipping, commissioning and warranty scope with your quotation. | ONAN/ONAF1/ONAF2, 60 Hz, three-phase, vector group YNyn0+d1; Measured H-X impedance: 6.99% on a 108 MVA base; Factory test report concludes results were within technical tolerances |
| Evidence reviewed | Reviewed TSEA design drawings and performance data; portfolio quantities updated by J&J on October 16, 2026 | Serial-specific approval drawings and FAT report reviewed |
| Technical value basis | Reviewed TSEA design drawings and offered performance data. Values describe the documented design; final unit-specific nameplates and factory test results are supplied with the approved technical package. | Serial-specific approval drawings and FAT report reviewed |
| Details to confirm | Individual unit allocation, production and delivery schedule, approved drawings and final nameplate; OEM-approved modification scope and final winding/vector configuration; Final factory test reports, included accessories, warranty and certified transport dimensions/weights | Matching technical records, current condition, complete equipment scope and transport details |
| Represented condition | Factory manufacturing allocation; completion pending | Brand new, never used and never energized; factory acceptance tested September 2024 |
| Equipment location | Dispatch location confirmed with quotation | USA |
| Technical records reviewed | 2026-10-16 | 2026-10-08 |
| Availability | Production allocation offered through J&J; subject to prior sale and written release terms | Available for sale — confirmed by J&J October 8, 2026; quotation and release terms on request |
| Availability last confirmed | Request current confirmation | 2026-10-08 |
| Shipping estimate | 2027 production; delivery schedule confirmed by unit and project | Request a written dispatch and delivery schedule |
| Nameplate reviewed | Not recorded as reviewed; request it | Not recorded as reviewed; request it |
| Drawings reviewed | Yes — request matching unit drawings | Yes — request matching unit drawings |
| Factory test report reviewed | Not recorded as reviewed; request test records | Report reviewed; confirm matching records for each unit |
| This unit only | Request more info | Request more info |
One request
Request Availability for Your Shortlist.
Email Tommy to discuss these options. The listing IDs will already be in the email subject.
What still needs to be checked?
Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.
Match the nameplate to the specification · Review surplus equipment records · Procurement checklist
