Your equipment shortlist
Compare equipment before you request it.
Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.
| Compare | 71.2 MVA Prolec GE 240/120-13.8 kV GSUJJ-PGE-240-71 | 300 MVA 138/34.5 kV Georgia TransformerJJ-TX-001 |
|---|---|---|
| Manufacturer | Prolec GE | Georgia Transformer |
| Rating / output | 42.7/57/71.2 MVA at 60 Hz | 180/240/300 MVA; 63/84/105 MVA tertiary |
| Voltage / winding arrangement | 240/120 kV grounded-wye dual-voltage to 13.8 kV delta | 138/34.5 kV with 12 kV buried-delta tertiary |
| Vector group | Grounded Wye–Delta; clock to confirm | YNyn0+d1 |
| Frequency | 60 Hz | Not documented; confirm with J&J |
| Cooling | ONAN / ONAF / ONAF | Not documented; confirm with J&J |
| Impedance and base | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Tap changer | Dual-voltage HV DETC; confirm series/parallel reconnection and the complete 11-position tap table | Not documented; confirm with J&J |
| Insulation / BIL | HV winding: 900 kV series / 650 kV parallel; HV bushings 900 kV; LV 110 kV; HV neutral 250 kV | Not documented; confirm with J&J |
| Quantity represented | 1 documented unit | 1 documented unit |
| Technical details / open items | Generator step-up transformer; three-phase, 60 Hz, ONAN/ONAF/ONAF; Dual-voltage grounded-wye high side rated 240 or 120 kV with 13.8 kV delta low side; De-energized tap changer, copper windings, mineral oil, and suitable-for-step-up designation; Manufacture date is not completed on the reviewed drawing; 2012 is the drawing-approval date, not a claimed build year | ONAN/ONAF/ONAF, 60 Hz, three-phase, vector group YNyn0+d1; Measured 138/34.5 kV impedance: 9.67% on a 180 MVA base; Copper windings, conservator system, Type II mineral oil, and HV OLTC |
| Evidence reviewed | Serial-specific approval nameplate drawing reviewed | Serial-specific nameplate reviewed |
| Technical value basis | Supplied approval nameplate drawing; its approval date is not a manufacture date. | Serial-specific nameplate reviewed |
| Details to confirm | Final manufacture year, tested impedance/base and selected voltage/tap connection; Current preservation, final oil quantity, dimensions, shipping weight and accessory scope | Matching technical records, current condition, complete equipment scope and transport details |
| Represented condition | Brand new, never used and never energized | Brand new, never used and never energized; 2020 nameplate reviewed |
| Equipment location | USA | USA |
| Technical records reviewed | 2026-10-08 | 2026-10-08 |
| Availability | Available; approval nameplate drawing reviewed; subject to prior sale and written reconfirmation | Available for sale — confirmed by J&J October 8, 2026; quotation and release terms on request |
| Availability last confirmed | 2026-09-24 | 2026-10-08 |
| Shipping estimate | Request a written dispatch and delivery schedule | Request a written dispatch and delivery schedule |
| Nameplate reviewed | Yes — request the unit package | Yes — request the unit package |
| Drawings reviewed | Yes — request matching unit drawings | Not recorded as reviewed; request them |
| Factory test report reviewed | Not recorded as reviewed; request test records | Not recorded as reviewed; request test records |
| This unit only | Request more info | Request more info |
One request
Request Availability for Your Shortlist.
Email Tommy to discuss these options. The listing IDs will already be in the email subject.
What still needs to be checked?
Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.
Match the nameplate to the specification · Review surplus equipment records · Procurement checklist