Your equipment shortlist
Compare equipment before you request it.
Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.
| Compare | 71.2 MVA Prolec GE 240/120-13.8 kV GSUJJ-PGE-240-71 | Royal SMIT 525/69 kV Transformers — 3 AvailableJJ-SMIT-525-3 |
|---|---|---|
| Manufacturer | Prolec GE | Royal SMIT |
| Rating / output | 42.7/57/71.2 MVA at 60 Hz | 240/320/400 MVA; 250 MVA maximum step-down; 90 MVA tertiary |
| Voltage / winding arrangement | 240/120 kV grounded-wye dual-voltage to 13.8 kV delta | 525/69 kV with 13.7 kV buried-delta tertiary |
| Vector group | Grounded Wye–Delta; clock to confirm | YNyn0(d1) — Wye–Wye / buried Delta |
| Frequency | 60 Hz | 60 Hz |
| Cooling | ONAN / ONAF / ONAF | ONAN / ONAF / ONAF |
| Impedance and base | Not documented; confirm with J&J | H–X: 12.90% at 240 MVA, 525/69 kV, 85°C |
| Tap changer | Dual-voltage HV DETC; confirm series/parallel reconnection and the complete 11-position tap table | HV OLTC; 472.5–577.5 kV (±10%); 16 raise / 16 lower steps of 0.625% |
| Insulation / BIL | HV winding: 900 kV series / 650 kV parallel; HV bushings 900 kV; LV 110 kV; HV neutral 250 kV | HV winding 1550 kV / bushing 1675 kV; LV 350 kV; tertiary 150 kV |
| Quantity represented | 1 documented unit | 3 units |
| Technical details / open items | Generator step-up transformer; three-phase, 60 Hz, ONAN/ONAF/ONAF; Dual-voltage grounded-wye high side rated 240 or 120 kV with 13.8 kV delta low side; De-energized tap changer, copper windings, mineral oil, and suitable-for-step-up designation; Manufacture date is not completed on the reviewed drawing; 2012 is the drawing-approval date, not a claimed build year | Three units offered for allocation; availability and 4–8 week shipping schedule confirmed by J&J on October 1, 2026.; Nameplate rating: 240/320/400 MVA with ONAN/ONAF/ONAF cooling. Maximum stated duty: 400 MVA step-up or 250 MVA step-down.; Three-phase, 60 Hz; 525 kV grounded-wye high side, 69 kV wye low side, and 13.7 kV buried-delta tertiary rated 90 MVA.; Copper windings; MR on-load tap changer; HV tap range 472.5–577.5 kV (±10%).; HV BIL: 1550 kV winding / 1675 kV bushing. LV BIL: 350 kV.; Nameplate H-X impedance: 12.90% at 240 MVA base, 525/69 kV, 85°C.; Supplied 2022 factory acceptance test report records Passed for the documented unit. Nameplate, outline drawing and test report available through J&J; match the records to all three units before purchase. |
| Evidence reviewed | Serial-specific approval nameplate drawing reviewed | Supplied nameplate, outline drawing and factory acceptance test report |
| Technical value basis | Supplied approval nameplate drawing; its approval date is not a manufacture date. | Supplied nameplate for one documented unit; match the complete package to each of the three offered units. |
| Details to confirm | Final manufacture year, tested impedance/base and selected voltage/tap connection; Current preservation, final oil quantity, dimensions, shipping weight and accessory scope | Matching records for each offered unit, current condition, included accessories and transport scope; Unit-specific factory tests, present preservation and the step-down duty limit |
| Represented condition | Brand new, never used and never energized | 2022 manufacture shown in supplied nameplate; condition and service history confirmed with quotation |
| Equipment location | USA | International; dispatch location confirmed with quotation |
| Technical records reviewed | 2026-10-08 | 2026-10-08 |
| Availability | Available; approval nameplate drawing reviewed; subject to prior sale and written reconfirmation | Immediately available; estimated 4–8 weeks to ship; subject to prior sale |
| Availability last confirmed | 2026-09-24 | 2026-10-01 |
| Shipping estimate | Request a written dispatch and delivery schedule | 4–8 weeks to ship |
| Nameplate reviewed | Yes — request the unit package | Yes — request the unit package |
| Drawings reviewed | Yes — request matching unit drawings | Yes — request matching unit drawings |
| Factory test report reviewed | Not recorded as reviewed; request test records | Report reviewed; confirm matching records for each unit |
| This unit only | Request more info | Request more info |
One request
Request Availability for Your Shortlist.
Email Tommy to discuss these options. The listing IDs will already be in the email subject.
What still needs to be checked?
Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.
Match the nameplate to the specification · Review surplus equipment records · Procurement checklist
