Your equipment shortlist
Compare equipment before you request it.
Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.
| Compare | 112 MVA-Class ABB 230/115/69 kV AutotransformerJJ-ABB-AUTO-112 | 3 Rebuilt ABB 59.7 MVA-Class 230/13.8 kV TransformersJJ-ABB-230-13-3 |
|---|---|---|
| Manufacturer | ABB | ABB |
| Rating / output | 60/80/100 MVA at 55 C; 67.2/89.6/112 MVA at 65 C | 40/53.3 MVA at 55 C; 44.8/59.7 MVA at 65 C |
| Voltage / winding arrangement | 230 kV to reconnectable 115 or 69 kV with 13.5 kV delta tertiary | 230 kV delta / 13.8 kV grounded wye |
| Vector group | Wye autotransformer / Delta tertiary; clock to confirm | Delta–Grounded Wye; clock to confirm |
| Frequency | 60 Hz | 60 Hz |
| Cooling | OA / FA1 / FA2 | OA / FA / FA |
| Impedance and base | 13.2% at 60 MVA, 230/69 kV; 7.4% at 60 MVA, 230/115 kV | 9.99% represented; MVA base not established |
| Tap changer | Not documented; confirm with J&J | Five-position HV DETC represented at 241.5, 235.75, 230, 224.25 and 218.5 kV |
| Insulation / BIL | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Quantity represented | 1 nameplate-documented opportunity; available quantity to confirm | 3 represented units |
| Technical details / open items | Three-phase, 60 Hz, copper-wound ABB autotransformer; Reconnectable common winding for 69 kV or 115 kV service; 13.5 kV delta tertiary; Nameplate impedance: 13.2% on a 60 MVA, 230/69 kV base; 7.4% on a 60 MVA, 230/115 kV base; Complete matching nameplate records and the technical package are shared through J&J | 1989 manufacture represented; three-phase, 60 Hz, copper windings; OA/FA/FA cooling, 55/65 C rise, and 9.99% represented impedance; HV taps represented at 241.5, 235.75, 230, 224.25, and 218.5 kV; Supplied equipment photo shown; request matching records, rebuild scope, tests and included accessories for all three units through J&J |
| Evidence reviewed | Serial-specific nameplate photograph reviewed | Seller specification sheet and equipment photo reviewed |
| Technical value basis | Supplied individual nameplate photograph; reconnection and tap arrangements require engineering review. | Seller specification and equipment photograph; confirm all three individual nameplates and rebuild records. |
| Details to confirm | Selected voltage reconnection, tertiary rating, insulation levels and current quantity; Complete tests, current preservation, accessory scope and transport dimensions/weights | All three matching nameplates, impedance bases, BIL and detailed rebuild scopes; Current inspection, tests, accessory completeness and individual transport dimensions/weights |
| Represented condition | Brand new, never used and never energized | Rebuilt; three ABB 230/13.8 kV transformers. Rebuild scope and included accessories are confirmed with the quotation |
| Equipment location | USA | USA |
| Technical records reviewed | 2026-10-08 | 2026-10-08 |
| Availability | Available; nameplate reviewed; quantity and delivery terms confirmed with the quotation; subject to prior sale | Available; specification sheet reviewed; subject to prior sale and written reconfirmation |
| Availability last confirmed | 2026-09-24 | 2026-09-24 |
| Shipping estimate | Request a written dispatch and delivery schedule | Request a written dispatch and delivery schedule |
| Nameplate reviewed | Yes — request the unit package | Not recorded as reviewed; request it |
| Drawings reviewed | Not recorded as reviewed; request them | Not recorded as reviewed; request them |
| Factory test report reviewed | Not recorded as reviewed; request test records | Not recorded as reviewed; request test records |
| This unit only | Request more info | Request more info |
One request
Request Availability for Your Shortlist.
Email Tommy to discuss these options. The listing IDs will already be in the email subject.
What still needs to be checked?
Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.
Match the nameplate to the specification · Review surplus equipment records · Procurement checklist
