Your equipment shortlist
Compare equipment before you request it.
Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.
| Compare | 112 MVA-Class ABB 230/115/69 kV AutotransformerJJ-ABB-AUTO-112 | New 220 MVA 230/34.5 kV ABB/Hitachi TransformerJJ-230-220-1 |
|---|---|---|
| Manufacturer | ABB | ABB / Hitachi |
| Rating / output | 60/80/100 MVA at 55 C; 67.2/89.6/112 MVA at 65 C | 132/176/220 MVA |
| Voltage / winding arrangement | 230 kV to reconnectable 115 or 69 kV with 13.5 kV delta tertiary | 230/34.5 kV with 13.8 kV buried-delta tertiary |
| Vector group | Wye autotransformer / Delta tertiary; clock to confirm | YNyn0d1 — Wye–Wye / Delta |
| Frequency | 60 Hz | 60 Hz |
| Cooling | OA / FA1 / FA2 | ONAN / ONAF / ODAF |
| Impedance and base | 13.2% at 60 MVA, 230/69 kV; 7.4% at 60 MVA, 230/115 kV | H–X: 10.47% at 132 MVA, 230/34.5 kV |
| Tap changer | Not documented; confirm with J&J | HV OLTC; nameplate tap table spans 205.8–254.2 kV; confirm the selected tap and final switch schedule |
| Insulation / BIL | Not documented; confirm with J&J | HV line 900 kV; HV neutral, LV and tertiary 200 kV |
| Quantity represented | 1 nameplate-documented opportunity; available quantity to confirm | 1 unit |
| Technical details / open items | Three-phase, 60 Hz, copper-wound ABB autotransformer; Reconnectable common winding for 69 kV or 115 kV service; 13.5 kV delta tertiary; Nameplate impedance: 13.2% on a 60 MVA, 230/69 kV base; 7.4% on a 60 MVA, 230/115 kV base; Complete matching nameplate records and the technical package are shared through J&J | 132/176/220 MVA, 230 kV grounded-wye high side and 34.5 kV grounded-wye low side; YNyn0d1 connection documented in the manufacturer factory test report; 13.8 kV buried-delta tertiary; 2021 ABB rating-plate drawing; three-phase, 60 Hz, ONAN/ONAF/ODAF cooling; Contact Tommy Marco directly for the technical package, price, and delivery arrangements; Nameplate impedance: 10.47% on a 132 MVA, 230/34.5 kV base; final configuration confirmed with the technical package |
| Evidence reviewed | Serial-specific nameplate photograph reviewed | Manufacturer nameplate and factory test report reviewed |
| Technical value basis | Supplied individual nameplate photograph; reconnection and tap arrangements require engineering review. | Supplied unit nameplate and historical factory photograph; current inspection and matching factory records remain necessary. |
| Details to confirm | Selected voltage reconnection, tertiary rating, insulation levels and current quantity; Complete tests, current preservation, accessory scope and transport dimensions/weights | Current preservation, complete factory-test reports and included accessory schedule; Overall/shipping dimensions, shipping weight, oil quantity and loading arrangements |
| Represented condition | Brand new, never used and never energized | Brand new, never used and never energized |
| Equipment location | USA | USA |
| Technical records reviewed | 2026-10-08 | 2026-10-08 |
| Availability | Available; nameplate reviewed; quantity and delivery terms confirmed with the quotation; subject to prior sale | Available; confirmed by J&J on September 24, 2026; subject to prior sale and written confirmation |
| Availability last confirmed | 2026-09-24 | 2026-09-24 |
| Shipping estimate | Request a written dispatch and delivery schedule | Request a written dispatch and delivery schedule |
| Nameplate reviewed | Yes — request the unit package | Yes — request the unit package |
| Drawings reviewed | Not recorded as reviewed; request them | Yes — request matching unit drawings |
| Factory test report reviewed | Not recorded as reviewed; request test records | Report reviewed; confirm matching records for each unit |
| This unit only | Request more info | Request more info |
One request
Request Availability for Your Shortlist.
Email Tommy to discuss these options. The listing IDs will already be in the email subject.
What still needs to be checked?
Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.
Match the nameplate to the specification · Review surplus equipment records · Procurement checklist
