Company base: Sugar Land, Texas · Nationwide sales · Tommy Marco

346-276-9540 tommy@jjtransformers.com

Your equipment shortlist

Compare equipment before you request it.

Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.

J&J Transformers LLC · 346-276-9540 · tommy@jjtransformers.com

Published specifications for 2 alternatives. Availability remains subject to prior sale and written reconfirmation.
CompareNew 220 MVA 230/34.5 kV ABB/Hitachi TransformerJJ-230-220-188 MVA 230/34.5 kV WEG Power TransformerJJ-WEG-230-88
ManufacturerABB / HitachiWEG
Rating / output132/176/220 MVA53/70.5/88 MVA; 18.55/24.675/30.8 MVA tertiary
Voltage / winding arrangement230/34.5 kV with 13.8 kV buried-delta tertiary230/34.5 kV with 13.8 kV stabilizing delta tertiary
Vector groupYNyn0d1 — Wye–Wye / DeltaYNyn0d1
Frequency60 Hz60 Hz
CoolingONAN / ONAF / ODAFONAN / ONAF1 / ONAF2
Impedance and baseH–X: 10.47% at 132 MVA, 230/34.5 kVNot documented; confirm with J&J
Tap changerHV OLTC; nameplate tap table spans 205.8–254.2 kV; confirm the selected tap and final switch scheduleHV OLTC; 207–253 kV (±10%); 16 raise / 16 lower steps of 0.625%
Insulation / BILHV line 900 kV; HV neutral, LV and tertiary 200 kVNot documented; confirm with J&J
Quantity represented1 unit1 nameplate-documented unit
Technical details / open items132/176/220 MVA, 230 kV grounded-wye high side and 34.5 kV grounded-wye low side; YNyn0d1 connection documented in the manufacturer factory test report; 13.8 kV buried-delta tertiary; 2021 ABB rating-plate drawing; three-phase, 60 Hz, ONAN/ONAF/ODAF cooling; Contact Tommy Marco directly for the technical package, price, and delivery arrangements; Nameplate impedance: 10.47% on a 132 MVA, 230/34.5 kV base; final configuration confirmed with the technical packageThree-phase, 60 Hz, ONAN/ONAF1/ONAF2, vector group YNyn0d1; 230 kV grounded-wye primary, 34.5 kV grounded-wye secondary, and 13.8 kV stabilizing delta tertiary; HV LTC represented at plus/minus 10% with 16 raise and 16 lower steps; 2020 manufacture shown on the reviewed nameplate drawing
Evidence reviewedManufacturer nameplate and factory test report reviewedSerial-specific nameplate drawing reviewed
Technical value basisSupplied unit nameplate and historical factory photograph; current inspection and matching factory records remain necessary.Supplied approval nameplate drawing; the impedance field is not completed.
Details to confirmCurrent preservation, complete factory-test reports and included accessory schedule; Overall/shipping dimensions, shipping weight, oil quantity and loading arrangementsFinal tested impedance/base, all winding/bushing BIL levels and oil quantity; Matching factory tests, current preservation, final dimensions and complete accessories
Represented conditionBrand new, never used and never energizedBrand new, never used and never energized; 2020 nameplate reviewed
Equipment locationUSAUSA
Technical records reviewed2026-10-082026-10-08
AvailabilityAvailable; confirmed by J&J on September 24, 2026; subject to prior sale and written confirmationAvailable; nameplate drawing reviewed; subject to prior sale and written reconfirmation
Availability last confirmed2026-09-242026-09-24
Shipping estimateRequest a written dispatch and delivery scheduleRequest a written dispatch and delivery schedule
Nameplate reviewedYes — request the unit packageYes — request the unit package
Drawings reviewedYes — request matching unit drawingsYes — request matching unit drawings
Factory test report reviewedReport reviewed; confirm matching records for each unitNot recorded as reviewed; request test records
This unit only Request more info Request more info

One request

Request Availability for Your Shortlist.

Email Tommy to discuss these options. The listing IDs will already be in the email subject.

Email this shortlist

What still needs to be checked?

Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.

Match the nameplate to the specification · Review surplus equipment records · Procurement checklist

Call Email Sales