Company base: Sugar Land, Texas · Nationwide sales · Tommy Marco

346-276-9540 tommy@jjtransformers.com

Turbine opportunity · JJ-TUR-SGT800-2

Two Siemens SGT-800 49.9 MW Gas Turbines - China

Equipment location: China. J&J is based in Sugar Land, Texas and serves projects nationwide.

Condition: Erected, never operated / never fired; built 2024. Two Siemens SGT-800 gas turbines in China, built in 2024, erected and never fired. Rated 49.9 MW gross simple-cycle output each, approximately 100 MW combined. Available within one month of purchase. Email Tommy with reference JJ-TUR-SGT800-2 for specifications, price and current release timing. Listing information reviewed .

Availability & record date
Availability confirmedConfirmed by J&J Available within one month of purchase; transport, re-erection and commissioning schedule agreed separatelyRequest current allocation and release terms · subject to prior sale

Equipment summary

Specifications and scope

Unit IDJJ-TUR-SGT800-2
ManufacturerSiemens Energy
Manufacturer basisSupplied two-unit SGT-800 offer; one-month availability updated by J&J October 23, 2026
Rating49.9 MW gross simple-cycle per unit; approximately 100 MW combined
Voltage / outputGenerator voltage and final generator/gearbox configuration specified with order
Frequency50 or 60 Hz; generator and gearbox configuration specified with order
FuelNatural gas; light fuel oil backup per supplied specification
Manufacture / history dates2024
Operating historyNever fired per supplied offer
Included package scopeTurbine core, inlet and exhaust sections, lube oil/fuel/cooling/starting/hydraulic systems, valves and actuators, controls hardware and dismantling/packing; final generator and gearbox per order
Received offer date
Quantity2 units
ShippingAvailable within one month of purchase; transport, re-erection and commissioning schedule agreed separately
AvailabilityTwo units available within one month of purchase; subject to prior sale and written allocation
Condition basisErected, never operated / never fired; built 2024
Current locationChina
Listing information reviewed

Technical values and record basis

Supplied two-unit SGT-800 offer; one-month availability updated by J&J October 23, 2026

The reviewed offer does not establish additional unit-specific technical values. Request the matching nameplate and complete technical package through J&J.

Details to confirm for this listing

  • Matching technical records, current condition, complete equipment scope and transport details

Technical highlights

  • Two Siemens SGT-800 units, built in 2024, erected in China and never operated / never fired.
  • 49.9 MW gross simple-cycle output per unit; approximately 100 MW combined. Actual project output depends on the final configuration and site conditions.
  • Available within one month of purchase, per J&J's current offer. Confirm equipment release, dismantling, transport and arrival milestones in the written agreement.
  • 50 or 60 Hz configurations; final gearbox ratio and generator specified with the order. Units are not yet grid-connected.
  • Natural gas with light fuel oil backup, 30 dry-low-emission dual-fuel burners, 15-stage axial compressor and three-stage axial turbine per supplied specification.
  • Offered scope includes the turbine core, inlet duct and exhaust section, auxiliary systems, valves, control cabinet, sensors and instruments, dismantling and packing. Final generator and gearbox scope per order.
  • HRSG and steam turbine are excluded. Approximately 100 MW total refers to the two simple-cycle units; combined-cycle potential is not included installed capacity.
  • Contact J&J for pricing, technical documentation and inspection. Buyer-site civil works, foundations, grid connection, permits, fuel supply and re-erection/commissioning require an agreed separate scope.

Evidence reviewed

Supplied two-unit SGT-800 offer; one-month availability updated by J&J October 23, 2026

Records apply only to the stated unit or design basis.

Availability and terms

Two units available within one month of purchase; subject to prior sale and written allocation

Ask for the current technical package, price, included accessories and delivery terms.

Confirm the purchase and delivery scope

Ask J&J to confirm the proposed unit’s allocation, price, inspection access, included accessories, loading and freight boundary, receiving arrangements, release schedule, deposit or reservation terms and any applicable warranty. Photos, matching records and inspection arrangements are coordinated through J&J.

Request written terms

Check this package against your project

Compare electrical output, duty, frequency, fuel, site conditions, operating history and included equipment. Request matching nameplates, maintenance/overhaul records and test reports for the specific package.

How is availability confirmed for this package?

Two units available within one month of purchase; subject to prior sale and written allocation. The received offer date and record review are not a current reservation. Ask J&J for written allocation, price and release timing.

What equipment is included?

Turbine core, inlet and exhaust sections, lube oil/fuel/cooling/starting/hydraulic systems, valves and actuators, controls hardware and dismantling/packing; final generator and gearbox per order. Confirm the complete equipment schedule, accessories, controls, loading, dismantling where applicable and shipment scope in the quotation.

How do I request the technical package?

Email tommy@jjtransformers.com with reference JJ-TUR-SGT800-2, required MW, voltage, frequency, fuel, quantity and needed-on-site date, or call 346-276-9540.

Compare related equipment

Review gas and steam turbines

Need a different unit?

Send the exact requirement.

Include MVA or MW, voltage, quantity, site, and need-by date for a private match.

Email for Availability
Call Email Sales