Equipment summary
Specifications and scope
| Unit ID | JJ-TUR-SGT800-2 |
|---|---|
| Manufacturer | Siemens Energy |
| Manufacturer basis | Supplied two-unit SGT-800 offer; one-month availability updated by J&J October 23, 2026 |
| Rating | 49.9 MW gross simple-cycle per unit; approximately 100 MW combined |
| Voltage / output | Generator voltage and final generator/gearbox configuration specified with order |
| Frequency | 50 or 60 Hz; generator and gearbox configuration specified with order |
| Fuel | Natural gas; light fuel oil backup per supplied specification |
| Manufacture / history dates | 2024 |
| Operating history | Never fired per supplied offer |
| Included package scope | Turbine core, inlet and exhaust sections, lube oil/fuel/cooling/starting/hydraulic systems, valves and actuators, controls hardware and dismantling/packing; final generator and gearbox per order |
| Received offer date | |
| Quantity | 2 units |
| Shipping | Available within one month of purchase; transport, re-erection and commissioning schedule agreed separately |
| Availability | Two units available within one month of purchase; subject to prior sale and written allocation |
| Condition basis | Erected, never operated / never fired; built 2024 |
| Current location | China |
| Listing information reviewed |
Technical values and record basis
Supplied two-unit SGT-800 offer; one-month availability updated by J&J October 23, 2026
The reviewed offer does not establish additional unit-specific technical values. Request the matching nameplate and complete technical package through J&J.
Details to confirm for this listing
- Matching technical records, current condition, complete equipment scope and transport details
Technical highlights
- Two Siemens SGT-800 units, built in 2024, erected in China and never operated / never fired.
- 49.9 MW gross simple-cycle output per unit; approximately 100 MW combined. Actual project output depends on the final configuration and site conditions.
- Available within one month of purchase, per J&J's current offer. Confirm equipment release, dismantling, transport and arrival milestones in the written agreement.
- 50 or 60 Hz configurations; final gearbox ratio and generator specified with the order. Units are not yet grid-connected.
- Natural gas with light fuel oil backup, 30 dry-low-emission dual-fuel burners, 15-stage axial compressor and three-stage axial turbine per supplied specification.
- Offered scope includes the turbine core, inlet duct and exhaust section, auxiliary systems, valves, control cabinet, sensors and instruments, dismantling and packing. Final generator and gearbox scope per order.
- HRSG and steam turbine are excluded. Approximately 100 MW total refers to the two simple-cycle units; combined-cycle potential is not included installed capacity.
- Contact J&J for pricing, technical documentation and inspection. Buyer-site civil works, foundations, grid connection, permits, fuel supply and re-erection/commissioning require an agreed separate scope.
Evidence reviewed
Supplied two-unit SGT-800 offer; one-month availability updated by J&J October 23, 2026
Records apply only to the stated unit or design basis.
Availability and terms
Two units available within one month of purchase; subject to prior sale and written allocation
Ask for the current technical package, price, included accessories and delivery terms.
Confirm the purchase and delivery scope
Ask J&J to confirm the proposed unit’s allocation, price, inspection access, included accessories, loading and freight boundary, receiving arrangements, release schedule, deposit or reservation terms and any applicable warranty. Photos, matching records and inspection arrangements are coordinated through J&J.
Request written termsCheck this package against your project
Compare electrical output, duty, frequency, fuel, site conditions, operating history and included equipment. Request matching nameplates, maintenance/overhaul records and test reports for the specific package.
- Match the generator, GSU transformer and circuit breaker
- Review 50 Hz and 60 Hz package compatibility
- Compare generator step-up transformer requirements
How is availability confirmed for this package?
Two units available within one month of purchase; subject to prior sale and written allocation. The received offer date and record review are not a current reservation. Ask J&J for written allocation, price and release timing.
What equipment is included?
Turbine core, inlet and exhaust sections, lube oil/fuel/cooling/starting/hydraulic systems, valves and actuators, controls hardware and dismantling/packing; final generator and gearbox per order. Confirm the complete equipment schedule, accessories, controls, loading, dismantling where applicable and shipment scope in the quotation.
How do I request the technical package?
Email tommy@jjtransformers.com with reference JJ-TUR-SGT800-2, required MW, voltage, frequency, fuel, quantity and needed-on-site date, or call 346-276-9540.

