Your equipment shortlist
Compare equipment before you request it.
Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.
| Compare | 65 MVA 138/13.8 kV Reconditioned GSUJJ-TX-209 | 120 MVA 138/34.5 kV Georgia Solar GSUJJ-TX-004 |
|---|---|---|
| Manufacturer | ABB | Georgia Transformer |
| Rating / output | 39/52/65 MVA at 65°C rise | 72/96/120 MVA; 25.2/33.6/42 MVA tertiary |
| Voltage / winding arrangement | 138 kV grounded wye / 13.8 kV delta | 138/34.5 kV with 12 kV buried-delta tertiary |
| Vector group | Grounded wye / delta; clock to confirm | YNyn0+d1 |
| Frequency | 60 Hz | 60 Hz |
| Cooling | ONAN / ONAF / ONAF; legacy OA / FA / FA in cutsheets | ONAN / ONAF1 / ONAF2 |
| Impedance and base | 9.51% at 39 MVA shown on replacement nameplate; not a new field impedance test | Measured H–X: 6.93% at 72 MVA; design value 7.2% |
| Tap changer | Five-position de-energized HV tap changer: 144.9, 141.45, 138, 134.55, 131.1 kV (±2 × 2.5%, ±5%) | HV OLTC; 117.3–158.7 kV (±15%); confirm the final switch and step schedule |
| Insulation / BIL | HV winding 550 kV / bushing 650 kV; LV winding 110 kV / bushings 150 kV; HV neutral bushing 150 kV | HV line 650 kV; HV neutral, LV line and LV neutral 200 kV |
| Quantity represented | One unit; current allocation subject to written confirmation | 1 documented unit |
| Technical details / open items | ABB is identified by the supplied replacement nameplate and historical refurbishment/testing report; confirm the original OEM plate and provenance.; Design/nameplate basis: ONAN/ONAF/ONAF, 60 Hz, 65C; Grounded wye / delta.; Tap changer: Five-position de-energized HV tap changer (144.9, 141.45, 138, 134.55, 131.1 kV; +/-2 x 2.5%).; Impedance: 9.51% at 39 MVA as shown in the supplied nameplate drawing; final test values to compare; BIL: HV winding 550 kV; LV winding 110 kV.; 2022 refurbishment and electrical-test report plus supplied nameplate drawing; no pre-refurbishment test records represented.; The supplied nameplate drawing states 138/13.8 kV; a voltage field in the 2022 test report states 115/13.8 kV. Obtain reconciliation and a matching current test package before technical acceptance.; Exterior photographs shown are from the 2022 refurbishment report. Request current dated photographs and inspect present condition through J&J.; Seller reports minimal previous service. J&J confirms it has not been installed since the 2022 refurbishment and has been maintained in storage. Earlier operating records are unavailable.; Documented exterior and cabinet cleaning/painting, bushings and LV bus bars, spare gaskets and bushing hardware; electrical testing included turns ratio, winding resistance, insulation resistance, power factor, excitation current and SFRA.; Inspection can be arranged with a 10% deposit, refundable only if the unit fails the buyer's tests or does not match the advertised specifications and condition. Confirm exact terms in the written offer. | Solar GSU design; ONAN/ONAF1/ONAF2, 60 Hz, three-phase; Vector group YNyn0+d1 with HV OLTC and conservator oil system; Nameplate rating is used; an outline-drawing discrepancy requires final seller confirmation |
| Evidence reviewed | ABB identified by the supplied replacement nameplate and historical refurbishment/test report; original OEM provenance to confirm | Serial-specific nameplate and approval drawings reviewed |
| Technical value basis | Supplied 2022 replacement nameplate and historical refurbishment/test report; current inspection is still required. | Supplied unit nameplate; the nameplate takes precedence over the differing outline-drawing rating. |
| Details to confirm | Confirm the original OEM plate and vector clock; reconcile inconsistent voltage text in the historical test templates; Current inspection and oil analysis, complete earlier service history, accessories and final handling/shipping dimensions | Resolve the outline-drawing rating discrepancy and confirm the final drawing revision; Current preservation, complete tests, dimensions and included accessory schedule |
| Represented condition | Reconditioned used transformer; refurbishment completed in 2022 | Brand new, never used and never energized; approval drawings reviewed |
| Equipment location | Location confirmed with quotation | USA |
| Technical records reviewed | 2026-10-08 | 2026-10-08 |
| Availability | Offered by J&J; seller indicated 6-8 weeks for preparation/delivery on October 1, 2026. Current inspection, loading and delivery schedule by written confirmation. | Available; engineering package reviewed; subject to prior sale and written reconfirmation |
| Availability last confirmed | Request current confirmation | 2026-09-24 |
| Shipping estimate | 6–8 weeks quoted October 1, 2026; current preparation, loading and delivery schedule to confirm | Request a written dispatch and delivery schedule |
| Nameplate reviewed | Yes — request the unit package | Yes — request the unit package |
| Drawings reviewed | Not recorded as reviewed; request them | Yes — request matching unit drawings |
| Factory test report reviewed | Not recorded as reviewed; request test records | Not recorded as reviewed; request test records |
| This unit only | Email for specs & price | Email for specs & price |
One request
Request Availability for Your Shortlist.
Email Tommy to discuss these options. The listing IDs will already be in the email subject.
What still needs to be checked?
Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.
Match the nameplate to the specification · Review surplus equipment records · Procurement checklist