Company base: Sugar Land, Texas · Nationwide sales · Tommy Marco

346-276-9540 tommy@jjtransformers.com

Your equipment shortlist

Compare equipment before you request it.

Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.

J&J Transformers LLC · 346-276-9540 · tommy@jjtransformers.com

Published specifications for 2 alternatives. Availability remains subject to prior sale and written reconfirmation.
Compare65 MVA 138/13.8 kV Reconditioned GSUJJ-TX-209Five 110 MVA 138/34.5 kV Kolektor ETRA GSUsJJ-138-110-5
ManufacturerABBKolektor ETRA
Rating / output39/52/65 MVA at 65°C rise66/88/110 MVA; 22/29.333/36.666 MVA tertiary
Voltage / winding arrangement138 kV grounded wye / 13.8 kV delta138/34.5 kV with 13.8 kV tertiary
Vector groupGrounded wye / delta; clock to confirmYNyn0+d11
Frequency60 Hz60 Hz
CoolingONAN / ONAF / ONAF; legacy OA / FA / FA in cutsheetsONAN / ONAF1 / ONAF2
Impedance and base9.51% at 39 MVA shown on replacement nameplate; not a new field impedance testReviewed nameplate H–X: 8.09% at 66 MVA; supplied FAT reports 13.41% at 110 MVA. Match the test and plate to the selected unit.
Tap changerFive-position de-energized HV tap changer: 144.9, 141.45, 138, 134.55, 131.1 kV (±2 × 2.5%, ±5%)HV OLTC; 124.2–151.8 kV (±10%); 16 raise / 16 lower steps of 0.625% on the reviewed plate
Insulation / BILHV winding 550 kV / bushing 650 kV; LV winding 110 kV / bushings 150 kV; HV neutral bushing 150 kVNot documented; confirm with J&J
Quantity representedOne unit; current allocation subject to written confirmation5 units; matching unit packages available on request
Technical details / open itemsABB is identified by the supplied replacement nameplate and historical refurbishment/testing report; confirm the original OEM plate and provenance.; Design/nameplate basis: ONAN/ONAF/ONAF, 60 Hz, 65C; Grounded wye / delta.; Tap changer: Five-position de-energized HV tap changer (144.9, 141.45, 138, 134.55, 131.1 kV; +/-2 x 2.5%).; Impedance: 9.51% at 39 MVA as shown in the supplied nameplate drawing; final test values to compare; BIL: HV winding 550 kV; LV winding 110 kV.; 2022 refurbishment and electrical-test report plus supplied nameplate drawing; no pre-refurbishment test records represented.; The supplied nameplate drawing states 138/13.8 kV; a voltage field in the 2022 test report states 115/13.8 kV. Obtain reconciliation and a matching current test package before technical acceptance.; Exterior photographs shown are from the 2022 refurbishment report. Request current dated photographs and inspect present condition through J&J.; Seller reports minimal previous service. J&J confirms it has not been installed since the 2022 refurbishment and has been maintained in storage. Earlier operating records are unavailable.; Documented exterior and cabinet cleaning/painting, bushings and LV bus bars, spare gaskets and bushing hardware; electrical testing included turns ratio, winding resistance, insulation resistance, power factor, excitation current and SFRA.; Inspection can be arranged with a 10% deposit, refundable only if the unit fails the buyer's tests or does not match the advertised specifications and condition. Confirm exact terms in the written offer.GSU duty; ONAN/ONAF1/ONAF2, 60 Hz, three-phase, vector group YNyn0+d11; Measured impedance: 13.41% on a 110 MVA base at nominal tap; 2020 factory tests passed; those records do not establish current condition; Five-unit lot includes two 2020 builds and three 2021 builds; request all five serial-specific packages before quotation
Evidence reviewedABB identified by the supplied replacement nameplate and historical refurbishment/test report; original OEM provenance to confirmFive-unit opportunity confirmed by seller; rating plate and FAT package reviewed for one unit
Technical value basisSupplied 2022 replacement nameplate and historical refurbishment/test report; current inspection is still required.One supplied nameplate and one factory-test package; values are not established for all five units.
Details to confirmConfirm the original OEM plate and vector clock; reconcile inconsistent voltage text in the historical test templates; Current inspection and oil analysis, complete earlier service history, accessories and final handling/shipping dimensionsAll five matching nameplates, insulation levels, approved drawings and factory tests; Reconcile unit-specific impedance bases; confirm current preservation and individual shipping weights
Represented conditionReconditioned used transformer; refurbishment completed in 2022Brand new, never used and never energized; 2020 factory records reviewed for one unit
Equipment locationLocation confirmed with quotationInternational; dispatch location confirmed with quotation
Technical records reviewed2026-10-082026-10-08
AvailabilityOffered by J&J; seller indicated 6-8 weeks for preparation/delivery on October 1, 2026. Current inspection, loading and delivery schedule by written confirmation.Available; 5 units represented; remaining unit packages require review; subject to prior sale and written confirmation
Availability last confirmedRequest current confirmation2026-09-24
Shipping estimate6–8 weeks quoted October 1, 2026; current preparation, loading and delivery schedule to confirmRequest a written dispatch and delivery schedule
Nameplate reviewedYes — request the unit packageYes — request the unit package
Drawings reviewedNot recorded as reviewed; request themNot recorded as reviewed; request them
Factory test report reviewedNot recorded as reviewed; request test recordsReport reviewed; confirm matching records for each unit
This unit onlyEmail for specs & price Email for specs & price

One request

Request Availability for Your Shortlist.

Email Tommy to discuss these options. The listing IDs will already be in the email subject.

Email this shortlist

What still needs to be checked?

Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.

Match the nameplate to the specification · Review surplus equipment records · Procurement checklist

Call Email Sales