Your equipment shortlist
Compare equipment before you request it.
Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.
| Compare | ABB 133 MVA 115/13.2 kV Pre-Owned GSUJJ-TX-208 | 60 MVA 115/34.5 kV Virginia TransformersJJ-TX-006 |
|---|---|---|
| Manufacturer | ABB Power T&D | Virginia Transformer Corp. |
| Rating / output | 80/106.67/133.33 MVA at 55C rise; 89.6/119.47/149.33 MVA at 65C rise | 36/48/60 MVA |
| Voltage / winding arrangement | 115 kV grounded wye / 13.2 kV delta | 115 kV delta / 34.5 kV grounded wye |
| Vector group | Grounded wye / delta; clock to confirm | Dyn1 |
| Frequency | 60 Hz | 60 Hz |
| Cooling | OA / FA / FA | ONAN / ONAF / ONAF |
| Impedance and base | 6.0% at 80 MVA | 8.42%, 8.41% and 8.46% at 36 MVA, by unit |
| Tap changer | Five-position de-energized HV tap changer, ±2 × 2.5% (±5%); 120.75 to 109.25 kV | ABB HV LTC; 103.5–126.5 kV (±10%); 16 raise / 16 lower steps of 0.625% |
| Insulation / BIL | HV winding and bushing 550 kV; LV winding/bushing and HV neutral 110 kV | HV line 550 kV; LV 200 kV |
| Quantity represented | One offered unit; subject to prior sale and written allocation | 3 units |
| Technical details / open items | OEM nameplate and supplied technical packet.; Design/nameplate basis: OA/FA/FA, 60 Hz, 55C / 65C dual ratings; Grounded wye / delta.; Tap changer: Five-position de-energized tap changer, +/-2 x 2.5% (+/-5%).; Impedance: 6.0% at 80 MVA; BIL: HV 550 kV; LV and HV neutral 110 kV.; Supplied June 2026 oil-analysis summary and OEM drawings/nameplate; inspection and complete reports available through J&J for qualified review.; Request current service history, inspection and full laboratory reports.; Two supplied equipment photographs are shown. Current condition and complete accessory scope require inspection; request the current matching photo set through J&J.; Ask J&J for current price, warranty, inspection and delivery terms. | ONAN/ONAF/ONAF, 60 Hz, three-phase, vector group Dyn1; Measured impedance: 8.42%, 8.41%, and 8.46% at 36 MVA by unit; Copper windings, Type II mineral oil, and ABB HV LTC |
| Evidence reviewed | OEM nameplate and supplied technical packet | Three unit-specific nameplates reviewed |
| Technical value basis | Supplied OEM nameplate and drawings; historical oil-analysis summary is separate from current condition. | Three individual nameplates reviewed; the impedance values vary by unit. |
| Details to confirm | Current inspection, complete oil laboratory reports, service history and accessory operation/completeness; Vector clock, final dismantling/loading schedule and current transport dimensions/weights | Match each unit to its factory tests and approved accessory schedule; Current preservation, overall/shipping dimensions and individual shipping weights |
| Represented condition | Pre-owned installed surplus; detailed service history requires confirmation | Brand new, never used and never energized; February-March 2026 nameplates reviewed |
| Equipment location | Location confirmed with quotation | USA |
| Technical records reviewed | 2026-10-08 | 2026-10-08 |
| Availability | Offered for inspection and purchase; current release, disassembly and loading dates require written confirmation | Available; three unit-specific nameplates reviewed; subject to prior sale and written reconfirmation |
| Availability last confirmed | Request current confirmation | 2026-09-24 |
| Shipping estimate | Request a written dispatch and delivery schedule | Request a written dispatch and delivery schedule |
| Nameplate reviewed | Yes — request the unit package | Yes — request the unit package |
| Drawings reviewed | Not recorded as reviewed; request them | Not recorded as reviewed; request them |
| Factory test report reviewed | Not recorded as reviewed; request test records | Not recorded as reviewed; request test records |
| This unit only | Email for specs & price | Email for specs & price |
One request
Request Availability for Your Shortlist.
Email Tommy to discuss these options. The listing IDs will already be in the email subject.
What still needs to be checked?
Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.
Match the nameplate to the specification · Review surplus equipment records · Procurement checklist
