Your equipment shortlist
Compare equipment before you request it.
Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.
| Compare | Two GE LM2500 21 MW Gas Turbines — Refurbishment ProgramJJ-TUR-005 | GE TM2500+ 33.9 MW Mobile Gas Turbine — 60 HzJJ-TUR-002 |
|---|---|---|
| Manufacturer | GE | GE |
| Rating / output | 21 MW each; 42 MW reported package total | 33.9 MW reported output |
| Voltage / winding arrangement | Generator voltage to confirm | Generator voltage to confirm |
| Vector group | Not applicable; generator connection to confirm | Not applicable; generator connection to confirm |
| Frequency | 60 Hz offered configuration | 60 Hz |
| Cooling | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Impedance and base | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Tap changer | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Insulation / BIL | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Quantity represented | 2 offered packages | 1 offered package |
| Technical details / open items | DLE configuration reported in the offered program.; These packages are offered for future completion, not immediate shipment.; Request the overhaul scope, hours and starts, final performance basis, generator records and acceptance-test schedule. | SAC combustion configuration reported; this is not represented as DLE.; Zero time since overhaul does not mean new manufacture or zero lifetime operating hours.; Allocation, reassembly scope and release require current written confirmation. |
| Evidence reviewed | Written equipment offer; unit-specific technical records and identity to confirm | Written equipment offer; unit-specific technical records and identity to confirm |
| Technical value basis | Received equipment offer; ratings, history and scope are representations until matched to the selected package. | Received equipment offer; ratings, history and scope are representations until matched to the selected package. |
| Details to confirm | Matching engine/turbine and generator nameplates, individual hours/starts, maintenance/overhaul records and current tests; Electrical duty, site-output basis, fuel/emissions, complete auxiliaries and loading/dismantling/transport scope | Matching engine/turbine and generator nameplates, individual hours/starts, maintenance/overhaul records and current tests; Electrical duty, site-output basis, fuel/emissions, complete auxiliaries and loading/dismantling/transport scope |
| Represented condition | Refurbishment and integration program; completion pending | Zero time since reported GE overhaul; previously operated equipment |
| Equipment location | Location confirmed with quotation | Location confirmed with quotation |
| Technical records reviewed | 2026-10-08 | 2026-10-08 |
| Availability | Offered subject to prior sale; Target completion December 2026; unconfirmed until final schedule | Offered subject to prior sale; Approximately two months quoted; current schedule to confirm |
| Availability last confirmed | Request current confirmation | Request current confirmation |
| Shipping estimate | Target completion December 2026; unconfirmed until final schedule | Approximately two months quoted; current schedule to confirm |
| Nameplate reviewed | Not recorded as reviewed; request it | Not recorded as reviewed; request it |
| Drawings reviewed | Not recorded as reviewed; request them | Not recorded as reviewed; request them |
| Factory test report reviewed | Not recorded as reviewed; request test records | Not recorded as reviewed; request test records |
| This unit only | Email for specs & price | Email for specs & price |
One request
Request Availability for Your Shortlist.
Email Tommy to discuss these options. The listing IDs will already be in the email subject.
What still needs to be checked?
Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.
Match the nameplate to the specification · Review surplus equipment records · Procurement checklist