Company base: Sugar Land, Texas · Nationwide sales · Tommy Marco

346-276-9540 tommy@jjtransformers.com

Turbine opportunity · JJ-TUR-005

Two GE LM2500 21 MW Gas Turbines — Refurbishment Program

Equipment location: Location confirmed with quotation. J&J is based in Sugar Land, Texas and serves projects nationwide.

Condition: Refurbishment and integration program; completion pending. J&J offers this GE turbine position for project screening. Two gas-turbine packages undergoing refurbishment/integration. The received offer is dated 2026-10-07; current allocation, price and delivery require written reconfirmation. Email Tommy with reference JJ-TUR-005 for specifications, price and current release timing. Written offer reviewed .

Written equipment offerOffer received Target completion December 2026; unconfirmed until final scheduleRequest current allocation and release terms · subject to prior sale
Request equipment photos

Public photos are not shown for this listing. Ask J&J for a current photo set and the matching technical records.

Request photos through J&J

Equipment summary

Specifications and scope

Unit IDJJ-TUR-005
ManufacturerGE
Manufacturer basisWritten equipment offer; unit-specific technical records and identity to confirm
Rating21 MW each; 42 MW reported package total
Voltage / outputGenerator voltage to confirm
Frequency60 Hz offered configuration
FuelDual fuel reported
Included package scopeTwo gas-turbine packages undergoing refurbishment/integration
Received offer date
Quantity2 offered packages
ShippingTarget completion December 2026; unconfirmed until final schedule
AvailabilityOffered subject to prior sale; Target completion December 2026; unconfirmed until final schedule
Condition basisRefurbishment and integration program; completion pending
Current locationLocation confirmed with quotation
Written offer reviewed

Technical highlights

  • DLE configuration reported in the offered program.
  • These packages are offered for future completion, not immediate shipment.
  • Request the overhaul scope, hours and starts, final performance basis, generator records and acceptance-test schedule.

Evidence reviewed

Written equipment offer; unit-specific technical records and identity to confirm

Records apply only to the stated unit or design basis.

Availability and terms

Offered subject to prior sale; Target completion December 2026; unconfirmed until final schedule

Ask for the current technical package, price, included accessories and delivery terms.

Confirm the purchase and delivery scope

Ask J&J to confirm the proposed unit’s allocation, price, inspection access, included accessories, loading and freight boundary, receiving arrangements, release schedule, deposit or reservation terms and any applicable warranty. Photos, matching records and inspection arrangements are coordinated through J&J.

Request written terms

Check this package against your project

Compare electrical output, duty, frequency, fuel, site conditions, operating history and included equipment. Request matching nameplates, maintenance/overhaul records and test reports for the specific package.

How is availability confirmed for this package?

Offered subject to prior sale; Target completion December 2026; unconfirmed until final schedule. The received offer date and record review are not a current reservation. Ask J&J for written allocation, price and release timing.

What equipment is included?

Two gas-turbine packages undergoing refurbishment/integration. Confirm the complete equipment schedule, accessories, controls, loading, dismantling where applicable and shipment scope in the quotation.

How do I request the technical package?

Email tommy@jjtransformers.com with reference JJ-TUR-005, required MW, voltage, frequency, fuel, quantity and needed-on-site date, or call 346-276-9540.

Compare related equipment

Review gas and steam turbines

Need a different unit?

Send the exact requirement.

Include MVA or MW, voltage, quantity, site, and need-by date for a private match.

Email for Availability
Call Email Sales