Equipment summary
Specifications and scope
| Unit ID | JJ-TUR-005 |
|---|---|
| Manufacturer | GE |
| Manufacturer basis | Written equipment offer; unit-specific technical records and identity to confirm |
| Rating | 21 MW each; 42 MW reported package total |
| Voltage / output | Generator voltage to confirm |
| Frequency | 60 Hz offered configuration |
| Fuel | Dual fuel reported |
| Included package scope | Two gas-turbine packages undergoing refurbishment/integration |
| Received offer date | |
| Quantity | 2 offered packages |
| Shipping | Target completion December 2026; unconfirmed until final schedule |
| Availability | Offered subject to prior sale; Target completion December 2026; unconfirmed until final schedule |
| Condition basis | Refurbishment and integration program; completion pending |
| Current location | Location confirmed with quotation |
| Written offer reviewed |
Technical highlights
- DLE configuration reported in the offered program.
- These packages are offered for future completion, not immediate shipment.
- Request the overhaul scope, hours and starts, final performance basis, generator records and acceptance-test schedule.
Evidence reviewed
Written equipment offer; unit-specific technical records and identity to confirm
Records apply only to the stated unit or design basis.
Availability and terms
Offered subject to prior sale; Target completion December 2026; unconfirmed until final schedule
Ask for the current technical package, price, included accessories and delivery terms.
Confirm the purchase and delivery scope
Ask J&J to confirm the proposed unit’s allocation, price, inspection access, included accessories, loading and freight boundary, receiving arrangements, release schedule, deposit or reservation terms and any applicable warranty. Photos, matching records and inspection arrangements are coordinated through J&J.
Request written termsCheck this package against your project
Compare electrical output, duty, frequency, fuel, site conditions, operating history and included equipment. Request matching nameplates, maintenance/overhaul records and test reports for the specific package.
- Match the generator, GSU transformer and circuit breaker
- Review 50 Hz and 60 Hz package compatibility
- Compare generator step-up transformer requirements
How is availability confirmed for this package?
Offered subject to prior sale; Target completion December 2026; unconfirmed until final schedule. The received offer date and record review are not a current reservation. Ask J&J for written allocation, price and release timing.
What equipment is included?
Two gas-turbine packages undergoing refurbishment/integration. Confirm the complete equipment schedule, accessories, controls, loading, dismantling where applicable and shipment scope in the quotation.
How do I request the technical package?
Email tommy@jjtransformers.com with reference JJ-TUR-005, required MW, voltage, frequency, fuel, quantity and needed-on-site date, or call 346-276-9540.
