Your equipment shortlist
Compare equipment before you request it.
Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.
| Compare | Two GE LM2500+G4 DLE 33.6 MW Gas Turbine PackagesJJ-TUR-004 | GE TM2500 Gen 6 29 MW Mobile Gas TurbineJJ-TUR-001 |
|---|---|---|
| Manufacturer | GE | GE |
| Rating / output | 33.6 MW each; 67.2 MW reported simple-cycle total | 29 MW reported output; installed configuration and site output to confirm |
| Voltage / winding arrangement | 13.8 kV Brush generators | 11.5 kV represented |
| Vector group | Not applicable; generator connection to confirm | Not applicable; generator connection to confirm |
| Frequency | 60 Hz gas-turbine generators | 50/60 Hz advertised; conflicting 50 Hz field — installed configuration to confirm |
| Cooling | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Impedance and base | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Tap changer | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Insulation / BIL | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Quantity represented | 2 offered packages | 1 offered package |
| Technical details / open items | DLE combustion and 50/60 Hz switchable turbine auxiliaries reported.; Zero fired hours must not be described as zero total test or operating activity.; An optional 2×1 combined-cycle configuration includes a separate 25 MW, 50 Hz steam turbine. Engineering must resolve the frequency interface; the entire optional plant is not represented as a uniform 60 Hz package. | Two supplier-provided equipment photos from the October 2, 2026 offer are shown. Matching nameplates, service records and current condition are requested with the quotation.; Confirm generator frequency, fuel system, controls, transport scope and hours before technical acceptance.; Availability has not been independently reconfirmed; this is separate from the 33.9 MW TM2500+ listing. |
| Evidence reviewed | Written equipment offer; unit-specific technical records and identity to confirm | Written equipment offer; unit-specific technical records and identity to confirm |
| Technical value basis | Received equipment offer; ratings, history and scope are representations until matched to the selected package. | Received equipment offer; ratings, history and scope are representations until matched to the selected package. |
| Details to confirm | Matching engine/turbine and generator nameplates, individual hours/starts, maintenance/overhaul records and current tests; Electrical duty, site-output basis, fuel/emissions, complete auxiliaries and loading/dismantling/transport scope | Matching turbine/generator nameplates, actual installed frequency, maintenance records and final auxiliary/trailer scope |
| Represented condition | Zero fired hours reported; installed and commissioned with high-speed crank testing | Used; former standby service represented; current condition and maintenance history to confirm |
| Equipment location | Location confirmed with quotation | Location confirmed with quotation |
| Technical records reviewed | 2026-10-08 | 2026-10-08 |
| Availability | Offered subject to prior sale; current availability and release schedule to confirm | Offered subject to prior sale; current availability and release schedule to confirm |
| Availability last confirmed | Request current confirmation | Request current confirmation |
| Shipping estimate | Request a written dispatch and delivery schedule | Request a written dispatch and delivery schedule |
| Nameplate reviewed | Not recorded as reviewed; request it | Not recorded as reviewed; request it |
| Drawings reviewed | Not recorded as reviewed; request them | Not recorded as reviewed; request them |
| Factory test report reviewed | Not recorded as reviewed; request test records | Not recorded as reviewed; request test records |
| This unit only | Email for specs & price | Email for specs & price |
One request
Request Availability for Your Shortlist.
Email Tommy to discuss these options. The listing IDs will already be in the email subject.
What still needs to be checked?
Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.
Match the nameplate to the specification · Review surplus equipment records · Procurement checklist
