Equipment summary
Specifications and scope
| Unit ID | JJ-TUR-004 |
|---|---|
| Manufacturer | GE |
| Manufacturer basis | Written equipment offer; unit-specific technical records and identity to confirm |
| Rating | 33.6 MW each; 67.2 MW reported simple-cycle total |
| Voltage / output | 13.8 kV Brush generators |
| Frequency | 60 Hz gas-turbine generators |
| Fuel | Fuel specification to confirm |
| Manufacture / history dates | 2013 cores; packaged around 2019; installed/commissioned 2022 |
| Operating history | Zero fired hours; high-speed crank testing reported |
| Included package scope | Two simple-cycle packages; optional combined-cycle scope is separate |
| Received offer date | |
| Quantity | 2 offered packages |
| Availability | Offered subject to prior sale; current availability and release schedule to confirm |
| Condition basis | Zero fired hours reported; installed and commissioned with high-speed crank testing |
| Current location | Location confirmed with quotation |
| Written offer reviewed |
Technical highlights
- DLE combustion and 50/60 Hz switchable turbine auxiliaries reported.
- Zero fired hours must not be described as zero total test or operating activity.
- An optional 2×1 combined-cycle configuration includes a separate 25 MW, 50 Hz steam turbine. Engineering must resolve the frequency interface; the entire optional plant is not represented as a uniform 60 Hz package.
Evidence reviewed
Written equipment offer; unit-specific technical records and identity to confirm
Records apply only to the stated unit or design basis.
Availability and terms
Offered subject to prior sale; current availability and release schedule to confirm
Ask for the current technical package, price, included accessories and delivery terms.
Confirm the purchase and delivery scope
Ask J&J to confirm the proposed unit’s allocation, price, inspection access, included accessories, loading and freight boundary, receiving arrangements, release schedule, deposit or reservation terms and any applicable warranty. Photos, matching records and inspection arrangements are coordinated through J&J.
Request written termsCheck this package against your project
Compare electrical output, duty, frequency, fuel, site conditions, operating history and included equipment. Request matching nameplates, maintenance/overhaul records and test reports for the specific package.
- Match the generator, GSU transformer and circuit breaker
- Review 50 Hz and 60 Hz package compatibility
- Compare generator step-up transformer requirements
How is availability confirmed for this package?
Offered subject to prior sale; current availability and release schedule to confirm. The received offer date and record review are not a current reservation. Ask J&J for written allocation, price and release timing.
What equipment is included?
Two simple-cycle packages; optional combined-cycle scope is separate. Confirm the complete equipment schedule, accessories, controls, loading, dismantling where applicable and shipment scope in the quotation.
How do I request the technical package?
Email tommy@jjtransformers.com with reference JJ-TUR-004, required MW, voltage, frequency, fuel, quantity and needed-on-site date, or call 346-276-9540.
