Equipment summary
Specifications and scope
| Unit ID | JJ-TUR-011 |
|---|---|
| Manufacturer | Siemens |
| Manufacturer basis | Written equipment offer; unit-specific technical records and identity to confirm |
| Rating | 24.5 MW reported per unit |
| Voltage / output | Generator voltage to confirm |
| Frequency | 50 Hz |
| Fuel | Fuel specification to confirm |
| Included package scope | Full turbine packages; final generator and auxiliary schedule to confirm |
| Received offer date | |
| Quantity | 2 offered packages |
| Shipping | Approximately 3–4 months quoted; completion and release to confirm |
| Availability | Offered subject to prior sale; Approximately 3–4 months quoted; completion and release to confirm |
| Condition basis | New/unused reported; completion to zero-hour condition pending |
| Current location | Location confirmed with quotation |
| Written offer reviewed |
Technical highlights
- This is separate from the 35 MW combined-cycle plant with 553 reported operating hours.
- Completion milestones, preservation records, nameplates, tests and included scope require review.
- Any warranty is confirmed only in the final written quotation; no generic site warranty is implied.
Evidence reviewed
Written equipment offer; unit-specific technical records and identity to confirm
Records apply only to the stated unit or design basis.
Availability and terms
Offered subject to prior sale; Approximately 3–4 months quoted; completion and release to confirm
Ask for the current technical package, price, included accessories and delivery terms.
Confirm the purchase and delivery scope
Ask J&J to confirm the proposed unit’s allocation, price, inspection access, included accessories, loading and freight boundary, receiving arrangements, release schedule, deposit or reservation terms and any applicable warranty. Photos, matching records and inspection arrangements are coordinated through J&J.
Request written termsCheck this package against your project
Compare electrical output, duty, frequency, fuel, site conditions, operating history and included equipment. Request matching nameplates, maintenance/overhaul records and test reports for the specific package.
- Match the generator, GSU transformer and circuit breaker
- Review 50 Hz and 60 Hz package compatibility
- Compare generator step-up transformer requirements
How is availability confirmed for this package?
Offered subject to prior sale; Approximately 3–4 months quoted; completion and release to confirm. The received offer date and record review are not a current reservation. Ask J&J for written allocation, price and release timing.
What equipment is included?
Full turbine packages; final generator and auxiliary schedule to confirm. Confirm the complete equipment schedule, accessories, controls, loading, dismantling where applicable and shipment scope in the quotation.
How do I request the technical package?
Email tommy@jjtransformers.com with reference JJ-TUR-011, required MW, voltage, frequency, fuel, quantity and needed-on-site date, or call 346-276-9540.