Your equipment shortlist
Compare equipment before you request it.
Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.
| Compare | Two Siemens SGT-600 DLE 24.5 MW Unused Turbine PackagesJJ-TUR-011 | GE LM2500 G4 36.1 MW Gas Turbine PackageJJ-TUR-003 |
|---|---|---|
| Manufacturer | Siemens | GE |
| Rating / output | 24.5 MW reported per unit | 36.1 MW reported output |
| Voltage / winding arrangement | Generator voltage to confirm | Generator voltage to confirm |
| Vector group | Not applicable; generator connection to confirm | Not applicable; generator connection to confirm |
| Frequency | 50 Hz | Frequency to confirm |
| Cooling | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Impedance and base | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Tap changer | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Insulation / BIL | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Quantity represented | 2 offered packages | 1 offered package |
| Technical details / open items | This is separate from the 35 MW combined-cycle plant with 553 reported equivalent working hours.; Completion milestones, preservation records, nameplates, tests and included scope require review.; Any warranty is confirmed only in the final written quotation; no generic site warranty is implied. | Request matching turbine and generator records, maintenance history and package drawings.; Do not combine this single 36.1 MW position with the two 33.6 MW LM2500+G4 packages.; Current availability and delivery require written reconfirmation. |
| Evidence reviewed | Written equipment offer; unit-specific technical records and identity to confirm | Written equipment offer; unit-specific technical records and identity to confirm |
| Technical value basis | Received equipment offer; ratings, history and scope are representations until matched to the selected package. | Received equipment offer; ratings, history and scope are representations until matched to the selected package. |
| Details to confirm | Matching engine/turbine and generator nameplates, individual hours/starts, maintenance/overhaul records and current tests; Electrical duty, site-output basis, fuel/emissions, complete auxiliaries and loading/dismantling/transport scope | Matching engine/turbine and generator nameplates, individual hours/starts, maintenance/overhaul records and current tests; Electrical duty, site-output basis, fuel/emissions, complete auxiliaries and loading/dismantling/transport scope |
| Represented condition | New/unused reported; completion to zero-hour condition pending | 2011 manufacture reported; condition and hours to confirm |
| Equipment location | Location confirmed with quotation | Location confirmed with quotation |
| Technical records reviewed | 2026-10-08 | 2026-10-08 |
| Availability | Offered subject to prior sale; Approximately 3–4 months quoted; completion and release to confirm | Offered subject to prior sale; current availability and release schedule to confirm |
| Availability last confirmed | Request current confirmation | Request current confirmation |
| Shipping estimate | Approximately 3–4 months quoted; completion and release to confirm | Request a written dispatch and delivery schedule |
| Nameplate reviewed | Not recorded as reviewed; request it | Not recorded as reviewed; request it |
| Drawings reviewed | Not recorded as reviewed; request them | Not recorded as reviewed; request them |
| Factory test report reviewed | Not recorded as reviewed; request test records | Not recorded as reviewed; request test records |
| This unit only | Email for specs & price | Email for specs & price |
One request
Request Availability for Your Shortlist.
Email Tommy to discuss these options. The listing IDs will already be in the email subject.
What still needs to be checked?
Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.
Match the nameplate to the specification · Review surplus equipment records · Procurement checklist