Your equipment shortlist
Compare equipment before you request it.
Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.
| Compare | Westinghouse / GE 66 MVA Rebuilt Transformer OffersJJ-WEST-GE-66-2 | 220 MVA 345/34.5 kV Prolec GE TransformerJJ-TX-002 |
|---|---|---|
| Manufacturer | Westinghouse | Prolec GE |
| Rating / output | 39.6/52.8/66 MVA represented; 66 MVA in one supplied report | 132/176/220 MVA; 46.2/61.6/77 MVA tertiary |
| Voltage / winding arrangement | 140.9 kV Delta / 34.5 kV Wye in one report; offered as nominal 138/34.5 kV | 345/34.5 kV with 13.8 kV delta tertiary |
| Vector group | Delta–Wye in one supplied report; both nameplates and clock to confirm | Grounded Wye–Wye / Delta; clock to confirm |
| Frequency | 60 Hz in the supplied report; confirm both units | 60 Hz |
| Cooling | OA / FA in the supplied report | ONAN / ONAF / ONAF |
| Impedance and base | 7.2% reported; MVA base to confirm | Design H–X: 12.0% at 132 MVA |
| Tap changer | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Insulation / BIL | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Quantity represented | 2 represented units; report reviewed for 1 | 1 documented unit |
| Technical details / open items | The offer represents two Westinghouse transformers rebuilt by GE Energy, rated 39.6/52.8/66 MVA. One supplied nameplate states March 2008 remanufacture, conflicting with the email's 2012 rebuild claim; reconcile the rebuild history for each unit.; The offered nominal 138/34.5 kV description differs from the 140.9 kV delta / 34.5 kV wye nameplate fields in the supplied report for one unit. Resolve this before approving project duty; 138 kV is not presented as a verified nameplate rating.; The readable report covers one unit, not both. It records three-phase, 60 Hz, 66 MVA, OA/FA cooling, 65 C rise and 7.2% impedance; confirm the nameplate and rating basis for each unit.; Maintenance entries record bottom-valve oil leaks through March 2026 and a broken gauge in November 2025. Present repair completion and condition have not been verified.; A July 2025 dielectric result was recorded as unacceptable, followed by later acceptable readings. Obtain the complete history, current inspection and new tests appropriate to the purchase.; Request the second unit's individual nameplate, test and maintenance package. Historical service entries do not establish present operating status, readiness to energize or availability. | Collector step-up duty; ONAN/ONAF/ONAF, 60 Hz, three-phase; Grounded-wye / grounded-wye / delta winding configuration; Nominal design H-X impedance: 12.0% on a 132 MVA base |
| Evidence reviewed | Written offer identifies Westinghouse manufacture and a GE Energy rebuild; supplied maintenance report covers one unit | Serial-specific nameplate and approval drawings reviewed |
| Technical value basis | Supplied nameplate and maintenance report for one unit in a two-unit offer; match the second unit separately and reconcile the rebuild dates. | Supplied nameplate and approval drawings; design values require matching final factory records. |
| Details to confirm | Both final nameplates and exact voltage fit; rating stages and impedance bases; Current leak/gauge repairs, oil analysis, full tests, service history and transport scope | Final tested impedance, insulation levels, complete tap schedule and approved drawing revision; Overall and shipping dimensions, shipping weight, accessory schedule and current preservation |
| Represented condition | Pre-owned / rebuilt; recorded valve leaks and broken gauge require present repair verification | Brand new, never used and never energized; approval drawings reviewed |
| Equipment location | USA | USA |
| Technical records reviewed | 2026-10-08 | 2026-10-08 |
| Availability | Offered September 23, 2026; voltage, present condition and availability require written confirmation | Available; nameplate and approval drawings reviewed; subject to prior sale and written confirmation |
| Availability last confirmed | Request current confirmation | 2026-09-24 |
| Shipping estimate | Request a written dispatch and delivery schedule | Request a written dispatch and delivery schedule |
| Nameplate reviewed | Not recorded as reviewed; request it | Yes — request the unit package |
| Drawings reviewed | Not recorded as reviewed; request them | Yes — request matching unit drawings |
| Factory test report reviewed | Not recorded as reviewed; request test records | Not recorded as reviewed; request test records |
| This unit only | Request more info | Request more info |
One request
Request Availability for Your Shortlist.
Email Tommy to discuss these options. The listing IDs will already be in the email subject.
What still needs to be checked?
Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.
Match the nameplate to the specification · Review surplus equipment records · Procurement checklist
