Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.

J&J Transformers LLC · 346-276-9540 · tommy@jjtransformers.com

Published specifications for 2 alternatives. Availability remains subject to prior sale and written reconfirmation.
CompareWestinghouse / GE 66 MVA Rebuilt Transformer OffersJJ-WEST-GE-66-2300 MVA 138/34.5 kV Georgia TransformerJJ-TX-001
ManufacturerWestinghouseGeorgia Transformer
Rating / output39.6/52.8/66 MVA represented; 66 MVA in one supplied report180/240/300 MVA; 63/84/105 MVA tertiary
Voltage / winding arrangement140.9 kV Delta / 34.5 kV Wye in one report; offered as nominal 138/34.5 kV138/34.5 kV with 12 kV buried-delta tertiary
Vector groupDelta–Wye in one supplied report; both nameplates and clock to confirmYNyn0+d1
Frequency60 Hz in the supplied report; confirm both unitsNot documented; confirm with J&J
CoolingOA / FA in the supplied reportNot documented; confirm with J&J
Impedance and base7.2% reported; MVA base to confirmNot documented; confirm with J&J
Tap changerNot documented; confirm with J&JNot documented; confirm with J&J
Insulation / BILNot documented; confirm with J&JNot documented; confirm with J&J
Quantity represented2 represented units; report reviewed for 11 documented unit
Technical details / open itemsThe offer represents two Westinghouse transformers rebuilt by GE Energy, rated 39.6/52.8/66 MVA. One supplied nameplate states March 2008 remanufacture, conflicting with the email's 2012 rebuild claim; reconcile the rebuild history for each unit.; The offered nominal 138/34.5 kV description differs from the 140.9 kV delta / 34.5 kV wye nameplate fields in the supplied report for one unit. Resolve this before approving project duty; 138 kV is not presented as a verified nameplate rating.; The readable report covers one unit, not both. It records three-phase, 60 Hz, 66 MVA, OA/FA cooling, 65 C rise and 7.2% impedance; confirm the nameplate and rating basis for each unit.; Maintenance entries record bottom-valve oil leaks through March 2026 and a broken gauge in November 2025. Present repair completion and condition have not been verified.; A July 2025 dielectric result was recorded as unacceptable, followed by later acceptable readings. Obtain the complete history, current inspection and new tests appropriate to the purchase.; Request the second unit's individual nameplate, test and maintenance package. Historical service entries do not establish present operating status, readiness to energize or availability.ONAN/ONAF/ONAF, 60 Hz, three-phase, vector group YNyn0+d1; Measured 138/34.5 kV impedance: 9.67% on a 180 MVA base; Copper windings, conservator system, Type II mineral oil, and HV OLTC
Evidence reviewedWritten offer identifies Westinghouse manufacture and a GE Energy rebuild; supplied maintenance report covers one unitSerial-specific nameplate reviewed
Technical value basisSupplied nameplate and maintenance report for one unit in a two-unit offer; match the second unit separately and reconcile the rebuild dates.Serial-specific nameplate reviewed
Details to confirmBoth final nameplates and exact voltage fit; rating stages and impedance bases; Current leak/gauge repairs, oil analysis, full tests, service history and transport scopeMatching technical records, current condition, complete equipment scope and transport details
Represented conditionPre-owned / rebuilt; recorded valve leaks and broken gauge require present repair verificationBrand new, never used and never energized; 2020 nameplate reviewed
Equipment locationUSAUSA
Technical records reviewed2026-10-082026-10-08
AvailabilityOffered September 23, 2026; voltage, present condition and availability require written confirmationAvailable for sale — confirmed by J&J October 8, 2026; quotation and release terms on request
Availability last confirmedRequest current confirmation2026-10-08
Shipping estimateRequest a written dispatch and delivery scheduleRequest a written dispatch and delivery schedule
Nameplate reviewedNot recorded as reviewed; request itYes — request the unit package
Drawings reviewedNot recorded as reviewed; request themNot recorded as reviewed; request them
Factory test report reviewedNot recorded as reviewed; request test recordsNot recorded as reviewed; request test records
This unit only Request more info Request more info

One request

Request Availability for Your Shortlist.

Email Tommy to discuss these options. The listing IDs will already be in the email subject.

Email this shortlist

What still needs to be checked?

Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.

Match the nameplate to the specification · Review surplus equipment records · Procurement checklist

Call Email Sales