Your equipment shortlist

Compare equipment before you request it.

Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.

J&J Transformers LLC · 346-276-9540 · tommy@jjtransformers.com

Published specifications for 2 alternatives. Availability remains subject to prior sale and written reconfirmation.
CompareWestinghouse / GE 66 MVA Rebuilt Transformer OffersJJ-WEST-GE-66-2Royal SMIT 525/69 kV Transformers — 3 AvailableJJ-SMIT-525-3
ManufacturerWestinghouseRoyal SMIT
Rating / output39.6/52.8/66 MVA represented; 66 MVA in one supplied report240/320/400 MVA; 250 MVA maximum step-down; 90 MVA tertiary
Voltage / winding arrangement140.9 kV Delta / 34.5 kV Wye in one report; offered as nominal 138/34.5 kV525/69 kV with 13.7 kV buried-delta tertiary
Vector groupDelta–Wye in one supplied report; both nameplates and clock to confirmYNyn0(d1) — Wye–Wye / buried Delta
Frequency60 Hz in the supplied report; confirm both units60 Hz
CoolingOA / FA in the supplied reportONAN / ONAF / ONAF
Impedance and base7.2% reported; MVA base to confirmH–X: 12.90% at 240 MVA, 525/69 kV, 85°C
Tap changerNot documented; confirm with J&JHV OLTC; 472.5–577.5 kV (±10%); 16 raise / 16 lower steps of 0.625%
Insulation / BILNot documented; confirm with J&JHV winding 1550 kV / bushing 1675 kV; LV 350 kV; tertiary 150 kV
Quantity represented2 represented units; report reviewed for 13 units
Technical details / open itemsThe offer represents two Westinghouse transformers rebuilt by GE Energy, rated 39.6/52.8/66 MVA. One supplied nameplate states March 2008 remanufacture, conflicting with the email's 2012 rebuild claim; reconcile the rebuild history for each unit.; The offered nominal 138/34.5 kV description differs from the 140.9 kV delta / 34.5 kV wye nameplate fields in the supplied report for one unit. Resolve this before approving project duty; 138 kV is not presented as a verified nameplate rating.; The readable report covers one unit, not both. It records three-phase, 60 Hz, 66 MVA, OA/FA cooling, 65 C rise and 7.2% impedance; confirm the nameplate and rating basis for each unit.; Maintenance entries record bottom-valve oil leaks through March 2026 and a broken gauge in November 2025. Present repair completion and condition have not been verified.; A July 2025 dielectric result was recorded as unacceptable, followed by later acceptable readings. Obtain the complete history, current inspection and new tests appropriate to the purchase.; Request the second unit's individual nameplate, test and maintenance package. Historical service entries do not establish present operating status, readiness to energize or availability.Three units offered for allocation; availability and 4–8 week shipping schedule confirmed by J&J on October 1, 2026.; Nameplate rating: 240/320/400 MVA with ONAN/ONAF/ONAF cooling. Maximum stated duty: 400 MVA step-up or 250 MVA step-down.; Three-phase, 60 Hz; 525 kV grounded-wye high side, 69 kV wye low side, and 13.7 kV buried-delta tertiary rated 90 MVA.; Copper windings; MR on-load tap changer; HV tap range 472.5–577.5 kV (±10%).; HV BIL: 1550 kV winding / 1675 kV bushing. LV BIL: 350 kV.; Nameplate H-X impedance: 12.90% at 240 MVA base, 525/69 kV, 85°C.; Supplied 2022 factory acceptance test report records Passed for the documented unit. Nameplate, outline drawing and test report available through J&J; match the records to all three units before purchase.
Evidence reviewedWritten offer identifies Westinghouse manufacture and a GE Energy rebuild; supplied maintenance report covers one unitSupplied nameplate, outline drawing and factory acceptance test report
Technical value basisSupplied nameplate and maintenance report for one unit in a two-unit offer; match the second unit separately and reconcile the rebuild dates.Supplied nameplate for one documented unit; match the complete package to each of the three offered units.
Details to confirmBoth final nameplates and exact voltage fit; rating stages and impedance bases; Current leak/gauge repairs, oil analysis, full tests, service history and transport scopeMatching records for each offered unit, current condition, included accessories and transport scope; Unit-specific factory tests, present preservation and the step-down duty limit
Represented conditionPre-owned / rebuilt; recorded valve leaks and broken gauge require present repair verification2022 manufacture shown in supplied nameplate; condition and service history confirmed with quotation
Equipment locationUSAInternational; dispatch location confirmed with quotation
Technical records reviewed2026-10-082026-10-08
AvailabilityOffered September 23, 2026; voltage, present condition and availability require written confirmationImmediately available; estimated 4–8 weeks to ship; subject to prior sale
Availability last confirmedRequest current confirmation2026-10-01
Shipping estimateRequest a written dispatch and delivery schedule4–8 weeks to ship
Nameplate reviewedNot recorded as reviewed; request itYes — request the unit package
Drawings reviewedNot recorded as reviewed; request themYes — request matching unit drawings
Factory test report reviewedNot recorded as reviewed; request test recordsReport reviewed; confirm matching records for each unit
This unit only Request more info Request more info

One request

Request Availability for Your Shortlist.

Email Tommy to discuss these options. The listing IDs will already be in the email subject.

Email this shortlist

What still needs to be checked?

Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.

Match the nameplate to the specification · Review surplus equipment records · Procurement checklist