Your equipment shortlist
Compare equipment before you request it.
Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.
| Compare | WEG 120 MVA 230/34.5 kV Transformer OfferJJ-WEG-230-120 | 167 MVA 230/34.5 kV Fortune Electric TransformerJJ-FORTUNE-230-167 |
|---|---|---|
| Manufacturer | WEG | Fortune Electric |
| Rating / output | 72/96/120 MVA | 100/133/167 MVA; 35 MVA tertiary |
| Voltage / winding arrangement | 230/34.5 kV | 230/34.5 kV with 13.3 kV buried-delta tertiary |
| Vector group | Winding connections to confirm | YNyn0d1 |
| Frequency | Not documented; confirm with J&J | 60 Hz |
| Cooling | Not documented; confirm with J&J | ONAN / ONAF1 / ONAF2 |
| Impedance and base | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Tap changer | Not documented; confirm with J&J | HV OLTC; 207–253 kV (±10%), design basis |
| Insulation / BIL | Not documented; confirm with J&J | HV line 750 kV; HV neutral and LV 200 kV; tertiary 110 kV |
| Quantity represented | 1 represented option | 1 unit |
| Technical details / open items | The received September 30 forward repeats an August offer for a WEG 72/96/120 MVA, 230/34.5 kV unit represented as stored in the United States.; Individual new/unused or previously operated condition is not established. This record is excluded from both the new/unused and used/pre-owned filters until condition is confirmed.; The earlier approximate four-week lead time is not a current delivery commitment. Request present allocation and release milestones.; Obtain the individual nameplate, winding connections, frequency, cooling, preservation/service history, test reports and written warranty terms.; This is separate from J&J's WEG 120/24.9 kV 166.667 MVA record and the WEG 230/34.5 kV 88 MVA record. | Three-phase, 60 Hz; ONAN/ONAF1/ONAF2 cooling; 65 C winding rise; Grounded-wye / grounded-wye / delta; vector group YNyn0d1; HV OLTC range 207-253 kV; 13.3 kV, 35 MVA buried-delta tertiary; Copper windings, Type II mineral oil; Nameplate drawing identifies suitability for step-up operation; final test results and impedance available subject to confirmation |
| Evidence reviewed | Received written equipment offer | Nameplate drawing reviewed |
| Technical value basis | Received written equipment offer; this unit has not been matched to an individual technical package. | Supplied design nameplate and outline drawings; blank final values remain unconfirmed. |
| Details to confirm | Individual condition/service history, nameplate, frequency, cooling/rise and connections; Impedance/base, BIL, taps, conductor/fluid, tests, dimensions/weights and present preservation | Final tested impedance and base, manufacture year and final tap-switch specification; Final oil quantity, dimensions, tests, current preservation and complete accessories |
| Represented condition | Individual condition and service history require confirmation | Brand new, never used and never energized |
| Equipment location | USA | USA |
| Technical records reviewed | 2026-10-08 | 2026-10-08 |
| Availability | August offer re-forwarded September 30, 2026; present availability and release timing unconfirmed | Available; subject to prior sale and written confirmation |
| Availability last confirmed | Request current confirmation | 2026-09-24 |
| Shipping estimate | Request a written dispatch and delivery schedule | Request a written dispatch and delivery schedule |
| Nameplate reviewed | Not recorded as reviewed; request it | Yes — request the unit package |
| Drawings reviewed | Not recorded as reviewed; request them | Yes — request matching unit drawings |
| Factory test report reviewed | Not recorded as reviewed; request test records | Not recorded as reviewed; request test records |
| This unit only | Email for specs & price | Email for specs & price |
One request
Request Availability for Your Shortlist.
Email Tommy to discuss these options. The listing IDs will already be in the email subject.
What still needs to be checked?
Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.
Match the nameplate to the specification · Review surplus equipment records · Procurement checklist