Your equipment shortlist
Compare equipment before you request it.
Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.
| Compare | 65 MVA 138/13.8 kV Reconditioned GSUJJ-TX-209 | 50 MVA-Class 138/13.8 kV Substation PackageJJ-TX-007 |
|---|---|---|
| Manufacturer | ABB | Manufacturer to confirm |
| Rating / output | 39/52/65 MVA at 65°C rise | 30/39.9/50 MVA at 55 C; 33.6/44.7/56 MVA at 65 C |
| Voltage / winding arrangement | 138 kV grounded wye / 13.8 kV delta | 138 kV delta / 13.8 kV grounded wye |
| Vector group | Grounded wye / delta; clock to confirm | Delta–Grounded Wye; clock to confirm |
| Frequency | 60 Hz | 60 Hz |
| Cooling | ONAN / ONAF / ONAF; legacy OA / FA / FA in cutsheets | ONAN / ONAF / ONAF |
| Impedance and base | 9.51% at 39 MVA shown on replacement nameplate; not a new field impedance test | Not documented; confirm with J&J |
| Tap changer | Five-position de-energized HV tap changer: 144.9, 141.45, 138, 134.55, 131.1 kV (±2 × 2.5%, ±5%) | Five-position HV DETC: 131.1, 134.55, 138, 141.45 and 144.9 kV (±5%, 2.5% steps) |
| Insulation / BIL | HV winding 550 kV / bushing 650 kV; LV winding 110 kV / bushings 150 kV; HV neutral bushing 150 kV | HV 650 kV; LV 110 kV, drawing basis |
| Quantity represented | One unit; current allocation subject to written confirmation | 1 represented design package |
| Technical details / open items | ABB is identified by the supplied replacement nameplate and historical refurbishment/testing report; confirm the original OEM plate and provenance.; Design/nameplate basis: ONAN/ONAF/ONAF, 60 Hz, 65C; Grounded wye / delta.; Tap changer: Five-position de-energized HV tap changer (144.9, 141.45, 138, 134.55, 131.1 kV; +/-2 x 2.5%).; Impedance: 9.51% at 39 MVA as shown in the supplied nameplate drawing; final test values to compare; BIL: HV winding 550 kV; LV winding 110 kV.; 2022 refurbishment and electrical-test report plus supplied nameplate drawing; no pre-refurbishment test records represented.; The supplied nameplate drawing states 138/13.8 kV; a voltage field in the 2022 test report states 115/13.8 kV. Obtain reconciliation and a matching current test package before technical acceptance.; Exterior photographs shown are from the 2022 refurbishment report. Request current dated photographs and inspect present condition through J&J.; Seller reports minimal previous service. J&J confirms it has not been installed since the 2022 refurbishment and has been maintained in storage. Earlier operating records are unavailable.; Documented exterior and cabinet cleaning/painting, bushings and LV bus bars, spare gaskets and bushing hardware; electrical testing included turns ratio, winding resistance, insulation resistance, power factor, excitation current and SFRA.; Inspection can be arranged with a 10% deposit, refundable only if the unit fails the buyer's tests or does not match the advertised specifications and condition. Confirm exact terms in the written offer. | Oil-immersed substation transformer; ONAN/ONAF/ONAF, 60 Hz, three-phase; HV de-energized tap range: 131.1-144.9 kV; Final impedance, serial number, test data, and manufacture date are not populated |
| Evidence reviewed | ABB identified by the supplied replacement nameplate and historical refurbishment/test report; original OEM provenance to confirm | Project-specific supplied approval drawings reviewed; final equipment OEM and serial identity require confirmation |
| Technical value basis | Supplied 2022 replacement nameplate and historical refurbishment/test report; current inspection is still required. | Supplied approval design drawings; a completed individual nameplate and final equipment identity have not been established. |
| Details to confirm | Confirm the original OEM plate and vector clock; reconcile inconsistent voltage text in the historical test templates; Current inspection and oil analysis, complete earlier service history, accessories and final handling/shipping dimensions | Final OEM, individual equipment identity, manufacture year, tested impedance and factory reports; Final drawings, current preservation, complete accessories and shipping configuration |
| Represented condition | Reconditioned used transformer; refurbishment completed in 2022 | Brand new, never used and never energized; 2024 approval drawings reviewed; serial identity requires confirmation |
| Equipment location | Location confirmed with quotation | USA |
| Technical records reviewed | 2026-10-08 | 2026-10-08 |
| Availability | Offered by J&J; seller indicated 6-8 weeks for preparation/delivery on October 1, 2026. Current inspection, loading and delivery schedule by written confirmation. | Available; approval drawings reviewed; unit identity requires documentation; subject to prior sale and written confirmation |
| Availability last confirmed | Request current confirmation | 2026-09-24 |
| Shipping estimate | 6–8 weeks quoted October 1, 2026; current preparation, loading and delivery schedule to confirm | Request a written dispatch and delivery schedule |
| Nameplate reviewed | Yes — request the unit package | Not recorded as reviewed; request it |
| Drawings reviewed | Not recorded as reviewed; request them | Yes — request matching unit drawings |
| Factory test report reviewed | Not recorded as reviewed; request test records | Not recorded as reviewed; request test records |
| This unit only | Email for specs & price | Email for specs & price |
One request
Request Availability for Your Shortlist.
Email Tommy to discuss these options. The listing IDs will already be in the email subject.
What still needs to be checked?
Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.
Match the nameplate to the specification · Review surplus equipment records · Procurement checklist