Your equipment shortlist
Compare equipment before you request it.
Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.
| Compare | ABB 133 MVA 115/13.2 kV Pre-Owned GSUJJ-TX-208 | 95 MVA 115/34.5 kV Virginia TransformerJJ-TX-101 |
|---|---|---|
| Manufacturer | ABB Power T&D | Virginia Transformer |
| Rating / output | 80/106.67/133.33 MVA at 55C rise; 89.6/119.47/149.33 MVA at 65C rise | 57/76/95 MVA |
| Voltage / winding arrangement | 115 kV grounded wye / 13.2 kV delta | 115/34.5 kV |
| Vector group | Grounded wye / delta; clock to confirm | Winding connections and phase shift to confirm |
| Frequency | 60 Hz | Not documented; confirm with J&J |
| Cooling | OA / FA / FA | Not documented; confirm with J&J |
| Impedance and base | 6.0% at 80 MVA | Not documented; confirm with J&J |
| Tap changer | Five-position de-energized HV tap changer, ±2 × 2.5% (±5%); 120.75 to 109.25 kV | Not documented; confirm with J&J |
| Insulation / BIL | HV winding and bushing 550 kV; LV winding/bushing and HV neutral 110 kV | Not documented; confirm with J&J |
| Quantity represented | One offered unit; subject to prior sale and written allocation | 2 schedule entries; distinct unit identities to confirm |
| Technical details / open items | OEM nameplate and supplied technical packet.; Design/nameplate basis: OA/FA/FA, 60 Hz, 55C / 65C dual ratings; Grounded wye / delta.; Tap changer: Five-position de-energized tap changer, +/-2 x 2.5% (+/-5%).; Impedance: 6.0% at 80 MVA; BIL: HV 550 kV; LV and HV neutral 110 kV.; Supplied June 2026 oil-analysis summary and OEM drawings/nameplate; inspection and complete reports available through J&J for qualified review.; Request current service history, inspection and full laboratory reports.; Two supplied equipment photographs are shown. Current condition and complete accessory scope require inspection; request the current matching photo set through J&J.; Ask J&J for current price, warranty, inspection and delivery terms. | Ratings and manufacturer are transcribed from the J&J-submitted schedule; verify them against the matching nameplate and current technical package.; Service history, present condition, frequency, winding arrangement, impedance, tap changer and accessories require unit-specific confirmation.; Historical schedule dates do not establish current dispatch timing, manufacture year or transferable warranty. Request present release terms and any applicable warranty in writing.; Repeated schedule entries are grouped here; quantity is not represented as independently verified stock. |
| Evidence reviewed | OEM nameplate and supplied technical packet | J&J-submitted inventory schedule; matching unit-specific technical records to confirm |
| Technical value basis | Supplied OEM nameplate and drawings; historical oil-analysis summary is separate from current condition. | Submitted inventory schedule; manufacturer and electrical rating are representations, not an individual nameplate match. |
| Details to confirm | Current inspection, complete oil laboratory reports, service history and accessory operation/completeness; Vector clock, final dismantling/loading schedule and current transport dimensions/weights | Individual identity and quantity, current photos, condition/service history and preservation; Frequency, cooling/rise, winding connections and clock, impedance/base, BIL, conductor/fluid and tap schedule; Factory/current tests, included accessories, dimensions/weights and final release/transport scope |
| Represented condition | Pre-owned installed surplus; detailed service history requires confirmation | Condition and service history require confirmation |
| Equipment location | Location confirmed with quotation | Location confirmed with quotation |
| Technical records reviewed | 2026-10-08 | 2026-10-08 |
| Availability | Offered for inspection and purchase; current release, disassembly and loading dates require written confirmation | Listed for inquiry by J&J; current allocation and release timing require written confirmation |
| Availability last confirmed | Request current confirmation | Request current confirmation |
| Shipping estimate | Request a written dispatch and delivery schedule | Request a written dispatch and delivery schedule |
| Nameplate reviewed | Yes — request the unit package | Not recorded as reviewed; request it |
| Drawings reviewed | Not recorded as reviewed; request them | Not recorded as reviewed; request them |
| Factory test report reviewed | Not recorded as reviewed; request test records | Not recorded as reviewed; request test records |
| This unit only | Email for specs & price | Email for specs & price |
One request
Request Availability for Your Shortlist.
Email Tommy to discuss these options. The listing IDs will already be in the email subject.
What still needs to be checked?
Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.
Match the nameplate to the specification · Review surplus equipment records · Procurement checklist
