Company base: Sugar Land, Texas · Nationwide sales · Tommy Marco

346-276-9540 tommy@jjtransformers.com

Your equipment shortlist

Compare equipment before you request it.

Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.

J&J Transformers LLC · 346-276-9540 · tommy@jjtransformers.com

Published specifications for 2 alternatives. Availability remains subject to prior sale and written reconfirmation.
Compare116 MVA 138 kV Transformer Positions — 2027JJ-TX-205120 MVA 138/34.5 kV Georgia Solar GSUJJ-TX-004
ManufacturerManufacturer disclosed in the qualified technical packageGeorgia Transformer
Rating / output116 MVA stated maximum72/96/120 MVA; 25.2/33.6/42 MVA tertiary
Voltage / winding arrangement138 kV HV; secondary voltage requires confirmation138/34.5 kV with 12 kV buried-delta tertiary
Vector groupRequires confirmationYNyn0+d1
FrequencyRequires confirmation60 Hz
CoolingNot documented; confirm with J&JONAN / ONAF1 / ONAF2
Impedance and baseNot documented; confirm with J&JMeasured H–X: 6.93% at 72 MVA; design value 7.2%
Tap changerNot documented; confirm with J&JHV OLTC; 117.3–158.7 kV (±15%); confirm the final switch and step schedule
Insulation / BILNot documented; confirm with J&JHV line 650 kV; HV neutral, LV line and LV neutral 200 kV
Quantity represented2 offered positions1 documented unit
Technical details / open itemsSeller offer summary; exact cooling stages require confirmation.; Ask J&J for the included U.S.-port shipping, commissioning and manufacturer warranty scope in the written offer.; Modifications can be reviewed before completion; feasibility, cost and schedule impact require OEM confirmation.; Any warranty provider, scope, transfer eligibility, start date and commissioning boundary must appear in the written quotation.Solar GSU design; ONAN/ONAF1/ONAF2, 60 Hz, three-phase; Vector group YNyn0+d1 with HV OLTC and conservator oil system; Nameplate rating is used; an outline-drawing discrepancy requires final seller confirmation
Evidence reviewedSeller offer summary; exact cooling stages require confirmationSerial-specific nameplate and approval drawings reviewed
Technical value basisReceived production offer and existing reviewed design package; final individual nameplates and factory tests remain pending.Supplied unit nameplate; the nameplate takes precedence over the differing outline-drawing rating.
Details to confirmMatch the final design/rating and drawing revision to each offered manufacturing position; Final frequency, cooling/rise, winding duty, impedance/base, BIL, taps, accessories and transport dimensions/weightsResolve the outline-drawing rating discrepancy and confirm the final drawing revision; Current preservation, complete tests, dimensions and included accessory schedule
Represented conditionFactory manufacturing position; completion pendingBrand new, never used and never energized; approval drawings reviewed
Equipment locationDispatch location confirmed with quotationUSA
Technical records reviewed2026-10-082026-10-08
Availability2027 manufacturing positions offered for allocation; current release terms require written confirmationAvailable; engineering package reviewed; subject to prior sale and written reconfirmation
Availability last confirmedRequest current confirmation2026-09-24
Shipping estimateProjected 2027 completion; shipment and receiving dates require written confirmationRequest a written dispatch and delivery schedule
Nameplate reviewedNot recorded as reviewed; request itYes — request the unit package
Drawings reviewedNot recorded as reviewed; request themYes — request matching unit drawings
Factory test report reviewedNot recorded as reviewed; request test recordsNot recorded as reviewed; request test records
This unit onlyEmail for specs & price Email for specs & price

One request

Request Availability for Your Shortlist.

Email Tommy to discuss these options. The listing IDs will already be in the email subject.

Email this shortlist

What still needs to be checked?

Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.

Match the nameplate to the specification · Review surplus equipment records · Procurement checklist

Call Email Sales