Your equipment shortlist
Compare equipment before you request it.
Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.
| Compare | 208 MVA 138/34.5 kV Transformer — 2027JJ-TX-203 | 120 MVA 138/34.5 kV Georgia Solar GSUJJ-TX-004 |
|---|---|---|
| Manufacturer | Manufacturer disclosed in the qualified technical package | Georgia Transformer |
| Rating / output | 125/166/208 MVA | 72/96/120 MVA; 25.2/33.6/42 MVA tertiary |
| Voltage / winding arrangement | 138 kV HV / 34.5 kV LV | 138/34.5 kV with 12 kV buried-delta tertiary |
| Vector group | Grounded wye / grounded wye | YNyn0+d1 |
| Frequency | 60 Hz | 60 Hz |
| Cooling | ONAN / ONAF1 / ONAF2 | ONAN / ONAF1 / ONAF2 |
| Impedance and base | H–X 9% at 125 MVA (supplied design sheet) | Measured H–X: 6.93% at 72 MVA; design value 7.2% |
| Tap changer | HV OLTC ±8 × 1.25% (±10%); no taps shown on X or Y windings | HV OLTC; 117.3–158.7 kV (±15%); confirm the final switch and step schedule |
| Insulation / BIL | HV line 650 kV; HV neutral, LV line and LV neutral 200 kV | HV line 650 kV; HV neutral, LV line and LV neutral 200 kV |
| Quantity represented | 1 offered position | 1 documented unit |
| Technical details / open items | Supplied design data sheet; final unit-specific nameplate and FAT pending.; Ask J&J for the included U.S.-port shipping, commissioning and manufacturer warranty scope in the written offer.; Modifications can be reviewed before completion; feasibility, cost and schedule impact require OEM confirmation.; Any warranty provider, scope, transfer eligibility, start date and commissioning boundary must appear in the written quotation.; Design basis: ONAN/ONAF1/ONAF2, 60 Hz, 65 C temperature rise; grounded-wye high and low sides.; HV OLTC design range ±10%; preliminary 13.8 kV open-delta tertiary. Final unit-specific configuration requires approval.; Design H-X impedance: 9% at a 125 MVA base. This is a design-sheet value, not a final tested result. | Solar GSU design; ONAN/ONAF1/ONAF2, 60 Hz, three-phase; Vector group YNyn0+d1 with HV OLTC and conservator oil system; Nameplate rating is used; an outline-drawing discrepancy requires final seller confirmation |
| Evidence reviewed | Supplied design data sheet; final unit-specific nameplate and FAT pending | Serial-specific nameplate and approval drawings reviewed |
| Technical value basis | Supplied guaranteed design sheet; these are design values, not final tested values for an individually matched unit. | Supplied unit nameplate; the nameplate takes precedence over the differing outline-drawing rating. |
| Details to confirm | Final unit-specific nameplate, approved revision, tested impedance/losses and final tertiary arrangement; Conductor, OLTC switch specification, complete accessories, current photos and preservation or manufacturing progress | Resolve the outline-drawing rating discrepancy and confirm the final drawing revision; Current preservation, complete tests, dimensions and included accessory schedule |
| Represented condition | Factory manufacturing position; completion pending | Brand new, never used and never energized; approval drawings reviewed |
| Equipment location | Dispatch location confirmed with quotation | USA |
| Technical records reviewed | 2026-10-08 | 2026-10-08 |
| Availability | 2027 manufacturing positions offered for allocation; current release terms require written confirmation | Available; engineering package reviewed; subject to prior sale and written reconfirmation |
| Availability last confirmed | Request current confirmation | 2026-09-24 |
| Shipping estimate | Projected 2027 completion; shipment and receiving dates require written confirmation | Request a written dispatch and delivery schedule |
| Nameplate reviewed | Not recorded as reviewed; request it | Yes — request the unit package |
| Drawings reviewed | Not recorded as reviewed; request them | Yes — request matching unit drawings |
| Factory test report reviewed | Not recorded as reviewed; request test records | Not recorded as reviewed; request test records |
| This unit only | Email for specs & price | Email for specs & price |
One request
Request Availability for Your Shortlist.
Email Tommy to discuss these options. The listing IDs will already be in the email subject.
What still needs to be checked?
Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.
Match the nameplate to the specification · Review surplus equipment records · Procurement checklist