Published specifications for 2 alternatives. Availability remains subject to prior sale and written reconfirmation.
Compare208 MVA 138/34.5 kV Transformer — 2027JJ-TX-203Five 110 MVA 138/34.5 kV Kolektor ETRA GSUsJJ-138-110-5
ManufacturerManufacturer disclosed in the qualified technical packageKolektor ETRA
Rating / output125/166/208 MVA66/88/110 MVA; 22/29.333/36.666 MVA tertiary
Voltage / winding arrangement138 kV HV / 34.5 kV LV138/34.5 kV with 13.8 kV tertiary
Vector groupGrounded wye / grounded wyeYNyn0+d11
Frequency60 Hz60 Hz
CoolingONAN / ONAF1 / ONAF2ONAN / ONAF1 / ONAF2
Impedance and baseH–X 9% at 125 MVA (supplied design sheet)Reviewed nameplate H–X: 8.09% at 66 MVA; supplied FAT reports 13.41% at 110 MVA. Match the test and plate to the selected unit.
Tap changerHV OLTC ±8 × 1.25% (±10%); no taps shown on X or Y windingsHV OLTC; 124.2–151.8 kV (±10%); 16 raise / 16 lower steps of 0.625% on the reviewed plate
Insulation / BILHV line 650 kV; HV neutral, LV line and LV neutral 200 kVNot documented; confirm with J&J
Quantity represented1 offered position5 units; matching unit packages available on request
Technical details / open itemsSupplied design data sheet; final unit-specific nameplate and FAT pending.; Ask J&J for the included U.S.-port shipping, commissioning and manufacturer warranty scope in the written offer.; Modifications can be reviewed before completion; feasibility, cost and schedule impact require OEM confirmation.; Any warranty provider, scope, transfer eligibility, start date and commissioning boundary must appear in the written quotation.; Design basis: ONAN/ONAF1/ONAF2, 60 Hz, 65 C temperature rise; grounded-wye high and low sides.; HV OLTC design range ±10%; preliminary 13.8 kV open-delta tertiary. Final unit-specific configuration requires approval.; Design H-X impedance: 9% at a 125 MVA base. This is a design-sheet value, not a final tested result.GSU duty; ONAN/ONAF1/ONAF2, 60 Hz, three-phase, vector group YNyn0+d11; Measured impedance: 13.41% on a 110 MVA base at nominal tap; 2020 factory tests passed; those records do not establish current condition; Five-unit lot includes two 2020 builds and three 2021 builds; request all five serial-specific packages before quotation
Evidence reviewedSupplied design data sheet; final unit-specific nameplate and FAT pendingFive-unit opportunity confirmed by seller; rating plate and FAT package reviewed for one unit
Technical value basisSupplied guaranteed design sheet; these are design values, not final tested values for an individually matched unit.One supplied nameplate and one factory-test package; values are not established for all five units.
Details to confirmFinal unit-specific nameplate, approved revision, tested impedance/losses and final tertiary arrangement; Conductor, OLTC switch specification, complete accessories, current photos and preservation or manufacturing progressAll five matching nameplates, insulation levels, approved drawings and factory tests; Reconcile unit-specific impedance bases; confirm current preservation and individual shipping weights
Represented conditionFactory manufacturing position; completion pendingBrand new, never used and never energized; 2020 factory records reviewed for one unit
Equipment locationDispatch location confirmed with quotationInternational; dispatch location confirmed with quotation
Technical records reviewed2026-10-082026-10-08
Availability2027 manufacturing positions offered for allocation; current release terms require written confirmationAvailable; 5 units represented; remaining unit packages require review; subject to prior sale and written confirmation
Availability last confirmedRequest current confirmation2026-09-24
Shipping estimateProjected 2027 completion; shipment and receiving dates require written confirmationRequest a written dispatch and delivery schedule
Nameplate reviewedNot recorded as reviewed; request itYes — request the unit package
Drawings reviewedNot recorded as reviewed; request themNot recorded as reviewed; request them
Factory test report reviewedNot recorded as reviewed; request test recordsReport reviewed; confirm matching records for each unit
This unit onlyEmail for specs & price Email for specs & price

One request

Request Availability for Your Shortlist.

Email Tommy to discuss these options. The listing IDs will already be in the email subject.

Email this shortlist

What still needs to be checked?

Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.

Match the nameplate to the specification · Review surplus equipment records · Procurement checklist

Call Email Sales