Company base: Sugar Land, Texas · Nationwide sales · Tommy Marco

346-276-9540 tommy@jjtransformers.com

Your equipment shortlist

Compare equipment before you request it.

Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.

J&J Transformers LLC · 346-276-9540 · tommy@jjtransformers.com

Published specifications for 2 alternatives. Availability remains subject to prior sale and written reconfirmation.
Compare26.7 MVA 46/12.47 kV Virginia TransformerJJ-TX-104120 MVA 138/34.5 kV Georgia Solar GSUJJ-TX-004
ManufacturerVirginia TransformerGeorgia Transformer
Rating / output16/21.3/26.7 MVA72/96/120 MVA; 25.2/33.6/42 MVA tertiary
Voltage / winding arrangement46/12.47 kV138/34.5 kV with 12 kV buried-delta tertiary
Vector groupWinding connections and phase shift to confirmYNyn0+d1
FrequencyNot documented; confirm with J&J60 Hz
CoolingNot documented; confirm with J&JONAN / ONAF1 / ONAF2
Impedance and baseNot documented; confirm with J&JMeasured H–X: 6.93% at 72 MVA; design value 7.2%
Tap changerNot documented; confirm with J&JHV OLTC; 117.3–158.7 kV (±15%); confirm the final switch and step schedule
Insulation / BILNot documented; confirm with J&JHV line 650 kV; HV neutral, LV line and LV neutral 200 kV
Quantity represented1 schedule entry; individual identity to confirm1 documented unit
Technical details / open itemsRatings and manufacturer are transcribed from the J&J-submitted schedule; verify them against the matching nameplate and current technical package.; Service history, present condition, frequency, winding arrangement, impedance, tap changer and accessories require unit-specific confirmation.; Historical schedule dates do not establish current dispatch timing, manufacture year or transferable warranty. Request present release terms and any applicable warranty in writing.Solar GSU design; ONAN/ONAF1/ONAF2, 60 Hz, three-phase; Vector group YNyn0+d1 with HV OLTC and conservator oil system; Nameplate rating is used; an outline-drawing discrepancy requires final seller confirmation
Evidence reviewedJ&J-submitted inventory schedule; matching unit-specific technical records to confirmSerial-specific nameplate and approval drawings reviewed
Technical value basisSubmitted inventory schedule; manufacturer and electrical rating are representations, not an individual nameplate match.Supplied unit nameplate; the nameplate takes precedence over the differing outline-drawing rating.
Details to confirmIndividual identity and quantity, current photos, condition/service history and preservation; Frequency, cooling/rise, winding connections and clock, impedance/base, BIL, conductor/fluid and tap schedule; Factory/current tests, included accessories, dimensions/weights and final release/transport scopeResolve the outline-drawing rating discrepancy and confirm the final drawing revision; Current preservation, complete tests, dimensions and included accessory schedule
Represented conditionCondition and service history require confirmationBrand new, never used and never energized; approval drawings reviewed
Equipment locationLocation confirmed with quotationUSA
Technical records reviewed2026-10-082026-10-08
AvailabilityListed for inquiry by J&J; current allocation and release timing require written confirmationAvailable; engineering package reviewed; subject to prior sale and written reconfirmation
Availability last confirmedRequest current confirmation2026-09-24
Shipping estimateRequest a written dispatch and delivery scheduleRequest a written dispatch and delivery schedule
Nameplate reviewedNot recorded as reviewed; request itYes — request the unit package
Drawings reviewedNot recorded as reviewed; request themYes — request matching unit drawings
Factory test report reviewedNot recorded as reviewed; request test recordsNot recorded as reviewed; request test records
This unit onlyEmail for specs & price Email for specs & price

One request

Request Availability for Your Shortlist.

Email Tommy to discuss these options. The listing IDs will already be in the email subject.

Email this shortlist

What still needs to be checked?

Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.

Match the nameplate to the specification · Review surplus equipment records · Procurement checklist

Call Email Sales