Company base: Sugar Land, Texas · Nationwide sales · Tommy Marco

346-276-9540 tommy@jjtransformers.com

Your equipment shortlist

Compare equipment before you request it.

Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.

J&J Transformers LLC · 346-276-9540 · tommy@jjtransformers.com

Published specifications for 2 alternatives. Availability remains subject to prior sale and written reconfirmation.
Compare95 MVA 115/34.5 kV Virginia TransformerJJ-TX-10160 MVA 115/34.5 kV Virginia TransformersJJ-TX-006
ManufacturerVirginia TransformerVirginia Transformer Corp.
Rating / output57/76/95 MVA36/48/60 MVA
Voltage / winding arrangement115/34.5 kV115 kV delta / 34.5 kV grounded wye
Vector groupWinding connections and phase shift to confirmDyn1
FrequencyNot documented; confirm with J&J60 Hz
CoolingNot documented; confirm with J&JONAN / ONAF / ONAF
Impedance and baseNot documented; confirm with J&J8.42%, 8.41% and 8.46% at 36 MVA, by unit
Tap changerNot documented; confirm with J&JABB HV LTC; 103.5–126.5 kV (±10%); 16 raise / 16 lower steps of 0.625%
Insulation / BILNot documented; confirm with J&JHV line 550 kV; LV 200 kV
Quantity represented2 schedule entries; distinct unit identities to confirm3 units
Technical details / open itemsRatings and manufacturer are transcribed from the J&J-submitted schedule; verify them against the matching nameplate and current technical package.; Service history, present condition, frequency, winding arrangement, impedance, tap changer and accessories require unit-specific confirmation.; Historical schedule dates do not establish current dispatch timing, manufacture year or transferable warranty. Request present release terms and any applicable warranty in writing.; Repeated schedule entries are grouped here; quantity is not represented as independently verified stock.ONAN/ONAF/ONAF, 60 Hz, three-phase, vector group Dyn1; Measured impedance: 8.42%, 8.41%, and 8.46% at 36 MVA by unit; Copper windings, Type II mineral oil, and ABB HV LTC
Evidence reviewedJ&J-submitted inventory schedule; matching unit-specific technical records to confirmThree unit-specific nameplates reviewed
Technical value basisSubmitted inventory schedule; manufacturer and electrical rating are representations, not an individual nameplate match.Three individual nameplates reviewed; the impedance values vary by unit.
Details to confirmIndividual identity and quantity, current photos, condition/service history and preservation; Frequency, cooling/rise, winding connections and clock, impedance/base, BIL, conductor/fluid and tap schedule; Factory/current tests, included accessories, dimensions/weights and final release/transport scopeMatch each unit to its factory tests and approved accessory schedule; Current preservation, overall/shipping dimensions and individual shipping weights
Represented conditionCondition and service history require confirmationBrand new, never used and never energized; February-March 2026 nameplates reviewed
Equipment locationLocation confirmed with quotationUSA
Technical records reviewed2026-10-082026-10-08
AvailabilityListed for inquiry by J&J; current allocation and release timing require written confirmationAvailable; three unit-specific nameplates reviewed; subject to prior sale and written reconfirmation
Availability last confirmedRequest current confirmation2026-09-24
Shipping estimateRequest a written dispatch and delivery scheduleRequest a written dispatch and delivery schedule
Nameplate reviewedNot recorded as reviewed; request itYes — request the unit package
Drawings reviewedNot recorded as reviewed; request themNot recorded as reviewed; request them
Factory test report reviewedNot recorded as reviewed; request test recordsNot recorded as reviewed; request test records
This unit onlyEmail for specs & price Email for specs & price

One request

Request Availability for Your Shortlist.

Email Tommy to discuss these options. The listing IDs will already be in the email subject.

Email this shortlist

What still needs to be checked?

Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.

Match the nameplate to the specification · Review surplus equipment records · Procurement checklist

Call Email Sales