Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.
| Compare | 60 MVA 115/34.5 kV Virginia TransformersJJ-TX-006 | 110 MVA 115/34.5 kV ABB TransformerJJ-TX-103 |
|---|---|---|
| Manufacturer | Virginia Transformer Corp. | ABB |
| Rating / output | 36/48/60 MVA | 66/88/110 MVA |
| Voltage / winding arrangement | 115 kV delta / 34.5 kV grounded wye | 115/34.5 kV |
| Vector group | Dyn1 | Winding connections and phase shift to confirm |
| Frequency | 60 Hz | Not documented; confirm with J&J |
| Cooling | ONAN / ONAF / ONAF | Not documented; confirm with J&J |
| Impedance and base | 8.42%, 8.41% and 8.46% at 36 MVA, by unit | Not documented; confirm with J&J |
| Tap changer | ABB HV LTC; 103.5–126.5 kV (±10%); 16 raise / 16 lower steps of 0.625% | Not documented; confirm with J&J |
| Insulation / BIL | HV line 550 kV; LV 200 kV | Not documented; confirm with J&J |
| Quantity represented | 3 units | 1 schedule entry; individual identity to confirm |
| Technical details / open items | ONAN/ONAF/ONAF, 60 Hz, three-phase, vector group Dyn1; Measured impedance: 8.42%, 8.41%, and 8.46% at 36 MVA by unit; Copper windings, Type II mineral oil, and ABB HV LTC | Ratings and manufacturer are transcribed from the J&J-submitted schedule; verify them against the matching nameplate and current technical package.; Service history, present condition, frequency, winding arrangement, impedance, tap changer and accessories require unit-specific confirmation.; Historical schedule dates do not establish current dispatch timing, manufacture year or transferable warranty. Request present release terms and any applicable warranty in writing. |
| Evidence reviewed | Three unit-specific nameplates reviewed | J&J-submitted inventory schedule; matching unit-specific technical records to confirm |
| Technical value basis | Three individual nameplates reviewed; the impedance values vary by unit. | Submitted inventory schedule; manufacturer and electrical rating are representations, not an individual nameplate match. |
| Details to confirm | Match each unit to its factory tests and approved accessory schedule; Current preservation, overall/shipping dimensions and individual shipping weights | Individual identity and quantity, current photos, condition/service history and preservation; Frequency, cooling/rise, winding connections and clock, impedance/base, BIL, conductor/fluid and tap schedule; Factory/current tests, included accessories, dimensions/weights and final release/transport scope |
| Represented condition | Brand new, never used and never energized; February-March 2026 nameplates reviewed | Condition and service history require confirmation |
| Equipment location | USA | Location confirmed with quotation |
| Technical records reviewed | 2026-10-08 | 2026-10-08 |
| Availability | Available; three unit-specific nameplates reviewed; subject to prior sale and written reconfirmation | Listed for inquiry by J&J; current allocation and release timing require written confirmation |
| Availability last confirmed | 2026-09-24 | Request current confirmation |
| Shipping estimate | Request a written dispatch and delivery schedule | Request a written dispatch and delivery schedule |
| Nameplate reviewed | Yes — request the unit package | Not recorded as reviewed; request it |
| Drawings reviewed | Not recorded as reviewed; request them | Not recorded as reviewed; request them |
| Factory test report reviewed | Not recorded as reviewed; request test records | Not recorded as reviewed; request test records |
| This unit only | Email for specs & price | Email for specs & price |
One request
Request Availability for Your Shortlist.
Email Tommy to discuss these options. The listing IDs will already be in the email subject.
What still needs to be checked?
Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.