Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.
| Compare | 300 MVA 138/34.5 kV Georgia TransformerJJ-TX-001 | Five 110 MVA 138/34.5 kV Kolektor ETRA GSUsJJ-138-110-5 |
|---|---|---|
| Manufacturer | Georgia Transformer | Kolektor ETRA |
| Rating / output | 180/240/300 MVA; 63/84/105 MVA tertiary | 66/88/110 MVA; 22/29.333/36.666 MVA tertiary |
| Voltage / winding arrangement | 138/34.5 kV with 12 kV buried-delta tertiary | 138/34.5 kV with 13.8 kV tertiary |
| Vector group | YNyn0+d1 | YNyn0+d11 |
| Frequency | Not documented; confirm with J&J | 60 Hz |
| Cooling | Not documented; confirm with J&J | ONAN / ONAF1 / ONAF2 |
| Impedance and base | Not documented; confirm with J&J | Reviewed nameplate H–X: 8.09% at 66 MVA; supplied FAT reports 13.41% at 110 MVA. Match the test and plate to the selected unit. |
| Tap changer | Not documented; confirm with J&J | HV OLTC; 124.2–151.8 kV (±10%); 16 raise / 16 lower steps of 0.625% on the reviewed plate |
| Insulation / BIL | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Quantity represented | 1 documented unit | 5 units; matching unit packages available on request |
| Technical details / open items | ONAN/ONAF/ONAF, 60 Hz, three-phase, vector group YNyn0+d1; Measured 138/34.5 kV impedance: 9.67% on a 180 MVA base; Copper windings, conservator system, Type II mineral oil, and HV OLTC | GSU duty; ONAN/ONAF1/ONAF2, 60 Hz, three-phase, vector group YNyn0+d11; Measured impedance: 13.41% on a 110 MVA base at nominal tap; 2020 factory tests passed; those records do not establish current condition; Five-unit lot includes two 2020 builds and three 2021 builds; request all five serial-specific packages before quotation |
| Evidence reviewed | Serial-specific nameplate reviewed | Five-unit opportunity confirmed by seller; rating plate and FAT package reviewed for one unit |
| Technical value basis | Serial-specific nameplate reviewed | Reviewed nameplate, factory-test package and original general/transport drawings cover individual units in the five-unit lot; verify the selected unit before using these values. |
| Details to confirm | Matching technical records, current condition, complete equipment scope and transport details | All five matching nameplates, insulation levels, approved drawings and factory tests; Reconcile unit-specific impedance bases; confirm current preservation and individual shipping weights |
| Represented condition | Brand new, never used and never energized; 2020 nameplate reviewed | Brand new, never used and never energized; 2020 factory records reviewed for one unit |
| Equipment location | USA | International; dispatch location confirmed with quotation |
| Technical records reviewed | 2026-10-08 | 2026-10-08 |
| Availability | Available for sale — confirmed by J&J October 8, 2026; quotation and release terms on request | Available; 5 units represented; remaining unit packages require review; subject to prior sale and written confirmation |
| Availability last confirmed | 2026-10-08 | 2026-09-24 |
| Shipping estimate | Request a written dispatch and delivery schedule | Request a written dispatch and delivery schedule |
| Nameplate reviewed | Yes — request the unit package | Yes — request the unit package |
| Drawings reviewed | Not recorded as reviewed; request them | Not recorded as reviewed; request them |
| Factory test report reviewed | Not recorded as reviewed; request test records | Report reviewed; confirm matching records for each unit |
| This unit only | Request more info | Request more info |
One request
Request Availability for Your Shortlist.
Email Tommy to discuss these options. The listing IDs will already be in the email subject.
What still needs to be checked?
Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.