CompareShin Nippon 62 MW Biomass Steam Power PlantJJ-TUR-017GE TM2500+ 33.9 MW Mobile Gas Turbine — 60 HzJJ-TUR-002
ManufacturerShin NipponGE
Rating / output62 MW reported output33.9 MW reported output
Voltage / winding arrangement11 kVGenerator voltage to confirm
Vector groupNot applicable; generator connection to confirmNot applicable; generator connection to confirm
Frequency60 Hz60 Hz
CoolingNot documented; confirm with J&JNot documented; confirm with J&J
Impedance and baseNot documented; confirm with J&JNot documented; confirm with J&J
Tap changerNot documented; confirm with J&JNot documented; confirm with J&J
Insulation / BILNot documented; confirm with J&JNot documented; confirm with J&J
Quantity represented1 offered plant1 offered package
Technical details / open itemsRequest matching turbine, generator and boiler technical records, inlet and exhaust conditions, and exact hours.; Confirm fuel-handling, emissions controls, balance of plant, dismantling and shipping scope.; Availability was offered September 23 and requires a current written quotation.SAC combustion configuration reported; this is not represented as DLE.; Zero time since overhaul does not mean new manufacture or zero lifetime operating hours.; Allocation, reassembly scope and release require current written confirmation.
Evidence reviewedWritten equipment offer; unit-specific technical records and identity to confirmWritten equipment offer; unit-specific technical records and identity to confirm
Technical value basisReceived equipment offer; ratings, history and scope are representations until matched to the selected package.Received equipment offer; ratings, history and scope are representations until matched to the selected package.
Details to confirmMatching engine/turbine and generator nameplates, individual hours/starts, maintenance/overhaul records and current tests; Electrical duty, site-output basis, fuel/emissions, complete auxiliaries and loading/dismantling/transport scopeMatching engine/turbine and generator nameplates, individual hours/starts, maintenance/overhaul records and current tests; Electrical duty, site-output basis, fuel/emissions, complete auxiliaries and loading/dismantling/transport scope
Represented conditionUsed; low-hour condition represented, exact hours to confirmZero time since reported GE overhaul; previously operated equipment
Equipment locationLocation confirmed with quotationLocation confirmed with quotation
Technical records reviewed2026-10-082026-10-08
AvailabilityOffered subject to prior sale; current availability and release schedule to confirmOffered subject to prior sale; Approximately two months quoted; current schedule to confirm
Availability last confirmedRequest current confirmationRequest current confirmation
Shipping estimateRequest a written dispatch and delivery scheduleApproximately two months quoted; current schedule to confirm
Nameplate reviewedNot recorded as reviewed; request itNot recorded as reviewed; request it
Drawings reviewedNot recorded as reviewed; request themNot recorded as reviewed; request them
Factory test report reviewedNot recorded as reviewed; request test recordsNot recorded as reviewed; request test records
This unit onlyEmail for specs & price Email for specs & price

One request

Request Availability for Your Shortlist.

Email Tommy to discuss these options. The listing IDs will already be in the email subject.

Email this shortlist

What still needs to be checked?

Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.

Match the nameplate to the specification · Review surplus equipment records · Procurement checklist

Call Email Sales