Your equipment shortlist
Compare equipment before you request it.
Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.
| Compare | Siemens SGT-600 DLE 35 MW Combined-Cycle PlantJJ-TUR-013 | GE TM2500+ 33.9 MW Mobile Gas Turbine — 60 HzJJ-TUR-002 |
|---|---|---|
| Manufacturer | Siemens | GE |
| Rating / output | 25 MW gas turbine + 10 MW steam turbine; 35 MW reported total | 33.9 MW reported output |
| Voltage / winding arrangement | 10.5 kV reported | Generator voltage to confirm |
| Vector group | Not applicable; generator connection to confirm | Not applicable; generator connection to confirm |
| Frequency | 50 Hz | 60 Hz |
| Cooling | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Impedance and base | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Tap changer | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Insulation / BIL | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Quantity represented | 1 offered complete plant | 1 offered package |
| Technical details / open items | The supplied specification states natural gas with dual-fuel capability, DLE combustion, 10.5 kV and 50 Hz.; The supplied history records the last run in December 2017, later periodic starting activity and long-term preservation; request current preservation, inspection and recommissioning evidence.; Offered scope includes combustion-chamber hot-air drying and HRSG steam-drum desiccant preservation. Current preservation and package completeness require inspection.; Request current technical records, scope, inspection arrangements and dismantling responsibilities.; This plant is separate from the 24.5 MW SGT-600 full-package offers. | SAC combustion configuration reported; this is not represented as DLE.; Zero time since overhaul does not mean new manufacture or zero lifetime operating hours.; Allocation, reassembly scope and release require current written confirmation. |
| Evidence reviewed | Written equipment offer; unit-specific technical records and identity to confirm | Written equipment offer; unit-specific technical records and identity to confirm |
| Technical value basis | Received equipment offer; ratings, history and scope are representations until matched to the selected package. | Received equipment offer; ratings, history and scope are representations until matched to the selected package. |
| Details to confirm | Actual service-hour history, maintenance and preservation records, current condition/tests and exact supplied scope; Recommissioning inspection, dismantling/loading and final transport boundary | Matching engine/turbine and generator nameplates, individual hours/starts, maintenance/overhaul records and current tests; Electrical duty, site-output basis, fuel/emissions, complete auxiliaries and loading/dismantling/transport scope |
| Represented condition | Used; 553 equivalent working hours reported; actual service hours to confirm | Zero time since reported GE overhaul; previously operated equipment |
| Equipment location | Location confirmed with quotation | Location confirmed with quotation |
| Technical records reviewed | 2026-10-08 | 2026-10-08 |
| Availability | Offered subject to prior sale; current availability and release schedule to confirm | Offered subject to prior sale; Approximately two months quoted; current schedule to confirm |
| Availability last confirmed | Request current confirmation | Request current confirmation |
| Shipping estimate | Request a written dispatch and delivery schedule | Approximately two months quoted; current schedule to confirm |
| Nameplate reviewed | Not recorded as reviewed; request it | Not recorded as reviewed; request it |
| Drawings reviewed | Not recorded as reviewed; request them | Not recorded as reviewed; request them |
| Factory test report reviewed | Not recorded as reviewed; request test records | Not recorded as reviewed; request test records |
| This unit only | Email for specs & price | Email for specs & price |
One request
Request Availability for Your Shortlist.
Email Tommy to discuss these options. The listing IDs will already be in the email subject.
What still needs to be checked?
Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.
Match the nameplate to the specification · Review surplus equipment records · Procurement checklist