Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.
| Compare | GE LM6000 PC 48 MW Refurbishment FleetJJ-TUR-007 | GE TM2500+ 33.9 MW Mobile Gas Turbine — 60 HzJJ-TUR-002 |
|---|---|---|
| Manufacturer | GE | GE |
| Rating / output | 48 MW nameplate per unit; final fleet output to confirm | 33.9 MW reported output |
| Voltage / winding arrangement | Generator voltage to confirm | Generator voltage to confirm |
| Vector group | Not applicable; generator connection to confirm | Not applicable; generator connection to confirm |
| Frequency | Currently 50 Hz; 60 Hz conversion offered subject to engineering | 60 Hz |
| Cooling | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Impedance and base | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Tap changer | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Insulation / BIL | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Quantity represented | 6 offered units | 1 offered package |
| Technical details / open items | The offer's aggregate fleet figure differs from six times the stated per-unit nameplate. No unverified total is published.; A proposed 60 Hz conversion requires a defined engineering scope, output rating, generator compatibility and acceptance tests.; These units are not represented as ready for immediate shipment. | SAC combustion configuration reported; this is not represented as DLE.; Zero time since overhaul does not mean new manufacture or zero lifetime operating hours.; Allocation, reassembly scope and release require current written confirmation. |
| Evidence reviewed | Written equipment offer; unit-specific technical records and identity to confirm | Written equipment offer; unit-specific technical records and identity to confirm |
| Technical value basis | Received equipment offer; ratings, history and scope are representations until matched to the selected package. | Received equipment offer; ratings, history and scope are representations until matched to the selected package. |
| Details to confirm | Reconcile the fleet total, match all six units and confirm conversion/output ratings; Final generator/auxiliary scope, overhaul records and completed acceptance tests | Matching engine/turbine and generator nameplates, individual hours/starts, maintenance/overhaul records and current tests; Electrical duty, site-output basis, fuel/emissions, complete auxiliaries and loading/dismantling/transport scope |
| Represented condition | Refurbishment program; technical package and completion pending | Zero time since reported GE overhaul; previously operated equipment |
| Equipment location | Location confirmed with quotation | Location confirmed with quotation |
| Technical records reviewed | 2026-10-08 | 2026-10-08 |
| Availability | Offered subject to prior sale; Target readiness February–March 2027; current schedule to confirm | Offered subject to prior sale; Approximately two months quoted; current schedule to confirm |
| Availability last confirmed | Request current confirmation | Request current confirmation |
| Shipping estimate | Target readiness February–March 2027; current schedule to confirm | Approximately two months quoted; current schedule to confirm |
| Nameplate reviewed | Not recorded as reviewed; request it | Not recorded as reviewed; request it |
| Drawings reviewed | Not recorded as reviewed; request them | Not recorded as reviewed; request them |
| Factory test report reviewed | Not recorded as reviewed; request test records | Not recorded as reviewed; request test records |
| This unit only | Request more info | Request more info |
One request
Request Availability for Your Shortlist.
Email Tommy to discuss these options. The listing IDs will already be in the email subject.
What still needs to be checked?
Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.
Match the nameplate to the specification · Review surplus equipment records · Procurement checklist