Your equipment shortlist
Compare equipment before you request it.
Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.
| Compare | GE LM6000 PC 48 MW Refurbishment FleetJJ-TUR-007 | GE TM2500 Gen 6 29 MW Mobile Gas TurbineJJ-TUR-001 |
|---|---|---|
| Manufacturer | GE | GE |
| Rating / output | 48 MW nameplate per unit; final fleet output to confirm | 29 MW reported output; installed configuration and site output to confirm |
| Voltage / winding arrangement | Generator voltage to confirm | 11.5 kV represented |
| Vector group | Not applicable; generator connection to confirm | Not applicable; generator connection to confirm |
| Frequency | Currently 50 Hz; 60 Hz conversion offered subject to engineering | 50/60 Hz advertised; conflicting 50 Hz field — installed configuration to confirm |
| Cooling | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Impedance and base | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Tap changer | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Insulation / BIL | Not documented; confirm with J&J | Not documented; confirm with J&J |
| Quantity represented | 6 offered units | 1 offered package |
| Technical details / open items | The offer's aggregate fleet figure differs from six times the stated per-unit nameplate. No unverified total is published.; A proposed 60 Hz conversion requires a defined engineering scope, output rating, generator compatibility and acceptance tests.; These units are not represented as ready for immediate shipment. | Two supplier-provided equipment photos from the October 2, 2026 offer are shown. Matching nameplates, service records and current condition are requested with the quotation.; Confirm generator frequency, fuel system, controls, transport scope and hours before technical acceptance.; Availability has not been independently reconfirmed; this is separate from the 33.9 MW TM2500+ listing. |
| Evidence reviewed | Written equipment offer; unit-specific technical records and identity to confirm | Written equipment offer; unit-specific technical records and identity to confirm |
| Technical value basis | Received equipment offer; ratings, history and scope are representations until matched to the selected package. | Received equipment offer; ratings, history and scope are representations until matched to the selected package. |
| Details to confirm | Reconcile the fleet total, match all six units and confirm conversion/output ratings; Final generator/auxiliary scope, overhaul records and completed acceptance tests | Matching turbine/generator nameplates, actual installed frequency, maintenance records and final auxiliary/trailer scope |
| Represented condition | Refurbishment program; technical package and completion pending | Used; former standby service represented; current condition and maintenance history to confirm |
| Equipment location | Location confirmed with quotation | Location confirmed with quotation |
| Technical records reviewed | 2026-10-08 | 2026-10-08 |
| Availability | Offered subject to prior sale; Target readiness February–March 2027; current schedule to confirm | Offered subject to prior sale; current availability and release schedule to confirm |
| Availability last confirmed | Request current confirmation | Request current confirmation |
| Shipping estimate | Target readiness February–March 2027; current schedule to confirm | Request a written dispatch and delivery schedule |
| Nameplate reviewed | Not recorded as reviewed; request it | Not recorded as reviewed; request it |
| Drawings reviewed | Not recorded as reviewed; request them | Not recorded as reviewed; request them |
| Factory test report reviewed | Not recorded as reviewed; request test records | Not recorded as reviewed; request test records |
| This unit only | Request more info | Request more info |
One request
Request Availability for Your Shortlist.
Email Tommy to discuss these options. The listing IDs will already be in the email subject.
What still needs to be checked?
Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.
Match the nameplate to the specification · Review surplus equipment records · Procurement checklist