Company base: Sugar Land, Texas · Nationwide sales · Tommy Marco

346-276-9540 tommy@jjtransformers.com

Your equipment shortlist

Compare equipment before you request it.

Review the published facts side by side. Matching a voltage or MVA rating does not establish compatibility. Ask your project engineer to review the complete unit records.

J&J Transformers LLC · 346-276-9540 · tommy@jjtransformers.com

Published specifications for 2 alternatives. Availability remains subject to prior sale and written reconfirmation.
CompareGE LM6000 PD SPRINT 46 MW Cogeneration PlantJJ-TUR-006GE TM2500+ 33.9 MW Mobile Gas Turbine — 60 HzJJ-TUR-002
ManufacturerGEGE
Rating / output46 MW reported output33.9 MW reported output
Voltage / winding arrangement11.5 kVGenerator voltage to confirm
Vector groupNot applicable; generator connection to confirmNot applicable; generator connection to confirm
Frequency50 Hz60 Hz
CoolingNot documented; confirm with J&JNot documented; confirm with J&J
Impedance and baseNot documented; confirm with J&JNot documented; confirm with J&J
Tap changerNot documented; confirm with J&JNot documented; confirm with J&J
Insulation / BILNot documented; confirm with J&JNot documented; confirm with J&J
Quantity represented1 offered plant1 offered package
Technical details / open itemsThe supplied technical package lists a Brush generator rated 50.8 MW / 63.5 MVA at 11.5 kV, 50 Hz, 0.8 power factor. That generator rating is separate from the offered 46 MW plant rating.; Reported HRSG duty: 52 t/hr, 103 barg, 313°C; confirm the actual steam performance and current equipment condition.; The package lists a Lufkin gearbox, Woodward/MicroNet controls, Bently Nevada monitoring and ABB DCS; confirm included configurations and revisions.; The technical package reports a December 2024 GE inspection and serviceable borescope findings; request the underlying report and current inspection.; Dismantling is required; included scope, isolation, removal, packing and transport must be agreed.; Confirm net output, steam duty, operating history, current condition and release schedule.SAC combustion configuration reported; this is not represented as DLE.; Zero time since overhaul does not mean new manufacture or zero lifetime operating hours.; Allocation, reassembly scope and release require current written confirmation.
Evidence reviewedWritten equipment offer; unit-specific technical records and identity to confirmWritten equipment offer; unit-specific technical records and identity to confirm
Technical value basisReceived equipment offer; ratings, history and scope are representations until matched to the selected package.Received equipment offer; ratings, history and scope are representations until matched to the selected package.
Details to confirmCurrent hours/starts, overhaul and inspection records, actual fuel/emissions and net output/steam duty; Matching generator/breaker ratings, final scope, dismantling, isolation, packing and loading responsibilitiesMatching engine/turbine and generator nameplates, individual hours/starts, maintenance/overhaul records and current tests; Electrical duty, site-output basis, fuel/emissions, complete auxiliaries and loading/dismantling/transport scope
Represented conditionUsed; factory-refurbished engine reportedly installed in 2021Zero time since reported GE overhaul; previously operated equipment
Equipment locationLocation confirmed with quotationLocation confirmed with quotation
Technical records reviewed2026-10-082026-10-08
AvailabilityOffered subject to prior sale; current availability and release schedule to confirmOffered subject to prior sale; Approximately two months quoted; current schedule to confirm
Availability last confirmedRequest current confirmationRequest current confirmation
Shipping estimateRequest a written dispatch and delivery scheduleApproximately two months quoted; current schedule to confirm
Nameplate reviewedNot recorded as reviewed; request itNot recorded as reviewed; request it
Drawings reviewedNot recorded as reviewed; request themNot recorded as reviewed; request them
Factory test report reviewedNot recorded as reviewed; request test recordsNot recorded as reviewed; request test records
This unit only Request more info Request more info

One request

Request Availability for Your Shortlist.

Email Tommy to discuss these options. The listing IDs will already be in the email subject.

Email this shortlist

What still needs to be checked?

Confirm frequency, cooling-stage ratings, impedance and its base, taps, vector group, grounding, BIL, site conditions and included scope against the project specification. A table cannot approve the fit.

Match the nameplate to the specification · Review surplus equipment records · Procurement checklist

Call Email Sales